Loading...
HomeMy WebLinkAboutResolution 2025-44, Task Authorization Number 11- 3rd Stree SE Stormwater Pond EvaluationCity of East Wenatchee Resolution 2025-44 with Exhibit A Retain Resolution until no longer needed for City -business, then transfer to Washington State Archives (GS50-05A-16 Rev. 1) Page 1 of 2 City of East Wenatchee, Washington Resolution No. 2025-44 A Resolution of the City of East Wenatchee, Washington authorizing the Mayor to execute a Task Authorization with RH2 Engineering to evaluate the feasibility of modifications to the 3rd St SE stormwater pond. 1.Alternate format. 1.1. Para leer este documento en otro formato (español, Braille, leer en voz alta, etc.), póngase en contacto con la administradora municipal al alternateformat@eastwenatcheewa.gov, al (509) 884-9515 o al 711 (TTY). 1.2. To read this document in an alternate format (Spanish, Braille, read aloud, etc.), please contact the City Clerk at alternateformat@eastwenatcheewa.gov, at (509) 884-9515, or at 711 (TTY). 2.Authority. 2.1. RCW 35A.11.020 and RCW 35A.12.190 authorize the City Council to organize and regulate its internal affairs and to define the powers, functions and duties of its officers and employees. THE CITY COUNCIL OF THE CITY OF EAST WENATCHEE DO RESOLVE AS FOLLOWS: 3.Authorization. The City Council authorizes the Mayor to execute a Task Authorization that conforms to the language set forth in Exhibit A. 4.Severability. If a court of competent jurisdiction declares any provision in this resolution to be contrary to law, such declaration shall not affect the validity of the other provisions of this Resolution. 5.Effective date. This Resolution becomes effective immediately. City of East Wenatchee Resolution 2025-44 City of East Wenatchee Resolution 2025-44 Passed by the City Council of East Wenatchee, at a regular meeting thereof on this 7th day of October, 2025. The City of East Wenatchee, Washington . rpic3uBy~- Jeiillea Ci'awfuid, M:ayor ?tD T-C^YI Attest: ( /[^u\VMV^ inna Laura Leon, Cit^ Clerk Approved as to forni only: City Attorney Filed with the City Clerk: Passed by the City Council: Effective Date: 10-02-2025 10-07-2025 10-07-2025 City of East Wenatchee Resolution 2025-44 with Exhibit A Retain Resolution until no longer needed for City-business, then transfer to Washington State Archives (GS50-05A-16 Rev. l) Page 2 of 2 1 10/1/2025 9:08:30 AM J:\Data\EW\21-0133\00 Contract\TA 11\TA11_AGMT_3rd St SE Storwmater.docx Task Authorization No.11 City of East Wenatchee 3rd Street SE Stormwater Pond Evaluation September 2025 RH2 Project No.EW 0210133.11 In accordance with our Professional Services Agreement for 2021 General Engineering Services, dated February 16, 2021, this Task Authorization outlines the Scope of Work for the 3rd Street SE Stormwater Pond Evaluation. The work will be performed and invoiced in compliance with the terms and conditions listed in the governing Agreement and any issued Contract Amendments. Background The City of East Wenatchee (City)is responding to a request from Apple Valley Honda to evaluate the ability to fill in an existing pond that lies within land owned by the City at the southwest intersection of 3rd Street SE and Highline Drive.If feasible, the property could be used for both stormwater and other purposes after being filled in. Task 1 –Feasibility Analysis Objective:Determine what, if any,underground stormwater systems are available to allow the existing pond to be filled in without reducing stormwater functions.Conduct on-site infiltration testing and utilize this information to model existing conditions. Summarize the findings in a technical memorandum. Approach: Conduct on-site infiltration testing.City will provide excavation and water. RH2 will provide on-site field representative to conduct infiltration test. Perform a basin analysis utilizing HydroCAD Stormwater Modeling System Version 10.20-5c. Identify one (1)underground stormwater system option that maintains the treatment and infiltration capacity of the existing pond, if possible. Provide an Engineer’s opinion of probable construction costs (OPCC)for the proposed stormwater solution.If a proposed stormwater solution cannot be found, this subtask will not be completed. Summarize the findings of the infiltration testing and analysis in a technical memorandum. Assumptions: RH2 will rely upon the accuracy and completeness of any information, data, and materials generated or produced by the City or others in relation to this Scope of Work. No topographic survey will be completed.Basin modeling will be based on available contour data from the City or other publicly available data. Provided by City: Equipment, labor,and water to conduct infiltration testing. Exhibit A City of East Wenatchee Resolution 2025-44 City of East Wenatchee Task Authorization No.11 General Engineering Services 3rd Street SE Stormwater Pond Evaluation 2 9/26/25 4:02 PM J:\Data\EW\21-0133\00 Contract\TA 11\TA11_AGMT_3rd St SE Storwmater.docx RH2 Deliverables: Technical memorandum in electronic PDF. Project Schedule This work will be completed within thirty (30)days of execution. Subconsultants No subconsultants are proposed. Fee for Services The fee for services shall be on a time and expense basis and shall not exceed $15,000.00 as shown on the attached Exhibit A,Fee Estimate without prior written authorization of the City. RH2 Engineering, Inc. 300 Simon Street SE, East Wenatchee, WA 98802 City of East Wenatchee 271 9th Street NE, East Wenatchee, WA 98802 SIGNATURE DATE SIGNATURE DATE PRINT NAME & TITLE PRINT NAME &TITLE 9/26/25 Exhibit A City of East Wenatchee Resolution 2025-44 EXHIBIT A Fee Estimate Task Authorization No. 11 City of East Wenatchee General Engineering Services 3rd Street SE Stormwater Pond Evaluation Sep-25 Description Total Hours Total RH2 Labor Total Expense Total Cost Task 1 Feasibility Analysis 64 14,015$ 985$ 15,000$ PROJECT TOTAL 64 14,015$ 985$ 15,000$ J:\Data\EW\21-0133\00 Contract\TA 11\TA11_FEE_3rd St SE Storwmater.docx 9/26/2025 4:00 PM Exhibit A City of East Wenatchee Resolution 2025-44