HomeMy WebLinkAboutResolution 2025-38 N Kentucky Ave Grant AgreementCity of East Wenatchee Resolution 2025-38 with Exhibit A
Retain Resolution until no longer needed for City -business, then transfer to Washington State
Archives (GS50-05A-16 Rev. 1)
Page 1 of 2
City of East Wenatchee, Washington
Resolution No. 2025-38
A Resolution of the City of East Wenatchee, Washington authorizing
the Mayor to execute a contract between the City of East Wenatchee
and the Washington State Department of Transportation for the N
Kentucky Ave Improvements Project.
1. Alternate format.
1.1. Para leer este documento en otro formato (español, Braille,
leer en voz alta, etc.), póngase en contacto con el vendedor de la
ciudad al alternateformat@eastwenatcheewa.gov, al (509) 884-
9515 o al 711 (TTY).
1.2. To read this document in an alternate format (Spanish,
Braille, read aloud, etc.), please contact the City Clerk at
alternateformat@eastwenatcheewa.gov, at (509) 884-9515, or at
711 (TTY).
2. Authority.
2.1. RCW 35A.11.020 and RCW 35A.12.190 authorize the City
Council to organize and regulate its internal affairs and to define
the powers, functions and duties of its officers and employees.
THE CITY COUNCIL OF THE CITY OF EAST WENATCHEE DO
RESOLVE AS FOLLOWS:
3. Authorization. The City Council authorizes the Mayor to execute a
grant agreement that conforms to the language set forth in Exhibit
A.
4. Severability. If a court of competent jurisdiction declares any
provision in this resolution to be contrary to law, such declaration
shall not affect the validity of the other provisions of this Resolution.
5. Effective date. This Resolution becomes effective immediately.
Passed by the City Council of East Wenatchee, at a regular
meeting thereof on this 5th day of August, 2025.
The City of East Wenatchee,
Washington
By.
Jerrilea Crawford, Mayor
Attest:
/
•^Anna Laura Lean, City Clerk
Approved as to form only:
/u^
Bob Siderius, City Attorney
Filed with the City Clerk:
Passed by the City Council:
Effective Date:
07-31-2025
08-05-2025
08-05-2025
City of East Wenatchee Resolution 2025-38 with Exhibit A
Retain Resolution until no longer needed for City-business, then transfer to Washington State
Archives (GS50-05A-16 Rev. l)
Page 2 of 2
Jerrilea Crawford
State
Department of Transportation
Local Programs State Funding
Agreement
Work by Public
Agencies
Agency and Address
Agreement Number Project Number
Project Title
Description of Work (See also “Exhibit A”)
Termini Advertisement Date Indirect Cost Rate
Yes No
This AGREEMENT is made and entered into between the STATE OF WASHINGTON, Department of Transportation,
acting by and through the Secretary of Transportation, hereinafter called the “STATE,” and the above named organization,
hereinafter call the “AGENCY.”
WHEREAS, the AGENCY is planning the work shown above, and in connection therewith, the AGENCY has requested
financial assistance for the project or program, and
WHEREAS, the AGENCY has requested funds for the above shown project or program, which has been selected by the
STATE for funding assistance.
NOW THEREFORE, in consideration of the terms, conditions, covenants, and performances contained herein, or attached
and incorporated and made a part hereof, IT IS MUTUALLY AGREE AS FOLLOWS:
Type of Work
PE
or
Planning
a. Agency
Estimate of Funding
(1)
Estimated Total
Funds
(2)
Estimated Agency
Funds
(3)
Estimated
State Funds
b. Other
c. Other
d. State Services
e. Total PE Cost Estimate
RW f. Agency
g. Other
h. Other
i. State Services
j. Total R/W Cost Estimate
CN k. Contract
l. Other
m. Other
n. Other
o. Agency
p. State Services
q. Total CN Cost Estimate
r. Total Project Cost Estimate
DOT Form 140-087LP Revised 12/2024● Previous Versions Obsolete ●Page 1
City of East Wenatchee
271 9th Street NE, East Wenatchee, WA 98802
N Kentucky Ave SRTS
Lane width reduction, curb extensions, ped and bike segment
illumination, ADA curb ramps, bike lanes, sidewalk with buffer, RRFBs
and speed feedback signs
Grant Road to Lacy Place
$ 0.00 $ 0.00 $ 0.00
Consultant $ 250,000.00 $ 150,000.00 $ 100,000.00
Acquisition Cost $ 200,000.00 $ 200,000.00
$ 450,000.00 $ 350,000.00 $ 100,000.00
Consultant
$ 0.00 $ 0.00 $ 0.00
$ 450,000.00 $ 350,000.00 $ 100,000.00
Exhibit A
City of East Wenatchee
Resolution 2025-38
_________________________________________________ _________________________________________________
___________________________________ ________________________________________
I
General
The AGENCY agrees to perform the above described work in accordance
with the Project Application attached hereto as “Exhibit A” and made a
part of this AGREEMENT.
Plans, specifications, and cost estimates shall be prepared by the
AGENCY in accordance with the current State of Washington Standard
Specifications for Road, Bridge, and Municipal Construction and adopted
design standards, unless otherwise noted. The AGENCY will incorporate
the plans and specifications into the AGENCY’s project and thereafter
advertise the resulting project for bid and, assuming bids are received
and a contract is awarded, administer the contract, or if the project is of
a size which the AGENCY is authorized to perform with its own forces
under the laws of the State of Washington, the AGENCY may proceed
with its own forces.
All work performed under this AGREEMENT shall comply with the
applicable provisions of state law.
II
Payment
The STATE, in consideration of the faithful performance of the work to
be performed by the AGENCY, agrees to reimburse the AGENCY for
the percentage of the actual direct and related indirect cost of the work
shown above, up to the “MAXIMUM AMOUNT AUTHORIZED”. The
agency will comply with Governmental Accounting Auditing and Financial
Reporting Standards and applicable state law and local regulations,
policies and procedures. No payment will be made for work done prior to
execution of this AGREEMENT.
Partial payments shall be made by the STATE, upon request of the
AGENCY, to cover costs incurred. These payments are not to be more
frequent than one (1) per month. It is agreed that any such partial
payment will not constitute agreement as to the appropriateness of any
item and that, at the time of the final audit, all required adjustments will
be made and reflected in a final payment. The AGENCY agrees to submit
a final bill to the STATE within forty-five (45) days after the AGENCY has
completed work.
The AGENCY agrees that all costs in excess of the amount authorized
and the AGENCY’s matching funds shall be the responsibility of the
AGENCY.
III
Audit
The AGENCY agrees that an audit may be conducted by the STATE.
During the progress of the work and for a period not less than three (3)
years from the date of final payment to the AGENCY, the records and
accounts pertaining to the work and accounting thereof are to be kept
available for inspection and audit by the STATE and copies of all records,
accounts, documents, or other data pertaining to the project will be
furnished upon request. If any litigation, claim, or audit is commenced,
the records and accounts along with supporting documentation shall
be retained until all litigation, claim, or audit finding has been resolved
even though such litigation, claim, or audit continues past the three-year
retention period.
IV
Legal Relations
No liability shall attach to the AGENCY or the STATE by reason of
entering into this AGREEMENT except as expressly provided herein.
V
Nondiscrimination
The AGENCY agrees to comply with all applicable state and federal
laws, rules, and regulations pertaining to nondiscrimination and agrees
to require the same of all subcontractors providing services or performing
any work using funds provided under this AGREEMENT.
VI
Venue
For the convenience of the parties to this AGREEMENT, it is agreed that
any claims and/or causes of action which the AGENCY has against the
STATE, growing out of this AGREEMENT or the project or program with
which it is concerned, shall be brought only in the Superior Court for
Thurston County.
VII
Termination
The Secretary of the Department of Transportation may terminate this
AGREEMENT if the funding becomes unavailable or if the Secretary
determines that it is in the best interest of the STATE.
VIII
Final Report and Final Inspection
Within ninety (90) days following the completion of the project and
submission of the final billing for the project, a final report and/or final
inspection shall be submitted to the Director, Highways & Local Programs
containing the following information:
Non-Capital Projects
1. A description of the project or program.
2. A summary of actual costs of the project or program.
3. An evaluation of the project or program. This should address
aspects such as transportation and/or other benefits to the
public.
Capital Projects
1. A final inspection is required.
IX
Supplement
This agreement may be modified or supplemented only in writing by
parties.
IN WITNESS WHEREOF, the parties hereto have executed this AGREEMENT on the day and year last written below.
AGENCY
By:
Title:
Agency Date:
S TATE
By:
Director, Local Programs
Date Executed:
DOT Form 140-087LP Revised 12/2024 ● Previous Versions Obsolete ●Page 2
Exhibit A
City of East Wenatchee
Resolution 2025-38
Instructions – Local Programs State Funding Agreement
1. Name and Address – Enter the agency name and billing address of the lead agency that will become a party to
the agreement.
2. Agreement Number – MUST be left blank. This number will be assigned by WSDOT.
3. Project Number – MUST be left blank. This number will be assigned by WSDOT.
4. Description of Work – Enter a concise statement of the major items of work to be performed. If applicable, attach
the signed Project Summary from the project’s selection letter as “Exhibit A”.
5. Project Title – Enter the project’s title.
6. Termini – Enter the begin and end points of the project.
7. Advertisement Date – At construction phase authorization only, enter the proposed construction contract
advertisement date.
8. Indirect Cost Rate
a. Check the Yes box if the agency will be claiming indirect costs on the project. For those projects claiming
indirect costs, supporting documentation that clearly shows the indirect cost rate being utilized by the agency
must be provided with the Local Programs State Funding Agreement. Indirect cost rate approval by your
cognizant agency or through your agency’s self-certification and supporting documentation is required to be
available for review by WSDOT and/or State Auditor.
b. Check the No box if the agency will not be claiming indirect costs on the project.
9. Type of Work and Funding (Round all dollar amounts to the nearest whole dollar)
a. Planning – For projects that only include planning and/or study activities, lines a through d show Planning costs
for the project by type of work (e.g., agency, consultant, state services, etc.).
• Line a – Enter the estimated cost of agency performed work in columns 1 through 3.
• Line b & c – Identify consultant, etc., and enter the estimated amounts in columns 1 through 3.
• Line d – State Services. Every project must have funding for state services. Enter the estimated amounts in
columns 1 through 3.
• Line e – Total of lines a + b + c + d.
b. Preliminary Engineering – For projects authorizing a Preliminary Engineering phase, lines a through d show PE
costs for the project by type of work (e.g., agency, consultant, state services, etc.).
• Line a – Enter the estimated cost of agency performed work in columns 1 through 3.
• Line b & c – Identify consultant, etc., and enter the estimated amounts in columns 1 through 3.
• Line d – State Services. Every project must have funding for state services. Enter the estimated amounts in
columns 1 through 3.
• Line e – Total of lines a + b + c + d.
c. Right of Way – For projects authorizing a Right of Way phase, lines f through i show RW costs for the project by
type of work (e.g., agency, consultant, state services, etc.).
• Line g & h – Identify consultant, etc., and enter the estimated amounts in columns 1 through 3.
• Line i – State Services. Every project must have funding for state services. Enter the estimated amounts in
columns 1 through 3.
• Line j – Total of lines f + g + h + i.
d. Construction – For projects authorizing a Construction phase, lines k through p show CN costs for the project
by type of work (e.g., contract, agency, consultant, state services, etc.).
• Line k – Enter the estimated cost of the CN contract in columns 1 through 3.
• Lines l, m, & n – Identify consultant, utilities, etc., and enter the estimated amounts in columns 1 through 3.
• Line o – Enter the estimated cost of agency performed work in columns 1 through 3.
• Line p – State Services. Every project must have funding for state services. Enter the estimated amounts in
columns 1 through 3.
• Line q – Total of lines k + l + m + n + o + p.
e. Total Project Cost Estimate
• Line r – Total Cost Estimate of the Project. Total of lines e + j + q.
10.Signatures – An authorized official of the local agency signs the agreement and enters their title and date of
signature (include month, day, and year). Note: Do NOT enter a date on the Date Executed line.
DOT Form 140-087LP Revised 12/2024● Previous Versions Obsolete ●Page 3
Exhibit A
City of East Wenatchee
Resolution 2025-38
9.Resolution 2025-38 N Kentucky Ave Grant
Agreement
Final Audit Report 2025-08-11
Created:2025-08-11
By:City Clerk (cityclerk@eastwenatcheewa.gov)
Status:Signed
Transaction ID:CBJCHBCAABAAF7x7aStAIpeV-sWXwc3lQIdq8xNyWQwk
"9.Resolution 2025-38 N Kentucky Ave Grant Agreement" Histor
y
Document created by City Clerk (cityclerk@eastwenatcheewa.gov)
2025-08-11 - 5:09:38 PM GMT
Document emailed to jcrawford@eastwenatcheewa.gov for signature
2025-08-11 - 5:09:51 PM GMT
Email viewed by jcrawford@eastwenatcheewa.gov
2025-08-11 - 5:11:31 PM GMT
Signer jcrawford@eastwenatcheewa.gov entered name at signing as Jerrilea Crawford
2025-08-11 - 5:11:50 PM GMT
Document e-signed by Jerrilea Crawford (jcrawford@eastwenatcheewa.gov)
Signature Date: 2025-08-11 - 5:11:52 PM GMT - Time Source: server
Agreement completed.
2025-08-11 - 5:11:52 PM GMT