Loading...
HomeMy WebLinkAboutResolution 2025-16, SRTS CO 6 7 and 8City of East Wenatchee Resolution 2025-16 with Exhibit A Retain Resolution until no longer needed for City-business, then transfer to Washington State Archives (GS50-05A-16 Rev. 1) Page 1 of 2 City of East Wenatchee, Washington Resolution No. 2025-16 A Resolution of the City of East Wenatchee, Washington authorizing the Mayor to approve Change Orders 6, 7, and 8 between the City of East Wenatchee and Active Construction, Inc for the East Wenatchee Safe Routes to School projects. 1. Alternate format. 1.1. Para leer este documento en otro formato (español, Braille, leer en voz alta, etc.), póngase en contacto con el vendedor de la ciudad al alternateformat@eastwenatcheewa.gov, al (509) 884- 9515 o al 711 (TTY). 1.2. To read this document in an alternate format (Spanish, Braille, read aloud, etc.), please contact the City Clerk at alternateformat@eastwenatcheewa.gov, at (509) 884-9515, or at 711 (TTY). 2. Authority. 2.1. RCW 35A.11.020 and RCW 35A.12.190 authorize the City Council to organize and regulate its internal affairs and to define the powers, functions and duties of its officers and employees. THE CITY COUNCIL OF THE CITY OF EAST WENATCHEE DO RESOLVE AS FOLLOWS: 3. Authorization. The City Council authorizes the Mayor to execute Change Orders that conforms to the language set forth in Exhibit A. 4. Severability. If a court of competent jurisdiction declares any provision in this resolution to be contrary to law, such declaration shall not affect the validity of the other provisions of this Resolution. 5. Effective date. This Resolution becomes effective immediately. City of East Wenatchee Resolution 2025-16 with Exhibit A Retain Resolution until no longer needed for City-business, then transfer to Washington State Archives (GS50-05A-16 Rev. 1) Page 2 of 2 Passed by the City Council of East Wenatchee, at a regular meeting thereof on this 4th day of March, 2025. The City of East Wenatchee, Washington By ________________________ Jerrilea Crawford, Mayor Attest: ___________________________ Anna Laura Leon, City Clerk Approved as to form only: ___________________________ Bob Siderius, City Attorney Filed with the City Clerk: 02-27-2025 Passed by the City Council: 03-04-2025 Effective Date: 03-04-2025 Jerrilea Crawford (Mar 7, 2025 14:41 PST) Jerrilea Crawford 2/14/2025 Exhibit A City of East Wenatchee Resolution 2025-16 Exhibit A City of East Wenatchee Resolution 2025-16 CO-006 Cost Revision Summary EXISTING CONTRACT ITEMS TO BE MODIFIED: Item No.Item Description Spec. Section Bid Quantity Revised Quantity Unit Unit Price Bid Amount Revised Amount Cost Change Notes C7 Roadway Excavation Incl. Haul 2-03 265 277.0 CY 43.50$ 11,527.50$ 12,049.50$ 522.00$ 10" depth excavation across added paving area for extg HMA & base removal. C8 Crushed Surfacing Top Course 4-04 592 603.5 TN 35.00$ 20,720.00$ 21,122.50$ 402.50$ 6" depth under HMA for service replacements & 12" water main stub C9 HMA Cl. 1/2" PG 64-28 5-04 544 556.5 TN 127.00$ 69,088.00$ 70,675.50$ 1,587.50$ 4" depth required for service replacements & 12" water main stub C13 Ductile Iron Water Pipe for Water Main, 6 In. Diam.7-09 113 153.0 LF 115.00$ 12,995.00$ 17,595.00$ 4,600.00$ 6" lateral for hydrants C15 Ductile Iron Water Pipe for Water Main, 12 In. Diam.7-09 1350 1430.0 LF 90.00$ 121,500.00$ 128,700.00$ 7,200.00$ 12" water main stub C31 Adjust Valve Box 7-12 25 26 EA 480.00$ 12,000.00$ 12,480.00$ 480.00$ 1 EA for new GV on 12" water main stub C32 Hydrant Assembly 7-14 4 6 EA 9,370.00$ 37,480.00$ 56,220.00$ 18,740.00$ 2 total added hydrant replacements C34 Service Connection 5/8 x 3/4 In. Diam.7-15 7 11 EA 3,600.00$ 25,200.00$ 39,600.00$ 14,400.00$ 4 total added service replacements C39 Service Line, 1.5 In. Diam 7-15 283 405.5 LF 44.00$ 12,452.00$ 17,842.00$ 5,390.00$ 4 total added service replacements C44 Utility Potholing for New Water Mains 8-26 54 58 EA 640.00$ 34,560.00$ 37,120.00$ 2,560.00$ 1 EA for each hydrant replacement, 2 EA for 12" water main stub TOTAL = 55,882.00$ NEW CONTRACT ITEMS TO BE ADDED: Item No.Item Description Spec. Section Bid Quantity Revised Quantity Unit Unit Price Bid Amount Revised Amount Cost Change Notes C45 (CO-006)Miscellaneous 12" DI Stub Items 1-04 0 1 LS 15,435.95$ -$ 15,435.95$ 15,435.95$ 6 added working days of 2-Way Flagging and TCS. Accounts for TTC effort already required for contract work. TOTAL = 15,435.95$ SUBTOTAL = 71,317.95$ Sales Tax (8.60%) = 6,133.34$ NET TOTAL = 77,451.29$ Item C45 (CO-006) Cost Breakdown: Labor Type Hours Rate Ext. Cost TCS/Flagger 24 62.36$ 1,496.64$ Flagger 48 58.29$ 2,797.92$ Flagger 48 58.29$ 2,797.92$ Foreman 4 96.64$ 386.56$ Operator II 4 95.09$ 380.36$ Operator III 4 90.35$ 361.40$ Operator IV 4 86.32$ 345.28$ Laborer 8 68.85$ 550.80$ Total Cost 9,116.88$ Labor Markup (31%)2,826.23$ Total Labor Cost 11,943.11$ Equip Type Hours Rate Ext. Cost TCS Truck 24 40.63$ 975.12$ Foreman Truck 4 45.69$ 182.76$ Crew Truck 8 41.99$ 335.92$ Loader 4 95.23$ 380.92$ Excavator 8 95.24$ 761.92$ Total Cost 2,636.64$ Equipment Markup (21%)553.69$ Total Equipment Cost 3,190.33$ Material Type Quantity Rate Ext. Cost Miscellaneous 1 250.00$ 250.00$ Total Cost 250.00$ Material Markup (21%)52.50$ Total Material Cost 302.50$ TOTAL MINOR CHANGE COST =15,435.95$ Notes Notes Notes Includes effort for added hydrants (2), stub, and services (4) Includes effort for added hydrants (2), stub, and services (4) Includes effort for added hydrants (2), stub, and services (4) Incidental to existing bid items, so extra compensation only for "miscellaneous 12" DI stub items" Incidental to existing bid items, so extra compensation only for "miscellaneous 12" DI stub items" Incidental to existing bid items, so extra compensation only for "miscellaneous 12" DI stub items" Incidental to existing bid items, so extra compensation only for "miscellaneous 12" DI stub items" Incidental to existing bid items, so extra compensation only for "miscellaneous 12" DI stub items" Incidental to existing bid items, so extra compensation only for "miscellaneous 12" DI stub items" Incidental to existing bid items, so extra compensation only for "miscellaneous 12" DI stub items" Incidental to existing bid items, so extra compensation only for "miscellaneous 12" DI stub items" Incidental to existing bid items, so extra compensation only for "miscellaneous 12" DI stub items" Includes effort for added hydrants (2), stub, and services (4) Miscellaneous parts 4 hrs 8 hrs 4 hrs 8 hrs Calculations 6 days x 4 hrs/day = 24 hrs Incidental to existing bid items, so extra compensation only for "miscellaneous 12" DI stub items" Calculations 6 days x 8 hrs/day = 48 hrs 6 days x 8 hrs/day = 48 hrs 6 days x 4 hrs/day = 24 hrs Calculations 4 hrs 4 hrs 4 hrs 4 hrs 8 hrs Exhibit A City of East Wenatchee Resolution 2025-16 5TH STREET NE N J U N E A V E N U E N J O N A T H O N A V E 5TH STREET NE N K A N S A S A V E N U E N K A N S A S A V E N U E GENERAL SITE PREPARATION & TESC NOTES SITE PREPARATION NOTES LEGEND PLAN DATENO.BY APPR. DESIGNED BY CHECKED BY ENGINEERING MANAGER PROJECT MANAGER PROJECT ENGINEER REVISIONS DRAWN BY DATE FILENAME 19068SPN01.dwg SHT OFKPG PROJECT No. DATE DATE DATE DATE DATE Approved By T Seattle Tacoma Wenatchee 23 S. Wenatchee Avenue, Suite 223 Wenatchee, WA 98801 509.663.2711 KPG.com 15319068A27 SITE PREPARATION AND TESC 5TH STREET NE STA 100+00 TO 108+50 (SCH A & D) 3/2023JLF 3/2023 3/2023 MD MD PLAN EAST WENATCHEE SAFE ROUTES TO SCHOOL KENROY ELEMENTARY (SCH A & D) CONFORMED PLANS JUNE 2023 R EGIST E R E D NO T G N IHSAWFOETATS ER N E P R F O E NNALIO E S IGS 46996 N A N D E Z MIL L E R 10- 1 3 - 2 0 2 3 W W 10/13/23 KRB KRB FLASHING BEACON RELOCATION & TREE REMOVALS (FWD-005) 6 2 10/13/23 KRB KRB HYDRANT REPLACEMENT (FWD-006) (CO-006) 1 2 IRR IRR IRR O/ H P O/ H P O/ H P O/ H P U/G T U/G T U/G T U/G T U/G T U/G T U/G T U/G T U/G T U/G T U/G T U/G T U/G T U/G T U/G T U/G T U/G T U/G T U/G T U/G T U/G T U/G T U/G T U/G T IR R IR R IR R IR R IR R MARCH 2024 S S S S S S S S SS SS SS SS C 6 CONTRACTOR SHALL REMOVE AND DISPOSE OF EWWD FACILITIES PER SP 7-09.3(25). 2 CO-006 CO-006 Exhibit A City of East Wenatchee Resolution 2025-16 5TH STREET NE ST E R L I N G B U S LO O P E X I T EA S T M O N T HI G H A C C E S S 5TH STREET NE EA S T M O N T H I G H BU S L O O P E X I T N I O W A A V E S T E R L I N G B U S L O O P E N T R A N C E SITE PREPARATION NOTES GENERAL SITE PREPARATION & TESC NOTES LEGEND PLAN PLAN DATENO.BY APPR. DESIGNED BY CHECKED BY ENGINEERING MANAGER PROJECT MANAGER PROJECT ENGINEER REVISIONS DRAWN BY DATE FILENAME 19068SPN01.dwg SHT OFKPG PROJECT No. DATE DATE DATE DATE DATE Approved By EAST WENATCHEE SAFE ROUTES TO SCHOOL STERLING INTERMEDIATE (SCH B) Seattle Tacoma Wenatchee 23 S. Wenatchee Avenue, Suite 223 Wenatchee, WA 98801 509.663.2711 KPG.com 15319068A31 SITE PREPARATION AND TESC 5TH STREET NE STA 407+00 TO STA 415+50 (SCH B) 3/2023JLF 3/2023 3/2023 MD MD CONFORMED PLANS JUNE 2023 REGIST E R E D NO T G N IHSAWFOETATS ER N E P R F O E NNALIO E S IGS 46996 N A N D E Z MIL L E R 4-4 - 2 0 2 4 ST O/ H P O/ H P O/ H P U/G FO U/G FO U/G FO U/G FO U/G FO U/G FO U/G FO U/G FO U/G FO U/G FO U/G FO U/G FO U/G FO U/G FO U/G FO U/G FO U/G FO U/G FO U/G FO U/G FO U/G FO U/G FO U/G FO U/G FO U/G FO U/G FO U/G FO S S O/H P O/H P O/H P O/H P O/H P O/H P O/H P O/H P O/H P O/H P O/H P O/H P O/H P O/H P O/H P S T W ( A B A N ) W ( A B A N ) W ( A B A N ) W ( A B A N ) UK W N ( A B A N ) W ( A B A N ) W ( A B A N ) W ( A B A N ) 1 1 6 1 4/4/24 KRB KRB HYDRANT REPLACEMENT (FWD-012) (CO-006) MARCH 2024 C.O.C.O. COMM 6 CONTRACTOR SHALL REMOVE AND DISPOSE OF EWWD FACILITIES PER SP 7-09.3(25). U/ G C O M M U/ G C O M M U/ G C O M M CO-006 CO-006 Exhibit A City of East Wenatchee Resolution 2025-16 5TH STREET NE N J A M E S S T R E E T SITE PREPARATION NOTES GENERAL SITE PREPARATION & TESC NOTES LEGEND PLAN DATENO.BY APPR. DESIGNED BY CHECKED BY ENGINEERING MANAGER PROJECT MANAGER PROJECT ENGINEER REVISIONS DRAWN BY DATE FILENAME 19068SPN01.dwg SHT OFKPG PROJECT No. DATE DATE DATE DATE DATE Approved By EAST WENATCHEE SAFE ROUTES TO SCHOOL STERLING INTERMEDIATE (SCH B) D Seattle Tacoma Wenatchee 23 S. Wenatchee Avenue, Suite 223 Wenatchee, WA 98801 509.663.271 KPG.com 15319068A32 SITE PREPARATION AND TESC 5TH STREET NE STA 415+50 TO STA END (SCH B) 3/2023JLF 3/2023 3/2023 MD MD 5+5023ATC IONS3ATC KRB KRB6 6 REVISED PAVEMENT REMOVAL LIM VIEWPORT ADJUSTED FROM 6 TO (FWD-001) (FWD-001)DCONFORMED PLANS JUNE 2023MARCH 2024 R EGIST E R E D NO T G N IHSAWFOETATS ER N E P R F O E NNALIO E S IGS 66 N A N D E = MIL L E R 6-1 2 - 2 0 2 4 O/ H P O/H P O/H P O/H P O / H P O / H P O / H P O / H P O/H P SSSSSS W (ABAN) W ( A B A N ) MA T C H L I N E S T A 4 2 0 + 2 2 . 0 5 TH I S S H E E T UK W N ( A B A N ) U K W N ( A B A N ) UKWN UKWN 3 4/19/24 KRB KRB WATER MAIN STUB (FWD-013) (CO-006) STA 419+72.10 5.50' RT 4/22/24 KRB KRB ELECTRICAL SERVICE "S3" CONDUIT REVISION (FWD-014)4 3 4IRR IR R S S W W W 420+50 1 MA T C H L I N E S T A 42 0 + 2 2 . 0 5 T H I S S H E E T S 5 5 8/16/24 KRB KRB SCHEDULE C ADDED SERVICES (CO-006) 5 5 5 5 5 CO-006 CO-006 CO-006 CO-006 CO-006 CO-006 Exhibit A City of East Wenatchee Resolution 2025-16 N JAMES STREET 6T H P L A C E N E N JAMES STREET SITE PREPARATION NOTES GENERAL SITE PREPARATION & TESC NOTES LEGEND PLAN PLAN DATENO.BY APPR. DESIGNED BY CHECKED BY ENGINEERING MANAGER PROJECT MANAGER PROJECT ENGINEER REVISIONS DRAWN BY DATE FILENAME 19068SPN01.dwg SHT OFKPG PROJECT No. DATE DATE DATE DATE DATE Approved By EAST WENATCHEE SAFE ROUTES TO SCHOOL STERLING INTERMEDIATE (SCH B) Seattle Tacoma Wenatchee 23 S. Wenatchee Avenue, Suite 223 Wenatchee, WA 98801 509.663.2711 KPG.com 15319068A33 SITE PREPARATION AND TESC JAMES ST STA 501+00 TO STA 509+00 (SCH B) 15319068A33 SITE PREPARATION AND TESC JAMES ST STA 501+00 TO STA 509+00 (SCH B) 3/2023JLF 3/2023 3/2023 MD MD CONFORMED PLANS JUNE 2023 R EGIST E R E D NO T G N IHSAWFOETATS ER N E P R F O E NNALIO E S IGS 46996 N A N D E Z MIL L E R 6-1 2 - 2 0 2 4 W (ABAN)W (ABAN)W (ABAN)W (ABAN)W (ABAN)W (ABAN)W (ABAN)W (ABAN)W (ABAN)W (ABAN) O/ H P O/ H P O/ H P O/ H P O/ H P O/ H P O/ H P O/ H P O/ H P O/ H P U/ G T U/ G T U/ G T U/ G T U/ G T U/ G T W W W W UK W N ( A B A N ) G G G G G G G G G G G MARCH 2024 S S 1 8/16/24 KRB KRB SCHEDULE C ADDED SERVICES (CO-006) 1 1 1 CO-006 CO-006 Exhibit A City of East Wenatchee Resolution 2025-16 5TH ST NE N J A M E S A V E CONSTRUCTION NOTES GENERAL NOTES DESIGNED BY CHECKED BY ENGINEERING MANAGER PROJECT MANAGER PROJECT ENGINEER DRAWN BY DATE FILENAME 19068ARDW01.dwg SHT OFKPG PROJECT No. DATE DATE DATE DATE DATE Approved By EAST WENATCHEE SAFE ROUTES TO SCHOOL STERLING INTERMEDIATE (SCH B) Seattle Tacoma Wenatchee 23 S. Wenatchee Avenue, Suite 223 Wenatchee, WA 98801 509.663.2711 KPG.com 15319068A42 ROADWAY PLANS 5TH STREET NE STA 415+50 TO STA END (SCH B) 3/2023JLF 3/2023 3/2023 MD MD PLAN 'ATENO.B< APPR.REVISIONS (FWD-007)NM11 4/19/24 KRB KRB WATER MAIN STUB (FWD-013)12 4/22/24 KRB KRB ELECTRICAL SERVICE "S3" CONDUIT REVISION (FWD-014)13 14 14 14 R EGIST E R E ' NO T G N IHSAWFOETATS ER N E P R F O E NNALIO E S IGS 466 N A N 'E = MIL L E R 6-1 2 - 2 0 2 4  11 T CONFORMED PLANS JUNE 2023MARCH 2024 420+50 N (FWD-014) N (FWD-014) AND CURB & GUTTER REVISIONS (FWD-016) 14 14 8 (CO-006) S 15 15 8/16/24 KRB KRB SCHEDULE C ADDED SERVICES (CO-006)15 12 CO-006 CO-006 Exhibit A City of East Wenatchee Resolution 2025-16 N JAMES AVE 6T H P L A C E N E N JAMES AVE CONSTRUCTION NOTES GENERAL NOTES PLAN PLAN DESIGNED BY CHECKED BY ENGINEERING MANAGER PROJECT MANAGER PROJECT ENGINEER DRAWN BY DATE FILENAME 19068ARDW01.dwg SHT OFKPG PROJECT No. DATE DATE DATE DATE DATE Approved By EAST WENATCHEE SAFE ROUTES TO SCHOOL STERLING INTERMEDIATE (SCH B) Seattle Tacoma Wenatchee 23 S. Wenatchee Avenue, Suite 223 Wenatchee, WA 98801 509.663.2711 KPG.com 15319068A43 ROADWAY PLANS N JAMES STREET STA 501+00 TO STA 509+50 (SCH B) 3/2023JLF 3/2023 3/2023 MD MD 'ATENO.B< APPR.REVISIONS NM (FWD-007)NM (FWD-007) 11 6 12 R EGIST E R E ' NO T G N IHSAWFOETATS ER N E P R F O E NNALIO E S IGS 466 N A N 'E = MIL L E R 6-1 2 - 2 0 2 4  11 T CONFORMED PLANS JUNE 2023MARCH 2024 AND CURB & GUTTER REVISIONS (FWD-016) G G G G G 33 G G G G G G STA 502+51.30 16.00' LT38 8/16/24 KRB KRB SCHEDULE C ADDED SERVICES (CO-006)13 13 CO-006 Exhibit A City of East Wenatchee Resolution 2025-16 5TH ST NE N J U N E A V E N J O N A T H O N A V E 5TH ST NE N K A N S A S A V E N K A N S A S A V E GENERAL NOTES CONSTRUCTION NOTES PLAN PLAN DATENO.BY APPR. DESIGNED BY CHECKED BY ENGINEERING MANAGER PROJECT MANAGER PROJECT ENGINEER REVISIONS DRAWN BY DATE FILENAME 19068UTIL01.dwg SHT OFKPG PROJECT No. DATE DATE DATE DATE DATE Approved By EAST WENATCHEE SAFE ROUTES TO SCHOOL KENROY ELEMENTARY (SCH A) Seattle Tacoma Wenatchee 23 S. Wenatchee Avenue, Suite 223 Wenatchee, WA 98801 509.663.271 KPG.com AC AC 3/2023 3/2023 JLF 3/2023 UTILITY COORDINATION 5TH AVE NE STA 100+00 TO STA 108+50 (SCH A) 6419068A 153 CONFORMED PLANS JUNE 2023 R EGIST E R E D NO T G N IHSAWFOETATS ER N E P R F O E NNALIO E S IGS 46996 N A N D E Z MIL L E R 10- 1 3 - 2 0 2 3 12 1 10/13/23 KRB KRB HYDRANT REPLACEMENT (FWD-006) (CO-006) 1 ST ST SSSSSSSSSSSSSSSSSSSSSSSSSSSS SS SS SS SS STSTSTSTSTSTST W W W W W W W O/ H P O/ H P O/ H P IRR IRR IRR 14 (2) 14 14 14(2) U/G T U/G T U/G T U/G T U/G T U/G T U/G T U/G T U/G T U/G T U/G T U/G T U/G T U/G T U/G T U/G T U/G T U/G T U/G T U/G T U/G T U/G T U/G T U/G T IR R IR R IR R IR R IR R MARCH 2024 S S S S S S S S 14 14 SS SS SS SS 14 C 11 CO-006 CO-006 Exhibit A City of East Wenatchee Resolution 2025-16 5TH ST NE ST E R L I N G B U S LO O P E X I T EA S T M O N T HI G H A C C E S S 5TH ST NE EA S T M O N T H I G H BU S L O O P E X I T N I O W A A V E ST E R L I N G B U S LO O P E N T R A N C E CONSTRUCTION NOTES GENERAL NOTES PLAN PLAN 3/2023JLF 3/2023 3/2023 AC AC 15319068A68 UTILITY COORDINATION 5TH STREET NE STA 407+00 TO STA 415+50 (SCH B) DATENO.BY APPR. DESIGNED BY CHECKED BY ENGINEERING MANAGER PROJECT MANAGER PROJECT ENGINEER REVISIONS DRAWN BY DATE FILENAME 19068UTIL01.dwg SHT OFKPG PROJECT No. DATE DATE DATE DATE DATE Approved By EAST WENATCHEE SAFE ROUTES TO SCHOOL STERLING INTERMEDIATE (SCH B) Seattle Tacoma Wenatchee 23 S. Wenatchee Avenue, Suite 223 Wenatchee, WA 98801 509.663.2711 KPG.com CONFORMED PLANS JUNE 2023 REGIST E R E D NO T G N IHSAWFOETATS ER N E P R F O E NNALIO E S IGS 46996 N A N D E Z MIL L E R 4-4 - 2 0 2 4 S T S T ST ST ST ST ST ST ST ST U/G FO U/G FO U/G FO U/G FO U/G FO U/G FO U/G FO U/G FO U/G FO U/G FO U/G FO U/G FO U/G FO U/G FO U/G FO U/G FO U/G FO U/G FO U/G FO U/G FO U/G FO ST U/G FO U/G FO U/G FO U/G FO U/G FO U/G FO O/ H P O/ H P O/ H P S S O/H P O/H P O/H P O/H P O/H P O/H P O/H P O/H P W W W W W W W W W W (DCPUD) UK W N ( A B A N ) W ( A B A N ) W ( A B A N ) W ( A B A N ) W ( A B A N ) W ( A B A N ) W ( A B A N ) W ( A B A N ) 1 1 4/4/24 KRB KRB HYDRANT REPLACEMENT (FWD-012) (CO-006) O/H P O/H P O/H P O/H P O/H P O/H P O/H P 14 12 MARCH 2024 W W W W W W W W W 1 13 U/ G C O M M U/ G C O M M U/ G C O M M COMM CO-006 1 CO-006 Exhibit A City of East Wenatchee Resolution 2025-16 5TH ST NE N J A M E S A V E CONSTRUCTION NOTES GENERAL NOTES PLAN 3/2023JLF 3/2023 3/2023 AC AC 15319068A69 UTILITY COORDINATION 5TH ST NE STA 415+50 TO STA 420+50 (SCH B) DATENO.BY APPR. DESIGNED BY CHECKED BY ENGINEERING MANAGER PROJECT MANAGER PROJECT ENGINEER REVISIONS DRAWN BY DATE FILENAME 19068UTIL01.dwg SHT OFKPG PROJECT No. DATE DATE DATE DATE DATE Approved By EAST WENATCHEE SAFE ROUTES TO SCHOOL STERLING INTERMEDIATE (SCH B) Seattle Tacoma Wenatchee 23 S. Wenatchee Avenue, Suite 223 Wenatchee, WA 98801 509.663.2711 KPG.com CONFORMED PLANS JUNE 2023 R EGIST E R E D NO T G N IHSAWFOETATS ER N E P R F O E NNALIO E S IGS 46996 N A N D E Z MIL L E R 6-1 2 - 2 0 2 4 W (ABAN) W ( A B A N ) UK W N ( A B A N ) UK W N ( A B A N ) UKWN UKWN O/ H P O/ H P IRR IRR IRR IRR IRR IRRU/G T U/G T U/G T U/G T U/G T SSSSSS O/H P O/H P O/H P O/H P O/H P O/H P O/H P O/H PO/H P O/H P O/H P O/H P O/H P O/H P O/H P O/H P (4) W W W W W W W APPROX. STA. 418+87.1, 9.0' R, CONNECTION TO EXISTING(1) - 12" GATE VALVE (RJxRJ)(1) - 12" FOSTER ADAPTER APPROX 80 LF of 12" RJ DI PIPE 6/12/24 KRB KRB WATER MAIN STUB (FWD-013) (CO-006)1 MARCH 2024 W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W IRR IR R SS LOCATE DOUGLAS COUNTY SEWER MAIN.6 1 6 1 W W W APPROX 15 LF of 3/4" POLY PIPE APPROX. STA. 419+65.1, 23.8' R, WATER METER CHAMBER TOP APPROX. STA. 419+67.1, 9.0' R, (1) - 12" DI RJ CAP w/ 3" PORT (1) - PRECAST CONC THRUST BLOCK(1) - 12"x3/4" SADDLE TAP (NO CORP)(1) - MISC. FITTINGS, AS REQ'D CONTACT EWWD TO DEPRESSURIZE EXISTING MAIN. REMOVE EXISTING PLUG AND THRUST BLOCK FROM 12"x12" DI TEE FOR CONNECTION.EXISTING WATER MAIN TO BE OUT OF SERVICENO LONGER THAN ONE 8-HOUR WORKING DAY. INSTALL (2) 12" RJ 45-DEGREE VERTICALBENDS NEEDED TO RUN NEW 12" DI WATER MAIN UNDER EXISTING 8" DI WATER MAIN. 1 APPROX. STA. 419+22.9, 41.2' R,(1) - 5/8" x 3/4" WATER SERVICE W/ 1-1/2" SERVICE LINE REMOVE EXISTING WATER SERVICE PER EWWD STANDARD DETAIL W-15 APPROX. STA. 417+28.0, 28.8' R,(1) - 5/8" x 3/4" WATER SERVICE W/ 1-1/2" SERVICE LINE REMOVE EXISTING WATERSERVICE PER EWWDSTANDARD DETAIL W-15 REMOVE EXISTING WATER SERVICE PER EWWDSTANDARD DETAIL W-15 APPROX. STA. 416+42.0, 28.0' R,(1) - 5/8" x 3/4" WATER SERVICE W/ 1-1/2" SERVICE LINE OVER 2 8/16/24 KRB KRB SCHEDULE C ADDED SERVICES (CO-006) S 2 2CO-006 CO-006 CO-006 CO-006 Exhibit A City of East Wenatchee Resolution 2025-16 N JAMES AVE 6T H P L A C E N E N JAMES AVE CONSTRUCTION NOTES GENERAL NOTES PLAN PLAN 3/2023JLF 3/2023 3/2023 AC AC 15319068A70 UTILITY COORDINATION JAMES AVE STA 501+00 TO STA 509+00 (SCH B) DATENO.BY APPR. DESIGNED BY CHECKED BY ENGINEERING MANAGER PROJECT MANAGER PROJECT ENGINEER REVISIONS DRAWN BY DATE FILENAME 19068UTIL01.dwg SHT OFKPG PROJECT No. DATE DATE DATE DATE DATE Approved By EAST WENATCHEE SAFE ROUTES TO SCHOOL STERLING INTERMEDIATE (SCH B) Seattle Tacoma Wenatchee 23 S. Wenatchee Avenue, Suite 223 Wenatchee, WA 98801 509.663.271 KPG.com CONFORMED PLANS JUNE 2023 R EGIST E R E D NO T G N IHSAWFOETATS ER N E P R F O E NNALIO E S IGS 46996 N A N D E Z MIL L E R 6-1 2 - 2 0 2 4 W (ABAN)W (ABAN)W (ABAN)W (ABAN)W (ABAN)W (ABAN)W (ABAN)W (ABAN)W (ABAN)W (ABAN) 1 O/ H P O/ H P O/ H P O/ H P O/ H P O/ H P O/ H P O/ H P O/ H P U/ G T U/ G T U/ G T U/ G T U/ G T U/ G T W W W W UK W N ( A B A N ) G G G G G G G G G G G MARCH 2024 3 REMOVE EXISTING WATERSERVICE PER EWWDSTANDARD DETAIL W-15 APPROX. STA. 501+92.5, 22.0' R,(1) - 5/8" x 3/4" WATER SERVICE W/ 1-1/2" SERVICE LINE S S 1 8/16/24 KRB KRB SCHEDULE C ADDED SERVICES (CO-006) 1 CO-006 Exhibit A City of East Wenatchee Resolution 2025-16 2/14/2025 Exhibit A City of East Wenatchee Resolution 2025-16 Exhibit A City of East Wenatchee Resolution 2025-16 CO-007 Cost Revision Summary EXISTING CONTRACT ITEMS TO BE MODIFIED: Item No.Item Description Spec. Section Current Quantity Revised Quantity Unit Unit Price Current Amount Revised Amount Cost Change Notes C7 Roadway Excavation Incl. Haul 2-03 277.0 345.0 CY 43.50$ 12,049.50$ 15,007.50$ 2,958.00$ 10"-depth excavation across added paving area for extg HMA & base removal. C8 Crushed Surfacing Top Course 4-04 603.5 674.5 TN 35.00$ 21,122.50$ 23,607.50$ 2,485.00$ 6" depth under HMA. C9 HMA Cl. 1/2" PG 64-28 5-04 556.5 609.5 TN 127.00$ 70,675.50$ 77,406.50$ 6,731.00$ 4" depth over 2,070 SF. C31 Adjust Valve Box 7-12 26 31 EA 480.00$ 12,480.00$ 14,880.00$ 2,400.00$ 4 EA at extg cross plus 1 EA at extg auxiliary GV for hydrant lateral. C44 Utility Potholing for New Water Mains 8-26 58 59 EA 640.00$ 37,120.00$ 37,760.00$ 640.00$ 1 EA for checking subgrade soil conditions. TOTAL = 15,214.00$ NEW CONTRACT ITEMS TO BE ADDED: Item No.Item Description Spec. Section Bid Quantity Revised Quantity Unit Unit Price Bid Amount Revised Amount Cost Change Notes C46 (CO-007)5th & Kentucky Added Paving - Traffic Control 1-04 0 1 LS 3,490.35$ -$ 3,490.35$ 3,490.35$ 2 added working days of 2-Way Flagging and TCS. Accounts for TTC effort already required for contract work. C47 (CO-007) 5th & Kentucky Added Paving - Miscellaneous Items 1-04 0 1 LS 2,003.50$ -$ 2,003.50$ 2,003.50$ Adjust Manhole: 2 EA @ $695.00 Replace Monument and Monument Case and Cover: 1 EA @ $595.00 Paint Line: 74 LF @ $0.25 TOTAL = 5,493.85$ SUBTOTAL = 20,707.85$ Sales Tax (8.60%) = 1,780.87$ NET TOTAL = 22,488.72$ Item C46 (CO-007) Cost Breakdown: Labor Type Hours Rate Ext. Cost TCS/Flagger 8 62.36$ 498.88$ Flagger 16 58.29$ 932.64$ Flagger 16 58.29$ 932.64$ Total Cost 2,364.16$ Labor Markup (31%)732.89$ Total Labor Cost 3,097.05$ Equip Type Hours Rate Ext. Cost TCS Truck 8 40.63$ 325.04$ Total Cost 325.04$ Equipment Markup (21%)68.26$ Total Equipment Cost 393.30$ TOTAL MINOR CHANGE (TTC) COST =3,490.35$ 2 days x 4 hrs/day = 8 hrs Calculations 2 days x 8 hrs/day = 16 hrs 2 days x 8 hrs/day = 16 hrs 2 days x 4 hrs/day = 8 hrs Calculations Half of intersection per plan and incidental to LS item A7, so extra compensation only for added paving area efforts Notes Half of intersection per plan and incidental to LS item A7, so extra compensation only for added paving area efforts Half of intersection per plan and incidental to LS item A7, so extra compensation only for added paving area efforts Half of intersection per plan and incidental to LS item A7, so extra compensation only for added paving area efforts Notes Exhibit A City of East Wenatchee Resolution 2025-16 5TH STREET NE N K E L L E R A V E KE N T T E R R A C E 5TH STREET NE N K E N T U C K Y A V E FU L L E R S T R E E T SITE PREPARATION NOTES GENERAL SITE PREPARATION & TESC NOTES LEGEND PLAN PLAN DATENO.BY APPR. DESIGNED BY CHECKED BY ENGINEERING MANAGER PROJECT MANAGER PROJECT ENGINEER REVISIONS DRAWN BY DATE FILENAME 19068SPN01.dwg SHT OFKPG PROJECT No. DATE DATE DATE DATE DATE Approved By CONFORMED PLANS Seattle Tacoma Wenatchee 23 S. Wenatchee Avenue, Suite 223 Wenatchee, WA 98801 509.663.2711 KPG.com 15319068A28 SITE PREPARATION AND TESC 5TH STREET NE STA 108+50 TO STA 115+00 (SCH A) 3/2023JLF 3/2023 3/2023 MD MD EAST WENATCHEE SAFE ROUTES TO SCHOOL KENROY ELEMENTARY (SCH A) CKY6/14/23 ATC KRB REVISED PAVEMENT REMOVAL LIM(FWD-001) R EGIST E R E D NO T G N IHSAWFOETATS ER N E P R F O E NNALIO E S IGS 66 N A N D E = MIL L E R 7-1 - 2 0 2 4 U/ G T U/ G T U/ G T S S SSSSSSSSSS S S ST ST 14 IR R IR R IR R IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IR R IR R IR R IR R IR R IR R MARCH 2024 UK W N ( A B A N ) IRR 46.94' 11 POTHOLE SUBGRADE SOILS OVER EXISTING WATER MAIN TO DETERMINE SATURATION LEVEL AND CONDITION. STA 114+42.00 25.13' RT STA 114+36.50 64.00' RT STA 114+23.90 55.50' RT 3 2 8/16/24 KRB KRB 5TH & KENTUCKY PAVING LIMIT REVISIONS (CO-007) 2 2STA 114+42.17 18.00' LT CO-007 CO-007 Exhibit A City of East Wenatchee Resolution 2025-16 5TH ST NE N K E N T U C K Y A V E FU L L E R S T KE N T T E R R A C E CONSTRUCTION NOTES GENERAL NOTES KENROY 5TH ST NE STA 112+00 TO STA 115+00 PLAN DATENO.BY APPR. DESIGNED BY CHECKED BY ENGINEERING MANAGER PROJECT MANAGER PROJECT ENGINEER REVISIONS DRAWN BY DATE FILENAME 19068ARDPRO01.dwg SHT OFKPG PROJECT No. DATE DATE DATE DATE DATE Approved By EAST WENATCHEE SAFE ROUTES TO SCHOOL KENROY ELEMENTARY (SCH A) Seattle Tacoma Wenatchee 23 S. Wenatchee Avenue, Suite 223 Wenatchee, WA 98801 509.663.2711 KPG.com 15319068A38 ROADWAY PLAN AND PROFILE 5TH STREET NE STA 112+00 TO STA 115+00 (SCH A) 3/2023JLF 3/2023 3/2023 MD MD EAST WENATCHEE SAFE ROUTES TO SCHOOL KENROY ELEMENTARY (SCH A) 08/2023 MD NM BUS STOPS MOVED 06/2024 AC KB MOVE STOP SIGN AND REVISE SIDEWALK (RFI 047) T 3 11 T 3 11 CONFORMED PLANS JUNE 2023MARCH 2024 -7 6 R EGIST E R E D NO T G N IHSAWFOETATS ER N E P R F O E NNALIO E S IGS  N A N D E Z MIL L E R 7-1 - 2 0 2 4 MARCH 2024 8 8/16/24 KRB KRB 5TH & KENTUCKY PAVING LIMIT REVISIONS (CO-007) IRR 8 PV I S T A = 1 1 4 + 4 2 . 1 3 EL = 1 0 2 8 . 5 7 2.73% 8 8 34 CO-007 CO-007 CO-007 Exhibit A City of East Wenatchee Resolution 2025-16 5TH ST NE N K E L L E R A V E KE N T T E R R A C E 5TH ST NE N K E N T U C K Y AV E FU L L E R S T CONSTRUCTION NOTES GENERAL NOTES PLAN PLAN DATENO.BY APPR. DESIGNED BY CHECKED BY ENGINEERING MANAGER PROJECT MANAGER PROJECT ENGINEER REVISIONS DRAWN BY DATE FILENAME 19068UTIL01.dwg SHT OFKPG PROJECT No. DATE DATE DATE DATE DATE Approved By EAST WENATCHEE SAFE ROUTES TO SCHOOL KENROY ELEMENTARY (SCH A) Seattle Tacoma Wenatchee 23 S. Wenatchee Avenue, Suite 223 Wenatchee, WA 98801 509.663.2711 KPG.com 3/2023JLF 3/2023 3/2023 AC AC 15319068A65 UTILITY COORDINATION 5TH AVE NE STA 108+50 TO STA 115+00 (SCH A) CONFORMED PLANS JUNE 2023 R EGIST E R E D NO T G N IHSAWFOETATS ER N E P R F O E NNALIO E S IGS 46996 N A N D E Z MIL L E R 7-1 - 2 0 2 4 U/G T U/G T U/G T U/G T U/ G T ST ST ST STSTSTSTST STSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTST U/ G T U/ G T U/ G T IR R IR R IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IR R IR R IR R IR R IR R IR R MARCH 2024 UK W N ( A B A N ) 13 IRR 13 14 1 8/16/24 KRB KRB 5TH & KENTUCKY PAVING LIMIT REVISIONS (CO-007) 1 1 14 (4) S CO-007 CO-007 Exhibit A City of East Wenatchee Resolution 2025-16 5TH ST NE N K E L L E R AV E KE N T T E R R A C E 5TH ST NE FU L L E R S T N K E N T U C K Y AV E CHANNELIZATION NOTES GENERAL NOTES SIGN SCHEDULE SIGN SCHEDULE MAILBOX SCHEDULE PLAN PLAN DATENO.BY APPR. DESIGNED BY CHECKED BY ENGINEERING MANAGER PROJECT MANAGER PROJECT ENGINEER REVISIONS DRAWN BY DATE FILENAME 19068CHAN01.dwg SHT OFKPG PROJECT No. DATE DATE DATE DATE DATE Approved By EAST WENATCHEE SAFE ROUTES TO SCHOOL KENROY ELEMENTARY (SCH A) Seattle Tacoma Wenatchee 23 S. Wenatchee Avenue, Suite 223 Wenatchee, WA 98801 509.663.2711 KPG.com 15319068A96 CHANNELIZATION PLAN 5TH STREET NE STA 108+50 TO 115+00 (SCH A) 3/2023JLF 3/2023 3/2023 AC AC 08/2023 MD NM BUS STOP MOVED 06/2024 AC KB MOVE STOP SIGN AND REVISE SIDEWALK (RFI 047) NEW SIGN(BY OTHERS) T 3 11 T 3 11 CONFORMED PLANS JUNE 2023MARCH 2024 -7 6 R EGIST E R E D NO T G N IHSAWFOETATS ER N E P R F O E NNALIO E S IGS  N A N D E Z MIL L E R 7-1 - 2 0 2 4 10 MARCH 2024 8 8/16/24 KRB KRB 5TH & KENTUCKY PAVING LIMIT REVISIONS (CO-007) 114+11.20 55.52'114+23.00 55.46'MATCH TO EXISTING 8 8 114+23.45 STA 114+34.65 63.95' RT 9 CO-007 CO-007 Exhibit A City of East Wenatchee Resolution 2025-16 2/21/2025 Exhibit A City of East Wenatchee Resolution 2025-16 Exhibit A City of East Wenatchee Resolution 2025-16 CO-008 Cost Revision Summary EXISTING CONTRACT ITEMS TO BE MODIFIED: Item No.Item Description Spec. Section Current Quantity Revised Quantity Unit Unit Price Current Amount Revised Amount Cost Change B12 Roadway Excavation Incl. Haul 2-03 1130 1135.7 CY 46.50$ 52,545.00$ 52,810.05$ 265.05$ B15 Crushed Surfacing Top Course 4-04 1957.0 1956.5 TN 35.00$ 68,495.00$ 68,477.50$ (17.50)$ B34 Topsoil Type A 8-02 40 40.7 CY 80.00$ 3,200.00$ 3,256.00$ 56.00$ B35 Seeded Lawn Installation 8-02 405 417.3 SY 5.00$ 2,025.00$ 2,086.50$ 61.50$ B45 Cement Concrete Driveway 8-06 101 146.0 SY 184.00$ 18,584.00$ 26,864.00$ 8,280.00$ B75 (CO-003) HMA Cl. 3/8" PG 64-28 5-04 22.0 14.8 TN 130.50$ 2,871.00$ 1,931.40$ (939.60)$ TOTAL =7,705.45$ NEW CONTRACT ITEMS TO BE ADDED: No new items. NET TOTAL =7,705.45$ Exhibit A City of East Wenatchee Resolution 2025-16 1 Kyle Burtis From:Wes Wagner <wesw@activeconstruction.com> Sent:Tuesday, December 17, 2024 3:43 PM To:Kyle Burtis Subject:FW: EW-SRTS: DBE Acknowledgement Needed for Driveway D19 Attachments:FWD-021.pdf Kyle, I sent the below email to Gilbert and they never responded. Thanks, 2 O: 253 230-4630 | F: 253 248-1093 “GET ACTIVE” P.O. Box 430, Puyallup, WA 98371 | www.activeconstruction.com | wesw@activeconstruction.com ACI is an Equal Opportunity Employer | FOLLOW US: ________________________________________ IMPORTANT/CONFIDENTIAL: This e-mail message (and any attachments accompanying it) may contain confidential information. The information is intended only for the use of the intended recipient(s). Delivery of this message to anyone other than the intended recipient(s) is not intended to waive any privilege or otherwise detract from the confidentiality of the message. If you are not the intended recipient, or if this message has been addressed to you in error, do not read, disclose, reproduce, distribute, disseminate or otherwise use this transmission, rather, please promptly notify the sender by reply e-mail, and then destroy all copies of the message and its attachments, if any. From: Kyle Burtis <kyle.burtis@psomas.com> Sent: Tuesday, November 19, 2024 4:51 PM To: Wes Wagner <wesw@activeconstruction.com> Cc: Eugene Carollo <eugenec@activeconstruction.com>; Naomi Tiffany <naomil@activeconstruction.com>; Jennifer Smiley <Jennifer.Smiley@psomas.com>; Anne Carr <anne.carr@psomas.com>; Garren Melton <GMelton@eastwenatcheewa.gov> Subject: RE: EW-SRTS: DBE Acknowledgement Needed for Driveway D19 Wes, Can you please reach out to Gilbert Patterson to obtain email confirmation noted below? This is critical to complete the change order per WSDOT’s direction. Thank you. Kyle Burtis, PE Senior Project Engineer D: 509-662-4068 C: 307-752-4162 From: Kyle Burtis Sent: Tuesday, October 29, 2024 6:38 PM To: Wes Wagner <wesw@activeconstruction.com> Cc: Eugene Carollo <eugenec@activeconstruction.com>; Naomi Lawrence <naomil@activeconstruction.com>; Jennifer Smiley <Jennifer.Smiley@psomas.com>; Anne Carr <anne.carr@psomas.com> Subject: EW-SRTS: DBE Acknowledgement Needed for Driveway D19 Wes, Similar to CO-002, can you please reach out to Gilbert Patterson to gain email confirmation of their willingness to complete the work required by FWD-021 (attached). That’s the one where we switched Driveway D19 from 4” HMA to 6” Cement Concrete. Their portion of the work is specific to sheets 42, 92, and 94. Exhibit A City of East Wenatchee Resolution 2025-16 3 A change order is required to document this work since it increases the work of the contract DBE. Therefore, this work will be captured on CO-008. The work is already complete and was actually paid for in PE #12, we just need to execute the CO now to document the quantity overrun. Thank you. Kyle Burtis, PE Senior Project Engineer D: 509-662-4068 C: 307-752-4162 5TH STREET NE N J A M E S S T R E E T SITE PREPARATION NOTES GENERAL SITE PREPARATION & TESC NOTES LEGEND PLAN DATENO.BY APPR. DESIGNED BY CHECKED BY ENGINEERING MANAGER PROJECT MANAGER PROJECT ENGINEER REVISIONS DRAWN BY DATE FILENAME 19068SPN01.dwg SHT OFKPG PROJECT No. DATE DATE DATE DATE DATE Approved By EAST WENATCHEE SAFE ROUTES TO SCHOOL STERLING INTERMEDIATE (SCH B) D Seattle Tacoma Wenatchee 23 S. Wenatchee Avenue, Suite 223 Wenatchee, WA 98801 509.663.271 KPG.com 15319068A32 SITE PREPARATION AND TESC 5TH STREET NE STA 415+50 TO STA END (SCH B) 3/2023JLF 3/2023 3/2023 MD MD 5+5023ATC IONS3ATC KRB KRB6 6 REVISED PAVEMENT REMOVAL LIM VIEWPORT ADJUSTED FROM 6 TO (FWD-001) (FWD-001)DCONFORMED PLANS JUNE 2023MARCH 2024 R EGIST E R E D NO T G N IHSAWFOETATS ER N E P R F O E NNALIO E S IGS 66 N A N D E = MIL L E R 8-2 1 - 2 0 2 4 O/ H P O/H P O/H P O/H P O / H P O / H P O / H P O / H P O/H P SSSSSS W (ABAN) W ( A B A N ) 420+50 1 MA T C H L I N E S T A 4 2 0 + 2 2 . 0 5 TH I S S H E E T MA T C H L I N E S T A 42 0 + 2 2 . 0 5 T H I S S H E E T UK W N ( A B A N ) U K W N ( A B A N ) UKWN UKWN 3 4/19/24 KRB KRB WATER MAIN STUB (FWD-013) STA 419+72.10 5.50' RT 4/22/24 KRB KRB ELECTRICAL SERVICE "S3" CONDUIT REVISION (FWD-014)4 IRR IR R S S W W W S 5 8/15/24 KRB KRB DRIVEWAY D18 & D19 REVISIONS (CO-008) 5 5 5 CO-008 CO-008 CO-008 Exhibit A City of East Wenatchee Resolution 2025-16 5TH ST NE N J A M E S A V E CONSTRUCTION NOTES GENERAL NOTES DESIGNED BY CHECKED BY ENGINEERING MANAGER PROJECT MANAGER PROJECT ENGINEER DRAWN BY DATE FILENAME 19068ARDW01.dwg SHT OFKPG PROJECT No. DATE DATE DATE DATE DATE Approved By EAST WENATCHEE SAFE ROUTES TO SCHOOL STERLING INTERMEDIATE (SCH B) Seattle Tacoma Wenatchee 23 S. Wenatchee Avenue, Suite 223 Wenatchee, WA 98801 509.663.2711 KPG.com 15319068A42 ROADWAY PLANS 5TH STREET NE STA 415+50 TO STA END (SCH B) 3/2023JLF 3/2023 3/2023 MD MD PLAN 'ATENO.B< APPR.REVISIONS (FWD-007)NM11 4/19/24 KRB KRB WATER MAIN STUB (FWD-013)12 4/22/24 KRB KRB ELECTRICAL SERVICE "S3" CONDUIT REVISION (FWD-014)13 14 14 14 R EGIST E R E ' NO T G N IHSAWFOETATS ER N E P R F O E NNALIO E S IGS 466 N A N 'E = MIL L E R 8-2 1 - 2 0 2 4  11 T CONFORMED PLANS JUNE 2023MARCH 2024 420+50 N (FWD-014) N (FWD-014) AND CURB & GUTTER REVISIONS (FWD-016) 14 14 8 S 8/15/24 KRB KRB DRIVEWAY D18 & D19 REVISIONS (CO-008)15 15 CO-008 Exhibit A City of East Wenatchee Resolution 2025-16 CONSTRUCTION NOTES GENERAL NOTES D17 5TH ST NE D18 5TH ST NE D19 5TH ST NE DRIVEWAY PLAN LEGEND DRIVEWAY PROFILE LEGEND DRIVEWAY D17 DATENO.BY APPR. DESIGNED BY CHECKED BY ENGINEERING MANAGER PROJECT MANAGER PROJECT ENGINEER REVISIONS DRAWN BY DATE FILENAME 19068DRVW01.dwg SHT OFKPG PROJECT No. DATE DATE DATE DATE DATE Approved By EAST WENATCHEE SAFE ROUTES TO SCHOOL STERLING INTERMEDIATE (SCH B) Seattle Tacoma Wenatchee 23 S. Wenatchee Avenue, Suite 223 Wenatchee, WA 98801 509.663.2711 KPG.com 15319068A DRIVEWAY PLAN AND PROFILES 5TH STREET NE (SCH. B) DRIVEWAYS 17, 18, AND 19 (SCH B) 3/2023JLF 3/2023 3/2023 MD MD PLAN DRIVEWAY D17 PROFILE PLAN DRIVEWAY D18 PLAN DRIVEWAY D19 PROFILE PROFILE 92 DRIVEWAY D18 DRIVEWAY D19DRIVEWAY D19 (FWD-007)NM11 R EGIST E R E D NO T G N IHSAWFOETATS ER N E P R F O E NNALIO E S IGS 99 N A N D E = MIL L E R 8-2 1 - 2 0 2 4 CONFORMED PLANS MARCH 2024 17.0' 6. 0 0 f t 0.50% PV I S T A = 0 + 4 4 . 5 5 EL = M A T C H E X T G -10.22% LOW POINT: SLOPE TO DRAIN 20.0' 8/15/24 KRB KRB DRIVEWAY D18 & D19 REVISIONS (CO-008)12 12 12 CO-008 CO-008 Exhibit A City of East Wenatchee Resolution 2025-16 DRIVEWAY SCHEDULE CEMENT CONC DRIVEWAY SECTION HMA DRIVEWAY SECTION ISOMETRIC VIEW SECTION B-B ISOMETRIC VIEW SECTION B-B CEMENT CONC. DRIVEWY ENTRANCE TYPE 3 MODIFIED (DEPRESSED) CEMENT CONC. DRIVEWAY ENTRANCE TYPE 1 MODIFIED (DEPRESSED) NOTES DATENO.BY APPR. DESIGNED BY CHECKED BY ENGINEERING MANAGER PROJECT MANAGER PROJECT ENGINEER REVISIONS DRAWN BY DATE FILENAME 19068DRVWDET01.dwg SHT OFKPG PROJECT No. DATE DATE DATE DATE DATE Approved By EAST WENATCHEE SAFE ROUTES TO SCHOOL KENROY ELEMENTARY (SCH A) T Seattle Tacoma Wenatchee 23 S. Wenatchee Avenue, Suite 223 Wenatchee, WA 98801 509.663.2711 KPG.com MD MD 3/2023 3/2023 JLF 3/2023 DRIVEWAY SCHEDULE AND DETAILS 9419068A 153 CONFORMED PLANS JUNE 2023 R EGIST E R E D N O T G N IHSAWFOETATS ER N E P R F O E NNALIO E S IGS 46996 N A N D E Z MIL L E R 8-2 1 - 2 0 2 4 3A 30 3 0 1 10/12/23 KRB KRB ADD DRIVEWAY D3A (FWD-003) 3/8"64-28 HMA5.5 MARCH 2024 30 22 26 3 2 8/14/24 KRB KRB DRIVEWAY D3 REVISIONS (FWD-020) 3 8/15/24 KRB KRB DRIVEWAY D18 & D19 REVISIONS (CO-008) CO-008 Exhibit A City of East Wenatchee Resolution 2025-16 5TH ST NE N J A M E S A V E CONSTRUCTION NOTES PLAN 15319068A125 LANDSCAPE AND RESTORATION PLAN 5TH STREET NE STA 415+50 TO STA 420+00 (SCH B) 3/2023JLF 3/2023 3/2023 EG EG DATENO.BY APPR. DESIGNED BY CHECKED BY ENGINEERING MANAGER PROJECT MANAGER PROJECT ENGINEER REVISIONS DRAWN BY DATE FILENAME 19068LSCP-RES01.dwg SHT OFKPG PROJECT No. DATE DATE DATE DATE DATE Approved By EAST WENATCHEE SAFE ROUTES TO SCHOOL STERLING INTERMEDIATE (SCH B) T 0 3 -1 5-2023 Seattle Tacoma Wenatchee 23 S. Wenatchee Avenue, Suite 223 Wenatchee, WA 98801 509.663.2711 KPG.com E L I Z A B E T H GIBS O N N O . 538 EXP. 0 8 /1 6 /2 0 23 ST A T E O F W A SHI N G T O N L A N D S CAP E A R C H I T E CT SEE SHEET 127 FOR PLANT SCHEDULE, DETAILS AND GENERAL NOTES LEGEND CONFORMED PLANS JUNE 2023 128 W W W W W W W 4/22/24 KRB KRB ELECTRICAL SERVICE "S3" CONDUIT REVISION (FWD-014)1 MARCH 2024 W W W 2 8/15/24 KRB KRB DRIVEWAY D18 & D19 REVISIONS (CO-008) 2 2 CO-008 CO-008 Exhibit A City of East Wenatchee Resolution 2025-16 Resolution 2025-16, SRTS CO 6 7 and 8- compressed Final Audit Report 2025-03-07 Created:2025-03-07 By:City Clerk (cityclerk@eastwenatcheewa.gov) Status:Signed Transaction ID:CBJCHBCAABAA5SDYtVlw54fB6tj76CmOk8NPIKEycKtv "Resolution 2025-16, SRTS CO 6 7 and 8-compressed" History Document created by City Clerk (cityclerk@eastwenatcheewa.gov) 2025-03-07 - 0:39:11 AM GMT Document emailed to jcrawford@eastwenatcheewa.gov for signature 2025-03-07 - 0:40:52 AM GMT Email viewed by jcrawford@eastwenatcheewa.gov 2025-03-07 - 10:41:22 PM GMT Signer jcrawford@eastwenatcheewa.gov entered name at signing as Jerrilea Crawford 2025-03-07 - 10:41:50 PM GMT Document e-signed by Jerrilea Crawford (jcrawford@eastwenatcheewa.gov) Signature Date: 2025-03-07 - 10:41:52 PM GMT - Time Source: server Agreement completed. 2025-03-07 - 10:41:52 PM GMT