HomeMy WebLinkAboutResolution 2025-16, SRTS CO 6 7 and 8City of East Wenatchee Resolution 2025-16 with Exhibit A
Retain Resolution until no longer needed for City-business, then transfer to Washington State
Archives (GS50-05A-16 Rev. 1)
Page 1 of 2
City of East Wenatchee, Washington
Resolution No. 2025-16
A Resolution of the City of East Wenatchee, Washington authorizing
the Mayor to approve Change Orders 6, 7, and 8 between the City of
East Wenatchee and Active Construction, Inc for the East Wenatchee
Safe Routes to School projects.
1. Alternate format.
1.1. Para leer este documento en otro formato (español, Braille,
leer en voz alta, etc.), póngase en contacto con el vendedor de la
ciudad al alternateformat@eastwenatcheewa.gov, al (509) 884-
9515 o al 711 (TTY).
1.2. To read this document in an alternate format (Spanish,
Braille, read aloud, etc.), please contact the City Clerk at
alternateformat@eastwenatcheewa.gov, at (509) 884-9515, or at
711 (TTY).
2. Authority.
2.1. RCW 35A.11.020 and RCW 35A.12.190 authorize the City
Council to organize and regulate its internal affairs and to define
the powers, functions and duties of its officers and employees.
THE CITY COUNCIL OF THE CITY OF EAST WENATCHEE DO
RESOLVE AS FOLLOWS:
3. Authorization. The City Council authorizes the Mayor to execute
Change Orders that conforms to the language set forth in Exhibit A.
4. Severability. If a court of competent jurisdiction declares any
provision in this resolution to be contrary to law, such declaration
shall not affect the validity of the other provisions of this Resolution.
5. Effective date. This Resolution becomes effective immediately.
City of East Wenatchee Resolution 2025-16 with Exhibit A
Retain Resolution until no longer needed for City-business, then transfer to Washington State
Archives (GS50-05A-16 Rev. 1)
Page 2 of 2
Passed by the City Council of East Wenatchee, at a regular
meeting thereof on this 4th day of March, 2025.
The City of East Wenatchee,
Washington
By ________________________
Jerrilea Crawford, Mayor
Attest:
___________________________ Anna Laura Leon, City Clerk
Approved as to form only:
___________________________ Bob Siderius, City Attorney
Filed with the City Clerk: 02-27-2025
Passed by the City Council: 03-04-2025
Effective Date: 03-04-2025
Jerrilea Crawford (Mar 7, 2025 14:41 PST)
Jerrilea Crawford
2/14/2025
Exhibit A
City of East Wenatchee
Resolution 2025-16
Exhibit A
City of East Wenatchee
Resolution 2025-16
CO-006 Cost Revision Summary
EXISTING CONTRACT ITEMS TO BE MODIFIED:
Item No.Item Description
Spec.
Section
Bid
Quantity
Revised
Quantity Unit Unit Price
Bid
Amount
Revised
Amount Cost Change Notes
C7 Roadway Excavation Incl. Haul 2-03 265 277.0 CY 43.50$ 11,527.50$ 12,049.50$ 522.00$
10" depth excavation across added paving area for extg HMA & base
removal.
C8 Crushed Surfacing Top Course 4-04 592 603.5 TN 35.00$ 20,720.00$ 21,122.50$ 402.50$ 6" depth under HMA for service replacements & 12" water main stub
C9 HMA Cl. 1/2" PG 64-28 5-04 544 556.5 TN 127.00$ 69,088.00$ 70,675.50$ 1,587.50$ 4" depth required for service replacements & 12" water main stub
C13 Ductile Iron Water Pipe for Water Main, 6 In. Diam.7-09 113 153.0 LF 115.00$ 12,995.00$ 17,595.00$ 4,600.00$ 6" lateral for hydrants
C15 Ductile Iron Water Pipe for Water Main, 12 In. Diam.7-09 1350 1430.0 LF 90.00$ 121,500.00$ 128,700.00$ 7,200.00$ 12" water main stub
C31 Adjust Valve Box 7-12 25 26 EA 480.00$ 12,000.00$ 12,480.00$ 480.00$ 1 EA for new GV on 12" water main stub
C32 Hydrant Assembly 7-14 4 6 EA 9,370.00$ 37,480.00$ 56,220.00$ 18,740.00$ 2 total added hydrant replacements
C34 Service Connection 5/8 x 3/4 In. Diam.7-15 7 11 EA 3,600.00$ 25,200.00$ 39,600.00$ 14,400.00$ 4 total added service replacements
C39 Service Line, 1.5 In. Diam 7-15 283 405.5 LF 44.00$ 12,452.00$ 17,842.00$ 5,390.00$ 4 total added service replacements
C44 Utility Potholing for New Water Mains 8-26 54 58 EA 640.00$ 34,560.00$ 37,120.00$ 2,560.00$ 1 EA for each hydrant replacement, 2 EA for 12" water main stub
TOTAL = 55,882.00$
NEW CONTRACT ITEMS TO BE ADDED:
Item No.Item Description
Spec.
Section
Bid
Quantity
Revised
Quantity Unit Unit Price
Bid
Amount
Revised
Amount Cost Change Notes
C45 (CO-006)Miscellaneous 12" DI Stub Items 1-04 0 1 LS 15,435.95$ -$ 15,435.95$ 15,435.95$
6 added working days of 2-Way Flagging and TCS. Accounts for TTC effort
already required for contract work.
TOTAL = 15,435.95$
SUBTOTAL = 71,317.95$
Sales Tax (8.60%) = 6,133.34$
NET TOTAL = 77,451.29$
Item C45 (CO-006) Cost Breakdown:
Labor Type Hours Rate Ext. Cost
TCS/Flagger 24 62.36$ 1,496.64$
Flagger 48 58.29$ 2,797.92$
Flagger 48 58.29$ 2,797.92$
Foreman 4 96.64$ 386.56$
Operator II 4 95.09$ 380.36$
Operator III 4 90.35$ 361.40$
Operator IV 4 86.32$ 345.28$
Laborer 8 68.85$ 550.80$
Total Cost 9,116.88$
Labor Markup (31%)2,826.23$
Total Labor Cost 11,943.11$
Equip Type Hours Rate Ext. Cost
TCS Truck 24 40.63$ 975.12$
Foreman Truck 4 45.69$ 182.76$
Crew Truck 8 41.99$ 335.92$
Loader 4 95.23$ 380.92$
Excavator 8 95.24$ 761.92$
Total Cost 2,636.64$
Equipment Markup (21%)553.69$
Total Equipment Cost 3,190.33$
Material Type Quantity Rate Ext. Cost
Miscellaneous 1 250.00$ 250.00$
Total Cost 250.00$
Material Markup (21%)52.50$
Total Material Cost 302.50$
TOTAL MINOR CHANGE COST =15,435.95$
Notes
Notes
Notes
Includes effort for added hydrants (2), stub, and services (4)
Includes effort for added hydrants (2), stub, and services (4)
Includes effort for added hydrants (2), stub, and services (4)
Incidental to existing bid items, so extra compensation only for "miscellaneous 12" DI stub items"
Incidental to existing bid items, so extra compensation only for "miscellaneous 12" DI stub items"
Incidental to existing bid items, so extra compensation only for "miscellaneous 12" DI stub items"
Incidental to existing bid items, so extra compensation only for "miscellaneous 12" DI stub items"
Incidental to existing bid items, so extra compensation only for "miscellaneous 12" DI stub items"
Incidental to existing bid items, so extra compensation only for "miscellaneous 12" DI stub items"
Incidental to existing bid items, so extra compensation only for "miscellaneous 12" DI stub items"
Incidental to existing bid items, so extra compensation only for "miscellaneous 12" DI stub items"
Incidental to existing bid items, so extra compensation only for "miscellaneous 12" DI stub items"
Includes effort for added hydrants (2), stub, and services (4)
Miscellaneous parts
4 hrs
8 hrs
4 hrs
8 hrs
Calculations
6 days x 4 hrs/day = 24 hrs
Incidental to existing bid items, so extra compensation only for "miscellaneous 12" DI stub items"
Calculations
6 days x 8 hrs/day = 48 hrs
6 days x 8 hrs/day = 48 hrs
6 days x 4 hrs/day = 24 hrs
Calculations
4 hrs
4 hrs
4 hrs
4 hrs
8 hrs
Exhibit A
City of East Wenatchee
Resolution 2025-16
5TH STREET NE
N
J
U
N
E
A
V
E
N
U
E
N
J
O
N
A
T
H
O
N
A
V
E
5TH STREET NE
N
K
A
N
S
A
S
A
V
E
N
U
E
N
K
A
N
S
A
S
A
V
E
N
U
E
GENERAL SITE PREPARATION & TESC NOTES
SITE PREPARATION NOTES
LEGEND
PLAN
DATENO.BY APPR.
DESIGNED BY
CHECKED BY
ENGINEERING MANAGER
PROJECT MANAGER
PROJECT ENGINEER
REVISIONS
DRAWN BY
DATE
FILENAME
19068SPN01.dwg
SHT OFKPG PROJECT No.
DATE
DATE
DATE
DATE
DATE
Approved By
T
Seattle Tacoma
Wenatchee
23 S. Wenatchee Avenue, Suite 223
Wenatchee, WA 98801 509.663.2711
KPG.com 15319068A27
SITE PREPARATION AND TESC
5TH STREET NE
STA 100+00 TO 108+50 (SCH A & D)
3/2023JLF
3/2023
3/2023
MD
MD
PLAN
EAST WENATCHEE
SAFE ROUTES TO SCHOOL
KENROY ELEMENTARY (SCH A & D)
CONFORMED
PLANS
JUNE 2023
R
EGIST E R E D
NO
T
G
N
IHSAWFOETATS
ER
N E
P
R
F
O
E NNALIO
E
S IGS
46996
N A N D E Z MIL
L
E
R
10-
1
3
-
2
0
2
3
W W
10/13/23 KRB KRB FLASHING BEACON RELOCATION & TREE REMOVALS (FWD-005)
6
2 10/13/23 KRB KRB HYDRANT REPLACEMENT (FWD-006) (CO-006)
1
2
IRR
IRR IRR
O/
H
P
O/
H
P
O/
H
P
O/
H
P
U/G T U/G T U/G T U/G T U/G T U/G T U/G T U/G T U/G T U/G T U/G T U/G T U/G T U/G T U/G T U/G T U/G T U/G T U/G T U/G T U/G T U/G T U/G T U/G T
IR
R
IR
R
IR
R
IR
R
IR
R
MARCH 2024
S
S
S
S
S
S
S
S
SS
SS
SS
SS
C
6 CONTRACTOR SHALL REMOVE AND DISPOSE OF EWWD FACILITIES
PER SP 7-09.3(25).
2
CO-006
CO-006
Exhibit A
City of East Wenatchee
Resolution 2025-16
5TH STREET NE
ST
E
R
L
I
N
G
B
U
S
LO
O
P
E
X
I
T
EA
S
T
M
O
N
T
HI
G
H
A
C
C
E
S
S
5TH STREET NE
EA
S
T
M
O
N
T
H
I
G
H
BU
S
L
O
O
P
E
X
I
T
N
I
O
W
A
A
V
E
S
T
E
R
L
I
N
G
B
U
S
L
O
O
P
E
N
T
R
A
N
C
E
SITE PREPARATION NOTES
GENERAL SITE PREPARATION & TESC NOTES
LEGEND
PLAN
PLAN
DATENO.BY APPR.
DESIGNED BY
CHECKED BY
ENGINEERING MANAGER
PROJECT MANAGER
PROJECT ENGINEER
REVISIONS
DRAWN BY
DATE
FILENAME
19068SPN01.dwg
SHT OFKPG PROJECT No.
DATE
DATE
DATE
DATE
DATE
Approved By EAST WENATCHEE
SAFE ROUTES TO SCHOOL
STERLING INTERMEDIATE (SCH B)
Seattle Tacoma
Wenatchee
23 S. Wenatchee Avenue, Suite 223
Wenatchee, WA 98801 509.663.2711
KPG.com 15319068A31
SITE PREPARATION AND TESC
5TH STREET NE
STA 407+00 TO STA 415+50 (SCH B)
3/2023JLF
3/2023
3/2023
MD
MD CONFORMED
PLANS
JUNE 2023
REGIST E R E D
NO
T
G
N
IHSAWFOETATS
ER
N E
P
R
F
O
E NNALIO
E
S IGS
46996
N A N D E Z MIL
L
E
R
4-4
-
2
0
2
4
ST
O/
H
P
O/
H
P
O/
H
P
U/G FO U/G FO U/G FO U/G FO
U/G FO U/G FO U/G FO U/G FO
U/G FO U/G FO U/G FO U/G FO U/G FO U/G FO U/G FO U/G FO U/G FO U/G FO U/G FO U/G FO U/G FO
U/G FO U/G FO U/G FO U/G FO U/G FO U/G FO
S
S
O/H P O/H P O/H P O/H P O/H P O/H P O/H P O/H P O/H P O/H P O/H P O/H P O/H P O/H P O/H P
S
T
W
(
A
B
A
N
)
W
(
A
B
A
N
)
W
(
A
B
A
N
)
W
(
A
B
A
N
)
UK
W
N
(
A
B
A
N
)
W
(
A
B
A
N
)
W
(
A
B
A
N
)
W
(
A
B
A
N
)
1
1
6
1 4/4/24 KRB KRB HYDRANT REPLACEMENT (FWD-012) (CO-006)
MARCH 2024
C.O.C.O.
COMM
6 CONTRACTOR SHALL REMOVE AND DISPOSE OF EWWD FACILITIES
PER SP 7-09.3(25).
U/
G
C
O
M
M
U/
G
C
O
M
M
U/
G
C
O
M
M
CO-006
CO-006
Exhibit A
City of East Wenatchee
Resolution 2025-16
5TH STREET NE
N
J
A
M
E
S
S
T
R
E
E
T
SITE PREPARATION NOTES
GENERAL SITE PREPARATION & TESC NOTES
LEGEND PLAN
DATENO.BY APPR.
DESIGNED BY
CHECKED BY
ENGINEERING MANAGER
PROJECT MANAGER
PROJECT ENGINEER
REVISIONS
DRAWN BY
DATE
FILENAME
19068SPN01.dwg
SHT OFKPG PROJECT No.
DATE
DATE
DATE
DATE
DATE
Approved By EAST WENATCHEE
SAFE ROUTES TO SCHOOL
STERLING INTERMEDIATE (SCH B)
D
Seattle Tacoma
Wenatchee
23 S. Wenatchee Avenue, Suite 223
Wenatchee, WA 98801 509.663.271
KPG.com 15319068A32
SITE PREPARATION AND TESC
5TH STREET NE
STA 415+50 TO STA END (SCH B)
3/2023JLF
3/2023
3/2023
MD
MD
5+5023ATC
IONS3ATC
KRB
KRB6
6
REVISED PAVEMENT REMOVAL LIM
VIEWPORT ADJUSTED FROM 6 TO (FWD-001)
(FWD-001)DCONFORMED
PLANS
JUNE 2023MARCH 2024
R
EGIST E R E D
NO
T
G
N
IHSAWFOETATS
ER
N E
P
R
F
O
E NNALIO
E
S IGS
66
N A N D E = MIL
L
E
R
6-1
2
-
2
0
2
4
O/
H
P
O/H P O/H P O/H P
O
/
H
P
O
/
H
P
O
/
H
P
O
/
H
P
O/H P
SSSSSS
W (ABAN)
W
(
A
B
A
N
)
MA
T
C
H
L
I
N
E
S
T
A
4
2
0
+
2
2
.
0
5
TH
I
S
S
H
E
E
T
UK
W
N
(
A
B
A
N
)
U
K
W
N
(
A
B
A
N
)
UKWN UKWN
3 4/19/24 KRB KRB WATER MAIN STUB (FWD-013) (CO-006)
STA 419+72.10
5.50' RT
4/22/24 KRB KRB ELECTRICAL SERVICE "S3" CONDUIT REVISION (FWD-014)4
3
4IRR
IR
R
S S
W W W
420+50
1
MA
T
C
H
L
I
N
E
S
T
A
42
0
+
2
2
.
0
5
T
H
I
S
S
H
E
E
T
S
5
5 8/16/24 KRB KRB SCHEDULE C ADDED SERVICES (CO-006)
5
5 5
5
5
CO-006
CO-006
CO-006
CO-006
CO-006 CO-006
Exhibit A
City of East Wenatchee
Resolution 2025-16
N JAMES STREET
6T
H
P
L
A
C
E
N
E
N JAMES STREET
SITE PREPARATION NOTES
GENERAL SITE PREPARATION & TESC NOTES
LEGEND
PLAN
PLAN
DATENO.BY APPR.
DESIGNED BY
CHECKED BY
ENGINEERING MANAGER
PROJECT MANAGER
PROJECT ENGINEER
REVISIONS
DRAWN BY
DATE
FILENAME
19068SPN01.dwg
SHT OFKPG PROJECT No.
DATE
DATE
DATE
DATE
DATE
Approved By EAST WENATCHEE
SAFE ROUTES TO SCHOOL
STERLING INTERMEDIATE (SCH B)
Seattle Tacoma
Wenatchee
23 S. Wenatchee Avenue, Suite 223
Wenatchee, WA 98801 509.663.2711
KPG.com 15319068A33
SITE PREPARATION AND TESC
JAMES ST
STA 501+00 TO STA 509+00 (SCH B)
15319068A33
SITE PREPARATION AND TESC
JAMES ST
STA 501+00 TO STA 509+00 (SCH B)
3/2023JLF
3/2023
3/2023
MD
MD CONFORMED
PLANS
JUNE 2023
R
EGIST E R E D
NO
T
G
N
IHSAWFOETATS
ER
N E
P
R
F
O
E NNALIO
E
S IGS
46996
N A N D E Z MIL
L
E
R
6-1
2
-
2
0
2
4
W (ABAN)W (ABAN)W (ABAN)W (ABAN)W (ABAN)W (ABAN)W (ABAN)W (ABAN)W (ABAN)W (ABAN)
O/
H
P
O/
H
P
O/
H
P
O/
H
P
O/
H
P
O/
H
P
O/
H
P
O/
H
P
O/
H
P
O/
H
P
U/
G
T
U/
G
T
U/
G
T
U/
G
T
U/
G
T
U/
G
T
W
W
W
W
UK
W
N
(
A
B
A
N
)
G
G
G
G
G
G G G G G G
MARCH 2024
S
S
1 8/16/24 KRB KRB SCHEDULE C ADDED SERVICES (CO-006)
1
1
1
CO-006
CO-006
Exhibit A
City of East Wenatchee
Resolution 2025-16
5TH ST NE
N
J
A
M
E
S
A
V
E
CONSTRUCTION NOTES
GENERAL NOTES
DESIGNED BY
CHECKED BY
ENGINEERING MANAGER
PROJECT MANAGER
PROJECT ENGINEER
DRAWN BY
DATE
FILENAME
19068ARDW01.dwg
SHT OFKPG PROJECT No.
DATE
DATE
DATE
DATE
DATE
Approved By EAST WENATCHEE
SAFE ROUTES TO SCHOOL
STERLING INTERMEDIATE (SCH B)
Seattle Tacoma
Wenatchee
23 S. Wenatchee Avenue, Suite 223
Wenatchee, WA 98801 509.663.2711
KPG.com 15319068A42
ROADWAY PLANS
5TH STREET NE
STA 415+50 TO STA END (SCH B)
3/2023JLF
3/2023
3/2023
MD
MD
PLAN
'ATENO.B< APPR.REVISIONS
(FWD-007)NM11
4/19/24 KRB KRB WATER MAIN STUB (FWD-013)12
4/22/24 KRB KRB ELECTRICAL SERVICE "S3" CONDUIT REVISION (FWD-014)13
14
14
14
R
EGIST E R E '
NO
T
G
N
IHSAWFOETATS
ER
N E
P
R
F
O
E NNALIO
E
S IGS
466
N A N 'E = MIL
L
E
R
6-1
2
-
2
0
2
4
11
T
CONFORMED
PLANS
JUNE 2023MARCH 2024
420+50
N (FWD-014)
N (FWD-014)
AND CURB & GUTTER REVISIONS (FWD-016)
14
14
8
(CO-006)
S
15 15
8/16/24 KRB KRB SCHEDULE C ADDED SERVICES (CO-006)15
12
CO-006
CO-006
Exhibit A
City of East Wenatchee
Resolution 2025-16
N JAMES AVE
6T
H
P
L
A
C
E
N
E
N JAMES AVE
CONSTRUCTION NOTES
GENERAL NOTES
PLAN
PLAN
DESIGNED BY
CHECKED BY
ENGINEERING MANAGER
PROJECT MANAGER
PROJECT ENGINEER
DRAWN BY
DATE
FILENAME
19068ARDW01.dwg
SHT OFKPG PROJECT No.
DATE
DATE
DATE
DATE
DATE
Approved By EAST WENATCHEE
SAFE ROUTES TO SCHOOL
STERLING INTERMEDIATE (SCH B)
Seattle Tacoma
Wenatchee
23 S. Wenatchee Avenue, Suite 223
Wenatchee, WA 98801 509.663.2711
KPG.com 15319068A43
ROADWAY PLANS
N JAMES STREET
STA 501+00 TO STA 509+50 (SCH B)
3/2023JLF
3/2023
3/2023
MD
MD
'ATENO.B< APPR.REVISIONS
NM
(FWD-007)NM (FWD-007)
11
6
12 R
EGIST E R E '
NO
T
G
N
IHSAWFOETATS
ER
N E
P
R
F
O
E NNALIO
E
S IGS
466
N A N 'E = MIL
L
E
R
6-1
2
-
2
0
2
4
11
T
CONFORMED
PLANS
JUNE 2023MARCH 2024
AND CURB & GUTTER REVISIONS (FWD-016)
G
G
G
G
G
33
G G G G G G
STA 502+51.30
16.00' LT38
8/16/24 KRB KRB SCHEDULE C ADDED SERVICES (CO-006)13
13
CO-006
Exhibit A
City of East Wenatchee
Resolution 2025-16
5TH ST NE
N
J
U
N
E
A
V
E
N
J
O
N
A
T
H
O
N
A
V
E
5TH ST NE
N
K
A
N
S
A
S
A
V
E
N
K
A
N
S
A
S
A
V
E
GENERAL NOTES
CONSTRUCTION NOTES
PLAN
PLAN
DATENO.BY APPR.
DESIGNED BY
CHECKED BY
ENGINEERING MANAGER
PROJECT MANAGER
PROJECT ENGINEER
REVISIONS
DRAWN BY
DATE
FILENAME
19068UTIL01.dwg
SHT OFKPG PROJECT No.
DATE
DATE
DATE
DATE
DATE
Approved By EAST WENATCHEE
SAFE ROUTES TO SCHOOL
KENROY ELEMENTARY (SCH A)
Seattle Tacoma
Wenatchee
23 S. Wenatchee Avenue, Suite 223
Wenatchee, WA 98801 509.663.271
KPG.com
AC
AC
3/2023
3/2023
JLF 3/2023
UTILITY COORDINATION
5TH AVE NE
STA 100+00 TO STA 108+50 (SCH A)
6419068A 153
CONFORMED
PLANS
JUNE 2023
R
EGIST E R E D
NO
T
G
N
IHSAWFOETATS
ER
N E
P
R
F
O
E NNALIO
E
S IGS
46996
N A N D E Z MIL
L
E
R
10-
1
3
-
2
0
2
3
12
1 10/13/23 KRB KRB HYDRANT REPLACEMENT (FWD-006) (CO-006)
1
ST
ST
SSSSSSSSSSSSSSSSSSSSSSSSSSSS
SS
SS
SS
SS
STSTSTSTSTSTST
W
W
W
W
W
W
W
O/
H
P
O/
H
P
O/
H
P
IRR
IRR IRR
14 (2)
14
14
14(2)
U/G T U/G T U/G T U/G T U/G T U/G T U/G T U/G T U/G T U/G T U/G T U/G T U/G T U/G T U/G T U/G T U/G T U/G T U/G T U/G T U/G T U/G T U/G T U/G T
IR
R
IR
R
IR
R
IR
R
IR
R
MARCH 2024
S
S
S
S
S
S
S
S
14
14
SS
SS
SS
SS
14
C
11
CO-006
CO-006
Exhibit A
City of East Wenatchee
Resolution 2025-16
5TH ST NE
ST
E
R
L
I
N
G
B
U
S
LO
O
P
E
X
I
T
EA
S
T
M
O
N
T
HI
G
H
A
C
C
E
S
S
5TH ST NE
EA
S
T
M
O
N
T
H
I
G
H
BU
S
L
O
O
P
E
X
I
T
N
I
O
W
A
A
V
E
ST
E
R
L
I
N
G
B
U
S
LO
O
P
E
N
T
R
A
N
C
E
CONSTRUCTION NOTES
GENERAL NOTES
PLAN
PLAN
3/2023JLF
3/2023
3/2023
AC
AC
15319068A68
UTILITY COORDINATION
5TH STREET NE
STA 407+00 TO STA 415+50 (SCH B)
DATENO.BY APPR.
DESIGNED BY
CHECKED BY
ENGINEERING MANAGER
PROJECT MANAGER
PROJECT ENGINEER
REVISIONS
DRAWN BY
DATE
FILENAME
19068UTIL01.dwg
SHT OFKPG PROJECT No.
DATE
DATE
DATE
DATE
DATE
Approved By EAST WENATCHEE
SAFE ROUTES TO SCHOOL
STERLING INTERMEDIATE (SCH B)
Seattle Tacoma
Wenatchee
23 S. Wenatchee Avenue, Suite 223
Wenatchee, WA 98801 509.663.2711
KPG.com
CONFORMED
PLANS
JUNE 2023
REGIST E R E D
NO
T
G
N
IHSAWFOETATS
ER
N E
P
R
F
O
E NNALIO
E
S IGS
46996
N A N D E Z MIL
L
E
R
4-4
-
2
0
2
4
S
T
S
T
ST
ST
ST
ST
ST
ST
ST
ST
U/G FO U/G FO U/G FO U/G FO
U/G FO U/G FO U/G FO U/G FO
U/G FO U/G FO U/G FO U/G FO U/G FO U/G FO U/G FO U/G FO U/G FO U/G FO U/G FO U/G FO U/G FO
ST
U/G FO U/G FO U/G FO U/G FO U/G FO U/G FO
O/
H
P
O/
H
P
O/
H
P
S
S
O/H P O/H P O/H P O/H P O/H P O/H P O/H P O/H P
W W W W W
W W W W W
(DCPUD)
UK
W
N
(
A
B
A
N
)
W
(
A
B
A
N
)
W
(
A
B
A
N
)
W
(
A
B
A
N
)
W
(
A
B
A
N
)
W
(
A
B
A
N
)
W
(
A
B
A
N
)
W
(
A
B
A
N
)
1
1 4/4/24 KRB KRB HYDRANT REPLACEMENT (FWD-012) (CO-006)
O/H P O/H P O/H P O/H P O/H P O/H P O/H P
14
12
MARCH 2024
W W W W W W W W W
1
13
U/
G
C
O
M
M
U/
G
C
O
M
M
U/
G
C
O
M
M
COMM
CO-006
1
CO-006
Exhibit A
City of East Wenatchee
Resolution 2025-16
5TH ST NE
N
J
A
M
E
S
A
V
E
CONSTRUCTION NOTES
GENERAL NOTES
PLAN
3/2023JLF
3/2023
3/2023
AC
AC
15319068A69
UTILITY COORDINATION
5TH ST NE
STA 415+50 TO STA 420+50 (SCH B)
DATENO.BY APPR.
DESIGNED BY
CHECKED BY
ENGINEERING MANAGER
PROJECT MANAGER
PROJECT ENGINEER
REVISIONS
DRAWN BY
DATE
FILENAME
19068UTIL01.dwg
SHT OFKPG PROJECT No.
DATE
DATE
DATE
DATE
DATE
Approved By EAST WENATCHEE
SAFE ROUTES TO SCHOOL
STERLING INTERMEDIATE (SCH B)
Seattle Tacoma
Wenatchee
23 S. Wenatchee Avenue, Suite 223
Wenatchee, WA 98801 509.663.2711
KPG.com
CONFORMED
PLANS
JUNE 2023
R
EGIST E R E D
NO
T
G
N
IHSAWFOETATS
ER
N E
P
R
F
O
E NNALIO
E
S IGS
46996
N A N D E Z MIL
L
E
R
6-1
2
-
2
0
2
4
W (ABAN)
W
(
A
B
A
N
)
UK
W
N
(
A
B
A
N
)
UK
W
N
(
A
B
A
N
)
UKWN UKWN
O/
H
P
O/
H
P
IRR IRR IRR IRR IRR IRRU/G T U/G T U/G T U/G T U/G T
SSSSSS
O/H P O/H P O/H P O/H P O/H P O/H P O/H P O/H PO/H P O/H P O/H P O/H P O/H P O/H P O/H P O/H P
(4)
W W W W W W W
APPROX. STA. 418+87.1, 9.0' R,
CONNECTION TO EXISTING(1) - 12" GATE VALVE (RJxRJ)(1) - 12" FOSTER ADAPTER
APPROX 80 LF of 12" RJ DI PIPE
6/12/24 KRB KRB WATER MAIN STUB (FWD-013) (CO-006)1
MARCH 2024
W W W W W W W W W W W W W W W W W W W W W W W W W W W
W
W
W
W
W
W
W
W
W
IRR
IR
R
SS
LOCATE DOUGLAS COUNTY SEWER MAIN.6
1
6
1
W W W
APPROX 15 LF of
3/4" POLY PIPE
APPROX. STA. 419+65.1, 23.8' R,
WATER METER CHAMBER TOP
APPROX. STA. 419+67.1, 9.0' R,
(1) - 12" DI RJ CAP w/ 3" PORT
(1) - PRECAST CONC THRUST BLOCK(1) - 12"x3/4" SADDLE TAP (NO CORP)(1) - MISC. FITTINGS, AS REQ'D
CONTACT EWWD TO DEPRESSURIZE EXISTING
MAIN. REMOVE EXISTING PLUG AND THRUST
BLOCK FROM 12"x12" DI TEE FOR CONNECTION.EXISTING WATER MAIN TO BE OUT OF SERVICENO LONGER THAN ONE 8-HOUR WORKING DAY.
INSTALL (2) 12" RJ 45-DEGREE VERTICALBENDS NEEDED TO RUN NEW 12" DI WATER
MAIN UNDER EXISTING 8" DI WATER MAIN.
1
APPROX. STA. 419+22.9, 41.2' R,(1) - 5/8" x 3/4" WATER SERVICE
W/ 1-1/2" SERVICE LINE
REMOVE EXISTING WATER
SERVICE PER EWWD
STANDARD DETAIL W-15
APPROX. STA. 417+28.0, 28.8' R,(1) - 5/8" x 3/4" WATER SERVICE
W/ 1-1/2" SERVICE LINE
REMOVE EXISTING WATERSERVICE PER EWWDSTANDARD DETAIL W-15
REMOVE EXISTING WATER
SERVICE PER EWWDSTANDARD DETAIL W-15
APPROX. STA. 416+42.0, 28.0' R,(1) - 5/8" x 3/4" WATER SERVICE
W/ 1-1/2" SERVICE LINE
OVER
2 8/16/24 KRB KRB SCHEDULE C ADDED SERVICES (CO-006)
S
2
2CO-006
CO-006
CO-006
CO-006
Exhibit A
City of East Wenatchee
Resolution 2025-16
N JAMES AVE
6T
H
P
L
A
C
E
N
E
N JAMES AVE
CONSTRUCTION NOTES
GENERAL NOTES
PLAN
PLAN
3/2023JLF
3/2023
3/2023
AC
AC
15319068A70
UTILITY COORDINATION
JAMES AVE
STA 501+00 TO STA 509+00 (SCH B)
DATENO.BY APPR.
DESIGNED BY
CHECKED BY
ENGINEERING MANAGER
PROJECT MANAGER
PROJECT ENGINEER
REVISIONS
DRAWN BY
DATE
FILENAME
19068UTIL01.dwg
SHT OFKPG PROJECT No.
DATE
DATE
DATE
DATE
DATE
Approved By EAST WENATCHEE
SAFE ROUTES TO SCHOOL
STERLING INTERMEDIATE (SCH B)
Seattle Tacoma
Wenatchee
23 S. Wenatchee Avenue, Suite 223
Wenatchee, WA 98801 509.663.271
KPG.com
CONFORMED
PLANS
JUNE 2023
R
EGIST E R E D
NO
T
G
N
IHSAWFOETATS
ER
N E
P
R
F
O
E NNALIO
E
S IGS
46996
N A N D E Z MIL
L
E
R
6-1
2
-
2
0
2
4
W (ABAN)W (ABAN)W (ABAN)W (ABAN)W (ABAN)W (ABAN)W (ABAN)W (ABAN)W (ABAN)W (ABAN)
1
O/
H
P
O/
H
P
O/
H
P
O/
H
P
O/
H
P
O/
H
P
O/
H
P
O/
H
P
O/
H
P
U/
G
T
U/
G
T
U/
G
T
U/
G
T
U/
G
T
U/
G
T
W
W
W
W
UK
W
N
(
A
B
A
N
)
G
G
G
G
G
G G G G G G
MARCH 2024
3
REMOVE EXISTING WATERSERVICE PER EWWDSTANDARD DETAIL W-15
APPROX. STA. 501+92.5, 22.0' R,(1) - 5/8" x 3/4" WATER SERVICE
W/ 1-1/2" SERVICE LINE
S
S
1 8/16/24 KRB KRB SCHEDULE C ADDED SERVICES (CO-006)
1
CO-006
Exhibit A
City of East Wenatchee
Resolution 2025-16
2/14/2025
Exhibit A
City of East Wenatchee
Resolution 2025-16
Exhibit A
City of East Wenatchee
Resolution 2025-16
CO-007 Cost Revision Summary
EXISTING CONTRACT ITEMS TO BE MODIFIED:
Item No.Item Description
Spec.
Section
Current
Quantity
Revised
Quantity Unit Unit Price
Current
Amount
Revised
Amount Cost Change Notes
C7 Roadway Excavation Incl. Haul 2-03 277.0 345.0 CY 43.50$ 12,049.50$ 15,007.50$ 2,958.00$
10"-depth excavation across added paving area for extg HMA & base
removal.
C8 Crushed Surfacing Top Course 4-04 603.5 674.5 TN 35.00$ 21,122.50$ 23,607.50$ 2,485.00$ 6" depth under HMA.
C9 HMA Cl. 1/2" PG 64-28 5-04 556.5 609.5 TN 127.00$ 70,675.50$ 77,406.50$ 6,731.00$ 4" depth over 2,070 SF.
C31 Adjust Valve Box 7-12 26 31 EA 480.00$ 12,480.00$ 14,880.00$ 2,400.00$ 4 EA at extg cross plus 1 EA at extg auxiliary GV for hydrant lateral.
C44 Utility Potholing for New Water Mains 8-26 58 59 EA 640.00$ 37,120.00$ 37,760.00$ 640.00$ 1 EA for checking subgrade soil conditions.
TOTAL = 15,214.00$
NEW CONTRACT ITEMS TO BE ADDED:
Item No.Item Description
Spec.
Section
Bid
Quantity
Revised
Quantity Unit Unit Price
Bid
Amount
Revised
Amount Cost Change Notes
C46 (CO-007)5th & Kentucky Added Paving - Traffic Control 1-04 0 1 LS 3,490.35$ -$ 3,490.35$ 3,490.35$
2 added working days of 2-Way Flagging and TCS. Accounts for TTC effort
already required for contract work.
C47 (CO-007)
5th & Kentucky Added Paving - Miscellaneous
Items 1-04 0 1 LS 2,003.50$ -$ 2,003.50$ 2,003.50$
Adjust Manhole: 2 EA @ $695.00
Replace Monument and Monument Case and Cover: 1 EA @ $595.00
Paint Line: 74 LF @ $0.25
TOTAL = 5,493.85$
SUBTOTAL = 20,707.85$
Sales Tax (8.60%) = 1,780.87$
NET TOTAL = 22,488.72$
Item C46 (CO-007) Cost Breakdown:
Labor Type Hours Rate Ext. Cost
TCS/Flagger 8 62.36$ 498.88$
Flagger 16 58.29$ 932.64$
Flagger 16 58.29$ 932.64$
Total Cost 2,364.16$
Labor Markup (31%)732.89$
Total Labor Cost 3,097.05$
Equip Type Hours Rate Ext. Cost
TCS Truck 8 40.63$ 325.04$
Total Cost 325.04$
Equipment Markup (21%)68.26$
Total Equipment Cost 393.30$
TOTAL MINOR CHANGE (TTC) COST =3,490.35$
2 days x 4 hrs/day = 8 hrs
Calculations
2 days x 8 hrs/day = 16 hrs
2 days x 8 hrs/day = 16 hrs
2 days x 4 hrs/day = 8 hrs
Calculations
Half of intersection per plan and incidental to LS item A7, so extra compensation only for added paving area efforts
Notes
Half of intersection per plan and incidental to LS item A7, so extra compensation only for added paving area efforts
Half of intersection per plan and incidental to LS item A7, so extra compensation only for added paving area efforts
Half of intersection per plan and incidental to LS item A7, so extra compensation only for added paving area efforts
Notes
Exhibit A
City of East Wenatchee
Resolution 2025-16
5TH STREET NE
N
K
E
L
L
E
R
A
V
E
KE
N
T
T
E
R
R
A
C
E
5TH STREET NE
N
K
E
N
T
U
C
K
Y
A
V
E
FU
L
L
E
R
S
T
R
E
E
T
SITE PREPARATION NOTES
GENERAL SITE PREPARATION & TESC NOTES
LEGEND
PLAN
PLAN
DATENO.BY APPR.
DESIGNED BY
CHECKED BY
ENGINEERING MANAGER
PROJECT MANAGER
PROJECT ENGINEER
REVISIONS
DRAWN BY
DATE
FILENAME
19068SPN01.dwg
SHT OFKPG PROJECT No.
DATE
DATE
DATE
DATE
DATE
Approved By
CONFORMED
PLANS
Seattle Tacoma
Wenatchee
23 S. Wenatchee Avenue, Suite 223
Wenatchee, WA 98801 509.663.2711
KPG.com 15319068A28
SITE PREPARATION AND TESC
5TH STREET NE
STA 108+50 TO STA 115+00 (SCH A)
3/2023JLF
3/2023
3/2023
MD
MD
EAST WENATCHEE
SAFE ROUTES TO SCHOOL
KENROY ELEMENTARY (SCH A)
CKY6/14/23 ATC KRB REVISED PAVEMENT REMOVAL LIM(FWD-001)
R
EGIST E R E D
NO
T
G
N
IHSAWFOETATS
ER
N E
P
R
F
O
E NNALIO
E
S IGS
66
N A N D E = MIL
L
E
R
7-1
-
2
0
2
4
U/
G
T
U/
G
T
U/
G
T
S
S
SSSSSSSSSS
S
S
ST
ST
14
IR
R
IR
R
IR
R
IRR IRR IRR IRR IRR IRR IRR
IRR
IRR
IRR IRR IRR IRR IRR
IR
R
IR
R
IR
R
IR
R
IR
R
IR
R
MARCH 2024
UK
W
N
(
A
B
A
N
)
IRR
46.94'
11
POTHOLE SUBGRADE SOILS
OVER EXISTING WATER MAIN
TO DETERMINE SATURATION
LEVEL AND CONDITION.
STA 114+42.00
25.13' RT
STA 114+36.50
64.00' RT
STA 114+23.90
55.50' RT
3
2 8/16/24 KRB KRB 5TH & KENTUCKY PAVING LIMIT REVISIONS (CO-007)
2
2STA 114+42.17
18.00' LT
CO-007
CO-007
Exhibit A
City of East Wenatchee
Resolution 2025-16
5TH ST NE
N
K
E
N
T
U
C
K
Y
A
V
E
FU
L
L
E
R
S
T
KE
N
T
T
E
R
R
A
C
E
CONSTRUCTION NOTES
GENERAL NOTES
KENROY 5TH ST NE
STA 112+00 TO STA 115+00
PLAN
DATENO.BY APPR.
DESIGNED BY
CHECKED BY
ENGINEERING MANAGER
PROJECT MANAGER
PROJECT ENGINEER
REVISIONS
DRAWN BY
DATE
FILENAME
19068ARDPRO01.dwg
SHT OFKPG PROJECT No.
DATE
DATE
DATE
DATE
DATE
Approved By EAST WENATCHEE
SAFE ROUTES TO SCHOOL
KENROY ELEMENTARY (SCH A)
Seattle Tacoma
Wenatchee
23 S. Wenatchee Avenue, Suite 223
Wenatchee, WA 98801 509.663.2711
KPG.com 15319068A38
ROADWAY PLAN AND PROFILE
5TH STREET NE
STA 112+00 TO STA 115+00 (SCH A)
3/2023JLF
3/2023
3/2023
MD
MD EAST WENATCHEE
SAFE ROUTES TO SCHOOL
KENROY ELEMENTARY (SCH A)
08/2023 MD NM BUS STOPS MOVED
06/2024 AC KB MOVE STOP SIGN AND REVISE SIDEWALK (RFI 047)
T
3
11
T
3
11
CONFORMED
PLANS
JUNE 2023MARCH 2024
-7
6
R
EGIST E R E D
NO
T
G
N
IHSAWFOETATS
ER
N E
P
R
F
O
E NNALIO
E
S IGS
N A N D E Z MIL
L
E
R
7-1
-
2
0
2
4
MARCH 2024
8 8/16/24 KRB KRB 5TH & KENTUCKY PAVING LIMIT REVISIONS (CO-007)
IRR
8
PV
I
S
T
A
=
1
1
4
+
4
2
.
1
3
EL
=
1
0
2
8
.
5
7
2.73%
8
8
34
CO-007
CO-007
CO-007
Exhibit A
City of East Wenatchee
Resolution 2025-16
5TH ST NE
N
K
E
L
L
E
R
A
V
E
KE
N
T
T
E
R
R
A
C
E
5TH ST NE
N
K
E
N
T
U
C
K
Y
AV
E
FU
L
L
E
R
S
T
CONSTRUCTION NOTES
GENERAL NOTES
PLAN
PLAN
DATENO.BY APPR.
DESIGNED BY
CHECKED BY
ENGINEERING MANAGER
PROJECT MANAGER
PROJECT ENGINEER
REVISIONS
DRAWN BY
DATE
FILENAME
19068UTIL01.dwg
SHT OFKPG PROJECT No.
DATE
DATE
DATE
DATE
DATE
Approved By EAST WENATCHEE
SAFE ROUTES TO SCHOOL
KENROY ELEMENTARY (SCH A)
Seattle Tacoma
Wenatchee
23 S. Wenatchee Avenue, Suite 223
Wenatchee, WA 98801 509.663.2711
KPG.com
3/2023JLF
3/2023
3/2023
AC
AC
15319068A65
UTILITY COORDINATION
5TH AVE NE
STA 108+50 TO STA 115+00 (SCH A)
CONFORMED
PLANS
JUNE 2023
R
EGIST E R E D
NO
T
G
N
IHSAWFOETATS
ER
N E
P
R
F
O
E NNALIO
E
S IGS
46996
N A N D E Z MIL
L
E
R
7-1
-
2
0
2
4
U/G T U/G T U/G T U/G T
U/
G
T
ST
ST
ST
STSTSTSTST
STSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTSTST
U/
G
T
U/
G
T
U/
G
T
IR
R
IR
R
IRR IRR IRR IRR IRR IRR IRR
IRR
IRR
IRR IRR IRR IRR IRR IRR
IR
R
IR
R
IR
R
IR
R
IR
R
IR
R
MARCH 2024
UK
W
N
(
A
B
A
N
)
13
IRR
13
14
1 8/16/24 KRB KRB 5TH & KENTUCKY PAVING LIMIT REVISIONS (CO-007)
1
1
14 (4)
S
CO-007
CO-007
Exhibit A
City of East Wenatchee
Resolution 2025-16
5TH ST NE
N
K
E
L
L
E
R
AV
E
KE
N
T
T
E
R
R
A
C
E
5TH ST NE
FU
L
L
E
R
S
T
N
K
E
N
T
U
C
K
Y
AV
E
CHANNELIZATION NOTES
GENERAL NOTES
SIGN SCHEDULE
SIGN SCHEDULE
MAILBOX SCHEDULE
PLAN
PLAN
DATENO.BY APPR.
DESIGNED BY
CHECKED BY
ENGINEERING MANAGER
PROJECT MANAGER
PROJECT ENGINEER
REVISIONS
DRAWN BY
DATE
FILENAME
19068CHAN01.dwg
SHT OFKPG PROJECT No.
DATE
DATE
DATE
DATE
DATE
Approved By EAST WENATCHEE
SAFE ROUTES TO SCHOOL
KENROY ELEMENTARY (SCH A)
Seattle Tacoma
Wenatchee
23 S. Wenatchee Avenue, Suite 223
Wenatchee, WA 98801 509.663.2711
KPG.com 15319068A96
CHANNELIZATION PLAN
5TH STREET NE
STA 108+50 TO 115+00 (SCH A)
3/2023JLF
3/2023
3/2023
AC
AC
08/2023 MD NM BUS STOP MOVED
06/2024 AC KB MOVE STOP SIGN AND REVISE SIDEWALK (RFI 047)
NEW SIGN(BY OTHERS)
T
3
11
T
3
11
CONFORMED
PLANS
JUNE 2023MARCH 2024
-7
6
R
EGIST E R E D
NO
T
G
N
IHSAWFOETATS
ER
N E
P
R
F
O
E NNALIO
E
S IGS
N A N D E Z MIL
L
E
R
7-1
-
2
0
2
4
10
MARCH 2024
8 8/16/24 KRB KRB 5TH & KENTUCKY PAVING LIMIT REVISIONS (CO-007)
114+11.20
55.52'114+23.00
55.46'MATCH TO
EXISTING
8
8
114+23.45
STA 114+34.65
63.95' RT 9
CO-007
CO-007
Exhibit A
City of East Wenatchee
Resolution 2025-16
2/21/2025
Exhibit A
City of East Wenatchee
Resolution 2025-16
Exhibit A
City of East Wenatchee
Resolution 2025-16
CO-008 Cost Revision Summary
EXISTING CONTRACT ITEMS TO BE MODIFIED:
Item No.Item Description
Spec.
Section
Current
Quantity
Revised
Quantity Unit Unit Price
Current
Amount
Revised
Amount Cost Change
B12 Roadway Excavation Incl. Haul 2-03 1130 1135.7 CY 46.50$ 52,545.00$ 52,810.05$ 265.05$
B15 Crushed Surfacing Top Course 4-04 1957.0 1956.5 TN 35.00$ 68,495.00$ 68,477.50$ (17.50)$
B34 Topsoil Type A 8-02 40 40.7 CY 80.00$ 3,200.00$ 3,256.00$ 56.00$
B35 Seeded Lawn Installation 8-02 405 417.3 SY 5.00$ 2,025.00$ 2,086.50$ 61.50$
B45 Cement Concrete Driveway 8-06 101 146.0 SY 184.00$ 18,584.00$ 26,864.00$ 8,280.00$
B75 (CO-003) HMA Cl. 3/8" PG 64-28 5-04 22.0 14.8 TN 130.50$ 2,871.00$ 1,931.40$ (939.60)$
TOTAL =7,705.45$
NEW CONTRACT ITEMS TO BE ADDED:
No new items.
NET TOTAL =7,705.45$
Exhibit A
City of East Wenatchee
Resolution 2025-16
1
Kyle Burtis
From:Wes Wagner <wesw@activeconstruction.com>
Sent:Tuesday, December 17, 2024 3:43 PM
To:Kyle Burtis
Subject:FW: EW-SRTS: DBE Acknowledgement Needed for Driveway D19
Attachments:FWD-021.pdf
Kyle,
I sent the below email to Gilbert and they never responded.
Thanks,
2
O: 253 230-4630 | F: 253 248-1093
“GET ACTIVE”
P.O. Box 430, Puyallup, WA 98371 | www.activeconstruction.com | wesw@activeconstruction.com
ACI is an Equal Opportunity Employer | FOLLOW US:
________________________________________
IMPORTANT/CONFIDENTIAL: This e-mail message (and any attachments accompanying it) may contain
confidential information. The information is intended only for the use of the intended recipient(s). Delivery of this
message to anyone other than the intended recipient(s) is not intended to waive any privilege or otherwise detract
from the confidentiality of the message. If you are not the intended recipient, or if this message has been
addressed to you in error, do not read, disclose, reproduce, distribute, disseminate or otherwise use this
transmission, rather, please promptly notify the sender by reply e-mail, and then destroy all copies of the message
and its attachments, if any.
From: Kyle Burtis <kyle.burtis@psomas.com>
Sent: Tuesday, November 19, 2024 4:51 PM
To: Wes Wagner <wesw@activeconstruction.com>
Cc: Eugene Carollo <eugenec@activeconstruction.com>; Naomi Tiffany <naomil@activeconstruction.com>; Jennifer
Smiley <Jennifer.Smiley@psomas.com>; Anne Carr <anne.carr@psomas.com>; Garren Melton
<GMelton@eastwenatcheewa.gov>
Subject: RE: EW-SRTS: DBE Acknowledgement Needed for Driveway D19
Wes,
Can you please reach out to Gilbert Patterson to obtain email confirmation noted below? This is critical to
complete the change order per WSDOT’s direction.
Thank you.
Kyle Burtis, PE
Senior Project Engineer
D: 509-662-4068
C: 307-752-4162
From: Kyle Burtis
Sent: Tuesday, October 29, 2024 6:38 PM
To: Wes Wagner <wesw@activeconstruction.com>
Cc: Eugene Carollo <eugenec@activeconstruction.com>; Naomi Lawrence <naomil@activeconstruction.com>; Jennifer
Smiley <Jennifer.Smiley@psomas.com>; Anne Carr <anne.carr@psomas.com>
Subject: EW-SRTS: DBE Acknowledgement Needed for Driveway D19
Wes,
Similar to CO-002, can you please reach out to Gilbert Patterson to gain email confirmation of their willingness to
complete the work required by FWD-021 (attached). That’s the one where we switched Driveway D19 from 4” HMA
to 6” Cement Concrete. Their portion of the work is specific to sheets 42, 92, and 94.
Exhibit A
City of East Wenatchee
Resolution 2025-16
3
A change order is required to document this work since it increases the work of the contract DBE. Therefore, this
work will be captured on CO-008. The work is already complete and was actually paid for in PE #12, we just need
to execute the CO now to document the quantity overrun.
Thank you.
Kyle Burtis, PE
Senior Project Engineer
D: 509-662-4068
C: 307-752-4162
5TH STREET NE
N
J
A
M
E
S
S
T
R
E
E
T
SITE PREPARATION NOTES
GENERAL SITE PREPARATION & TESC NOTES
LEGEND PLAN
DATENO.BY APPR.
DESIGNED BY
CHECKED BY
ENGINEERING MANAGER
PROJECT MANAGER
PROJECT ENGINEER
REVISIONS
DRAWN BY
DATE
FILENAME
19068SPN01.dwg
SHT OFKPG PROJECT No.
DATE
DATE
DATE
DATE
DATE
Approved By EAST WENATCHEE
SAFE ROUTES TO SCHOOL
STERLING INTERMEDIATE (SCH B)
D
Seattle Tacoma
Wenatchee
23 S. Wenatchee Avenue, Suite 223
Wenatchee, WA 98801 509.663.271
KPG.com 15319068A32
SITE PREPARATION AND TESC
5TH STREET NE
STA 415+50 TO STA END (SCH B)
3/2023JLF
3/2023
3/2023
MD
MD
5+5023ATC
IONS3ATC
KRB
KRB6
6
REVISED PAVEMENT REMOVAL LIM
VIEWPORT ADJUSTED FROM 6 TO (FWD-001)
(FWD-001)DCONFORMED
PLANS
JUNE 2023MARCH 2024
R
EGIST E R E D
NO
T
G
N
IHSAWFOETATS
ER
N E
P
R
F
O
E NNALIO
E
S IGS
66
N A N D E = MIL
L
E
R
8-2
1
-
2
0
2
4
O/
H
P
O/H P O/H P O/H P
O
/
H
P
O
/
H
P
O
/
H
P
O
/
H
P
O/H P
SSSSSS
W (ABAN)
W
(
A
B
A
N
)
420+50
1
MA
T
C
H
L
I
N
E
S
T
A
4
2
0
+
2
2
.
0
5
TH
I
S
S
H
E
E
T
MA
T
C
H
L
I
N
E
S
T
A
42
0
+
2
2
.
0
5
T
H
I
S
S
H
E
E
T
UK
W
N
(
A
B
A
N
)
U
K
W
N
(
A
B
A
N
)
UKWN UKWN
3 4/19/24 KRB KRB WATER MAIN STUB (FWD-013)
STA 419+72.10
5.50' RT
4/22/24 KRB KRB ELECTRICAL SERVICE "S3" CONDUIT REVISION (FWD-014)4
IRR
IR
R
S S
W W W
S
5 8/15/24 KRB KRB DRIVEWAY D18 & D19 REVISIONS (CO-008)
5
5
5
CO-008
CO-008
CO-008
Exhibit A
City of East Wenatchee
Resolution 2025-16
5TH ST NE
N
J
A
M
E
S
A
V
E
CONSTRUCTION NOTES
GENERAL NOTES
DESIGNED BY
CHECKED BY
ENGINEERING MANAGER
PROJECT MANAGER
PROJECT ENGINEER
DRAWN BY
DATE
FILENAME
19068ARDW01.dwg
SHT OFKPG PROJECT No.
DATE
DATE
DATE
DATE
DATE
Approved By EAST WENATCHEE
SAFE ROUTES TO SCHOOL
STERLING INTERMEDIATE (SCH B)
Seattle Tacoma
Wenatchee
23 S. Wenatchee Avenue, Suite 223
Wenatchee, WA 98801 509.663.2711
KPG.com 15319068A42
ROADWAY PLANS
5TH STREET NE
STA 415+50 TO STA END (SCH B)
3/2023JLF
3/2023
3/2023
MD
MD
PLAN
'ATENO.B< APPR.REVISIONS
(FWD-007)NM11
4/19/24 KRB KRB WATER MAIN STUB (FWD-013)12
4/22/24 KRB KRB ELECTRICAL SERVICE "S3" CONDUIT REVISION (FWD-014)13
14
14
14
R
EGIST E R E '
NO
T
G
N
IHSAWFOETATS
ER
N E
P
R
F
O
E NNALIO
E
S IGS
466
N A N 'E = MIL
L
E
R
8-2
1
-
2
0
2
4
11
T
CONFORMED
PLANS
JUNE 2023MARCH 2024
420+50
N (FWD-014)
N (FWD-014)
AND CURB & GUTTER REVISIONS (FWD-016)
14
14
8
S
8/15/24 KRB KRB DRIVEWAY D18 & D19 REVISIONS (CO-008)15
15
CO-008
Exhibit A
City of East Wenatchee
Resolution 2025-16
CONSTRUCTION NOTES
GENERAL NOTES
D17
5TH ST NE
D18
5TH ST NE
D19
5TH ST NE
DRIVEWAY PLAN LEGEND
DRIVEWAY PROFILE LEGEND
DRIVEWAY D17
DATENO.BY APPR.
DESIGNED BY
CHECKED BY
ENGINEERING MANAGER
PROJECT MANAGER
PROJECT ENGINEER
REVISIONS
DRAWN BY
DATE
FILENAME
19068DRVW01.dwg
SHT OFKPG PROJECT No.
DATE
DATE
DATE
DATE
DATE
Approved By EAST WENATCHEE
SAFE ROUTES TO SCHOOL
STERLING INTERMEDIATE (SCH B)
Seattle Tacoma
Wenatchee
23 S. Wenatchee Avenue, Suite 223
Wenatchee, WA 98801 509.663.2711
KPG.com 15319068A
DRIVEWAY PLAN AND PROFILES
5TH STREET NE (SCH. B)
DRIVEWAYS 17, 18, AND 19 (SCH B)
3/2023JLF
3/2023
3/2023
MD
MD
PLAN
DRIVEWAY D17
PROFILE
PLAN
DRIVEWAY D18
PLAN
DRIVEWAY D19
PROFILE PROFILE
92
DRIVEWAY D18 DRIVEWAY D19DRIVEWAY D19
(FWD-007)NM11
R
EGIST E R E D
NO
T
G
N
IHSAWFOETATS
ER
N E
P
R
F
O
E NNALIO
E
S IGS
99
N A N D E = MIL
L
E
R
8-2
1
-
2
0
2
4
CONFORMED
PLANS
MARCH 2024
17.0'
6.
0
0
f
t
0.50%
PV
I
S
T
A
=
0
+
4
4
.
5
5
EL
=
M
A
T
C
H
E
X
T
G
-10.22%
LOW POINT:
SLOPE TO DRAIN
20.0'
8/15/24 KRB KRB DRIVEWAY D18 & D19 REVISIONS (CO-008)12
12
12
CO-008
CO-008
Exhibit A
City of East Wenatchee
Resolution 2025-16
DRIVEWAY SCHEDULE
CEMENT CONC DRIVEWAY SECTION
HMA DRIVEWAY SECTION
ISOMETRIC VIEW
SECTION B-B
ISOMETRIC VIEW
SECTION B-B
CEMENT CONC. DRIVEWY ENTRANCE TYPE 3 MODIFIED (DEPRESSED)
CEMENT CONC. DRIVEWAY ENTRANCE TYPE 1 MODIFIED (DEPRESSED)
NOTES
DATENO.BY APPR.
DESIGNED BY
CHECKED BY
ENGINEERING MANAGER
PROJECT MANAGER
PROJECT ENGINEER
REVISIONS
DRAWN BY
DATE
FILENAME
19068DRVWDET01.dwg
SHT OFKPG PROJECT No.
DATE
DATE
DATE
DATE
DATE
Approved By EAST WENATCHEE
SAFE ROUTES TO SCHOOL
KENROY ELEMENTARY (SCH A)
T
Seattle Tacoma
Wenatchee
23 S. Wenatchee Avenue, Suite 223
Wenatchee, WA 98801 509.663.2711
KPG.com
MD
MD
3/2023
3/2023
JLF 3/2023
DRIVEWAY
SCHEDULE AND DETAILS
9419068A 153
CONFORMED
PLANS
JUNE 2023
R
EGIST E R E D
N
O
T
G
N
IHSAWFOETATS
ER
N E
P
R
F
O
E NNALIO
E
S IGS
46996
N A N D E Z MIL
L
E
R
8-2
1
-
2
0
2
4
3A 30 3 0
1 10/12/23 KRB KRB ADD DRIVEWAY D3A (FWD-003)
3/8"64-28
HMA5.5
MARCH 2024
30
22
26
3
2 8/14/24 KRB KRB DRIVEWAY D3 REVISIONS (FWD-020)
3 8/15/24 KRB KRB DRIVEWAY D18 & D19 REVISIONS (CO-008)
CO-008
Exhibit A
City of East Wenatchee
Resolution 2025-16
5TH ST NE
N
J
A
M
E
S
A
V
E
CONSTRUCTION NOTES
PLAN
15319068A125
LANDSCAPE AND RESTORATION PLAN
5TH STREET NE
STA 415+50 TO STA 420+00 (SCH B)
3/2023JLF
3/2023
3/2023
EG
EG
DATENO.BY APPR.
DESIGNED BY
CHECKED BY
ENGINEERING MANAGER
PROJECT MANAGER
PROJECT ENGINEER
REVISIONS
DRAWN BY
DATE
FILENAME
19068LSCP-RES01.dwg
SHT OFKPG PROJECT No.
DATE
DATE
DATE
DATE
DATE
Approved By EAST WENATCHEE
SAFE ROUTES TO SCHOOL
STERLING INTERMEDIATE (SCH B)
T
0 3 -1 5-2023
Seattle Tacoma
Wenatchee
23 S. Wenatchee Avenue, Suite 223
Wenatchee, WA 98801 509.663.2711
KPG.com
E L I Z A B E T H GIBS
O
N
N
O
. 538 EXP. 0 8 /1 6 /2 0 23
ST A T E O F W A SHI
N
G
T
O
N
L
A
N
D
S
CAP E A R C H I T E CT
SEE SHEET 127 FOR PLANT
SCHEDULE, DETAILS AND
GENERAL NOTES
LEGEND
CONFORMED
PLANS
JUNE 2023
128
W W W W W W W
4/22/24 KRB KRB ELECTRICAL SERVICE "S3" CONDUIT REVISION (FWD-014)1
MARCH 2024
W W W
2 8/15/24 KRB KRB DRIVEWAY D18 & D19 REVISIONS (CO-008)
2
2
CO-008
CO-008
Exhibit A
City of East Wenatchee
Resolution 2025-16
Resolution 2025-16, SRTS CO 6 7 and 8-
compressed
Final Audit Report 2025-03-07
Created:2025-03-07
By:City Clerk (cityclerk@eastwenatcheewa.gov)
Status:Signed
Transaction ID:CBJCHBCAABAA5SDYtVlw54fB6tj76CmOk8NPIKEycKtv
"Resolution 2025-16, SRTS CO 6 7 and 8-compressed" History
Document created by City Clerk (cityclerk@eastwenatcheewa.gov)
2025-03-07 - 0:39:11 AM GMT
Document emailed to jcrawford@eastwenatcheewa.gov for signature
2025-03-07 - 0:40:52 AM GMT
Email viewed by jcrawford@eastwenatcheewa.gov
2025-03-07 - 10:41:22 PM GMT
Signer jcrawford@eastwenatcheewa.gov entered name at signing as Jerrilea Crawford
2025-03-07 - 10:41:50 PM GMT
Document e-signed by Jerrilea Crawford (jcrawford@eastwenatcheewa.gov)
Signature Date: 2025-03-07 - 10:41:52 PM GMT - Time Source: server
Agreement completed.
2025-03-07 - 10:41:52 PM GMT