Loading...
HomeMy WebLinkAbout02-06-2024 2023 Rock Island Road Overlay Consultant Supplemental Agreement1 1/9/2024 1:46:53 PM J:\data\EW\23-0042\00 Contract\Amnd No. 1\Amnd No. 1_SOW_2023 Rock Island Rd Ovelay SDC.docx EXHIBIT B-1 Scope of Work Amendment No. 1 City of East Wenatchee 2023 Rock Island Road Overlay Services During Construction January 2024 Background The City of East Wenatchee (City) received funding from the Washington State Transportation Improvement Board (TIB) to complete pavement improvements on Rock Island Road between McGee Street SE and Grant Road. Through a competitive process, the City selected RH2 Engineering, Inc., (RH2) to provide engineering services to design the proposed intersection. Utilizing the design previously completed by RH2, this Scope of Work includes engineering services during construction tasks for the Rock Island Road Overlay project in East Wenatchee, Washington. It is assumed that no federal funds will be used in the design or construction of this project. Deliverables will be submitted in electronic format (PDF) unless otherwise noted. Task 5 –Services During Construction Objective:Provide construction contract administration and limited observation services for the Rock Island Road Overlay Improvements project. Construction contract administration services include time before and after construction is complete. Approach: Attend Pre-Construction Conference –Prepare for and provide an agenda and meeting minutes for the pre-construction conference. Attend the pre-construction conference, to be held at RH2’s East Wenatchee office, with the RH2 project manager and one (1)RH2 observer. Provide additional copies of the plans and specifications in accordance with the construction contract documents. Coordinate Unanticipated Discovery Plan (UDP)–Coordinate with Plateau Archaeology (Plateau) as a subconsultant to RH2 to prepare an UDP in accordance with the Washington State Department of Archaeology and Historical Preservation requirements. Coordinate Materials Testing –Coordinate with Construction Special Inspection (CSI) as a subconsultant to RH2 to facilitate testing of the concrete, asphalt, and earthwork items in accordance with the Washington State Department of Transportation (WSDOT)Standard Specifications for Road, Bridge, and Municipal Construction. Review Submittals –Prepare a Record of Materials (ROM) spreadsheet to track submittal reviews.Review certified payrolls.Review submittals for up to thirty (30) materials (Qualified Product Lists, Request(s) for Approval of Materials, manufacturer certificate of compliance, mix Original Page 2 of 6 Pages City of East Wenatchee Exhibit B-1 –Scope of Work 2023 Rock Island Road Overlay Amendment No. 1 2 1/9/2024 1:46:53 PM J:\data\EW\23-0042\00 Contract\Amnd No. 1\Amnd No. 1_SOW_2023 Rock Island Rd Ovelay SDC.docx designs, and shop drawings) in accordance with the project plans and specifications. Maintain the ROM on a weekly basis during construction. Provide Construction Observation Services –Provide one (1) part-time project observer for an average of two (2) hours per day throughout construction.Provide supplemental observation as requested to observe the contractor’s activities. Observation duties will include the following: a.Monitoring and documenting the construction contractor’s operations through reports and photographs of the construction progress. b.Collecting item quantity tickets and measurements of items to be used in preparing the pay estimates. c.Addressing technical issues and questions onsite. d.Collecting and maintaining records for utilities, earthwork, surfacing, concrete, asphalt, and traffic control items. Maintaining the project ledger for payment of construction contract items. e.Provide on-site coordination with utility purveyors. Respond to Questions and Attend Meetings –Attend weekly site visits by the RH2 project manager, or as requested, to participate in project meetings and/or address technical issues and respond to construction contractor questions that cannot be addressed in the field by the observer. Prepare a weekly statement of working days. Prepare Progress Payments –Prepare two (2) pay estimates based on quantities provided by the observer. Review Change Orders –Review and prepare up to two (2) change orders for City and TIB approval. Provide Project Closeout –Organize and maintain project records for closeout. Prepare letters as required for substantial completion, physical completion, and project completion. Provide Project Management Services –Review invoices and budget throughout the construction phase of the project. Communicate observed status of construction and budget with the City on a monthly basis. Coordinate with City staff and contractor, and administer request for sublets, lower tier subcontractor certification, and statements of intent. Set up RH2’s construction files.Track, assemble, file, and maintain construction documentation. Coordinate with outside utilities and agencies, including the City, the contractor,WSDOT,Public Utility District of Chelan County,Ziply, Charter, Cascade Natural Gas, Link Transit, and Chelan County Fire District. Assist City staff with public outreach and business coordination by responding to questions during construction.It is anticipated RH2 will respond to questions from the business community by phone or email. Original Page 3 of 6 Pages City of East Wenatchee Exhibit B-1 –Scope of Work 2023 Rock Island Road Overlay Amendment No. 1 3 1/9/2024 1:46:53 PM J:\data\EW\23-0042\00 Contract\Amnd No. 1\Amnd No. 1_SOW_2023 Rock Island Rd Ovelay SDC.docx Assumptions: The construction phase of the project will last thirty (30) working days. RH2 will perform services during construction up the level included in the attached Fee Estimate. Additional effort, if needed, will be mutually determined by the City and RH2. RH2 is not responsible for site safety, for directing the contractor or others in their work, or for determining means and methods. RH2 Deliverables: Pre-construction meeting agenda and minutes (fifteen (15) hard copies). Construction plans and specifications (three (3) hard copies of half-size plans and specifications). UDP document. Submittal reviews. ROM tracking. Part-time construction observation. Construction observation reports and photos. Responses to technical questions. Weekly statement of working days. Four (4) pay estimates. Two (2) change orders. Letters of substantial completion, physical completion, and project completion. Project records. Monthly invoices. Project Schedule Construction of the project is scheduled to begin in the spring of 2024 and continue for forty (40)working days. Closeout of the project is currently anticipated in the summer of 2024. Original Page 4 of 6 Pages EXHIBIT D-1 Fee Estimate City of East Wenatchee 2023 Rock Island Road Overlay Jan-24 Description Principal Project Manager Project Engineer Project Accounting Administrative Support Total Hours Total Labor Total Subconsultant Total Expense Total Cost Task 5 Services During Construction 20 68 94 1 1 184 40,868$ 2,944$ 1,188$ 45,000$ 5.1 Attend pre-construction conference 2 4 2 -8 1,900$ -$ 214$ 2,114$ 5.2 Prepare Unanticipated Discovery Plan -1 --1 237$ 575$ 6$ 818$ 5.3 Coordinate materials testing -2 --2 474$ 2,369$ 12$ 2,855$ 5.4 Review submittals -5 14 -19 4,013$ -$ 100$ 4,113$ 5.5 Provide construction observation 8 10 70 -88 18,702$ -$ 468$ 19,170$ 5.6 Respond to questions and attend meetings 4 16 --20 4,888$ -$ 122$ 5,010$ 5.7 Prepare pay estimates -8 --8 1,896$ -$ 47$ 1,943$ 5.8 Review change orders 2 6 --8 1,970$ -$ 49$ 2,019$ 5.9 Provide project closeout 2 8 8 -18 4,060$ -$ 102$ 4,162$ 5.10 Provide project management services 2 8 -1 1 12 2,728$ -$ 68$ 2,796$ PROJECT TOTAL 20 68 94 1 1 184 40,868$ 2,944$ 1,188$ 45,000$ J:\data\EW\23-0042\00 Contract\Amnd No. 1\Amnd No. 1_FEE_2023 Rock Island Rd Ovelay SDC.xlsm 1/16/2024 11:37 AM Original Page 5 of 6 Pages RATE LIST RATE UNIT Professional I $166 $/hr Professional II $182 $/hr Professional III $202 $/hr Professional IV $223 $/hr Professional V $237 $/hr Professional VI $256 $/hr Professional VII $274 $/hr Professional VIII $285 $/hr Professional IX $303 $/hr Technician I $129 $/hr Technician II $142 $/hr Technician III $160 $/hr Technician IV $174 $/hr Technician V $191 $/hr Technician VI $209 $/hr Technician VII $227 $/hr Technician VIII $237 $/hr Administrative I $86 $/hr Administrative II $101 $/hr Administrative III $118 $/hr Administrative IV $141 $/hr Administrative V $166 $/hr CAD/GIS System $27.50 $/hr CAD Plots - Half Size $2.50 price per plot CAD Plots - Full Size $10.00 price per plot CAD Plots - Large $25.00 price per plot Copies (bw) 8.5" X 11"$0.09 price per copy Copies (bw) 8.5" X 14"$0.14 price per copy Copies (bw) 11" X 17"$0.20 price per copy Copies (color) 8.5" X 11"$0.90 price per copy Copies (color) 8.5" X 14"$1.20 price per copy Copies (color) 11" X 17"$2.00 price per copy Technology Charge 2.50%% of Direct Labor Night Work 10.00%% of Direct Labor Mileage $0.6700 price per mile (or Current IRS Rate) Subconsultants 15%Cost + Outside Services at cost EXHIBIT D-1 continued RH2 ENGINEERING, INC. 2024 SCHEDULE OF RATES AND CHARGES Rates listed are adjusted annually. Original Page 6 of 6 Pages