Loading...
HomeMy WebLinkAboutResolution 2024-04, East Wenatchee Water District ILA - Rock Island Overlay ProjectCity of East Wenatchee Resolution 2024-04 with Exhibit A Retain Resolution until no longer needed for City -business, then transfer to Washington State Archives (GS50-05A-16 Rev. 1) Page 1 of 2 City of East Wenatchee, Washington Resolution No. 2024-04 A Resolution of the City of East Wenatchee, Washington authorizing the Mayor to execute an Interlocal Agreement between the City of East Wenatchee and the East Wenatchee Water District for utility work on the Rock Island Road Overlay Project. 1.Alternate format. 1.1. Para leer este documento en otro formato (español, Braille, leer en voz alta, etc.), póngase en contacto con la administradora municipal alternateformat@eastwenatcheewa.gov, al (509) 884-9515 o al 711 (TTY). 1.2. To read this document in an alternate format (Spanish, Braille, read aloud, etc.), please contact the City Clerk at alternateformat@eastwenatcheewa.gov, at (509) 884-9515, or at 711 (TTY). 2.Authority. 2.1. RCW 35A.11.020 and RCW 35A.12.190 authorize the City Council to organize and regulate its internal affairs and to define the powers, functions and duties of its officers and employees. THE CITY COUNCIL OF THE CITY OF EAST WENATCHEE DO RESOLVE AS FOLLOWS: 3.Authorization. The City Council authorizes the Mayor to execute an Interlocal Agreement that conforms to the language set forth in Exhibit A. 4.Severability. If a court of competent jurisdiction declares any provision in this resolution to be contrary to law, such declaration shall not affect the validity of the other provisions of this Resolution. 5.Effective date. This Resolution becomes effective immediately. 1 Filed for and Return to: Laura Leon, City Clerk City of East Wenatchee 271 9th Street NE East Wenatchee, WA 98802 The information contained in this boxed section is for recording purposes only pursuant to RCW 36.18 and RCW 65.04, and is not to be relied upon for any other purpose, and shall not affect the intent of any warranty contained in the document itself. Document Title: Interlocal Cooperation Agreement Between the City of East Wenatchee and the East Wenatchee Water District for Utility Work, and Roadway improvements associated with the East Wenatchee Rock Island Road Overlay Project (2023-01) Grantor(s): City of East Wenatchee and East Wenatchee Water District Grantee(s): City of East Wenatchee and East Wenatchee Water District Reference Number(s) of Document Related, Assigned or Released: N/A Abbreviated Legal Description: N/A Complete or Additional Legal Description on page of Document – N/A Assessor’s Parcel Number: N/A Filed with the Auditor pursuant to RCW 39.34.040 Interlocal Cooperation Agreement Between the City of East Wenatchee and the East Wenatchee Water District for Utility Work, and Roadway Improvements Associated with the East Wenatchee Rock Island Road Overlay Project (2023-01) THIS INTERLOCAL COOPERATION AGREEMENT ("Agreement") is hereby entered into this date by and between EAST WENATCHEE WATER DISTRICT (the "District"), and the CITY OF EAST WENATCHEE (the "City"), collectively referred to as the "Parties." RECITALS: 1. The City is engaged in a road improvement project involving Rock Island Road, East Wenatchee, Douglas County, Washington (the "Project"); and, 2. In order to continue providing water service to a portion of its service area, the District desires to replace the water main and service connections within the Project; and, 3. The City and the District desire to cooperate in the replacement and adjustment of utilities during the construction of the Project; NOW, THEREFORE, in consideration of the foregoing, the City and the District agree as follows: 1. Purpose. The purpose of this Agreement is to provide for the construction of the water main, and services in the Project concurrent with other construction improvements. 2. Scope of Work. A cost estimate containing a preliminary list of construction bid items associated with the Water District work is set forth in Exhibit A. The estimate contains approximate contributions from the EWWD, but the final contribution amount will be based on final bid prices. 3. District's Obligations. The District shall: 3.1 Provide design services for the District’s portion of the work and coordinate with the City’s consulting engineer to incorporate the design into the Project’s bid documents. Exhibit A City of East Wenatchee Resolution 2024-04 2 3.2 Review the engineering design on plan and profile sheets provided by the City's consultant. 3.3 Review Special Provisions of the bid documents for the District’s facilities within the Project, also to be furnished by the City's consultant. 3.4 Approve 100% Plans, Specifications and Estimate (PS & E) package for bid advertisement. 3.5 Provide any additional field engineering, including survey control and construction staking for the construction of the District’s improvements, except for services that are provided for by the contractor in the contract. 3.6 Provide construction observation, material testing, and field testing services, for the construction of the District’s improvements. 3.7 Provide for reimbursement of any and all costs approved by the District and incurred by the City associated with the construction of the District’s improvements, including: (a) Construction of all of the District’s related improvements, (b) Processing of change orders requested by the District. (c) All District work described in approved PS&E package. Associated costs are described in Exhibit A 3.8 Be responsible for its staff coordination with the City and its consultant. 4. City's Obligations. The City shall: 4.1 Incorporate the engineering design and specifications for the District’s improvements in the City's roadway construction plans for the Project. 4.2 Administer the bidding and contract award for the Project, including: (a) Preparing bid documents to require that costs associated with the District’s portion of the Project be separately itemized in the bid submittal; (b) Advertising for construction bids; and (c) Awarding of the construction contract to the lowest responsible bidder based on the lowest total submitted for all schedules of work. 4.3 Administer the construction contract, including: (a) Preparation and delivery of Notice of Award and Notice to Proceed to the contractor; (b) Scheduling the construction work with the contractor; (c) Disbursement of payments to the roadway contractor; and (d) Administration of change orders, although the District shall have final authority for review and approval of any change order that affects the District’s improvements; and Exhibit A City of East Wenatchee Resolution 2024-04 3 (e) Contract closeout. 4.4 Be responsible for the administration, management, and budget for this Project. 4.5 The City agrees that the District reserves the right to inspect and approve all work done on the District’s system prior to the District being obligated to pay the City its costs for such work. 5. Unexpected Changes. The District and the City recognize that unanticipated or unexpected changes to the project plans may be necessary as the project develops. The District and the City will cooperate to address any unanticipated or unexpected circumstances that may require a change in the design or construction of the Project and/or that may require additional expenditures beyond those budgeted. The District in the City will further cooperate in the allocation of any such additional costs with consideration of the party (if any) responsible for the cost and the extent to which the changes benefit the District or the City. 6. Duration and Termination. This Agreement shall become effective upon the filing of the executed Agreement with the Douglas County Auditor pursuant to RCW 39.34.040. This agreement will terminate when the Project is completed and when the final payment for the District’s portion of the Project is received by the City from the District. 7. Payment by District to City. The District shall pay the City for the District’s related portion of the project. As set forth in Exhibit A, the District shall pay the City 100% of the amount of the actual cost to construct the items shown in the District’s portion of the bid schedule, \ including Washington State Sales Tax. In the event a change order requested by the District related specifically to work of benefit to the District only occurs, the District shall pay all of the costs of any such change order. The District shall make periodic progress payments to the City. Each progress payment, subject to the terms of this agreement, and the final payment are due within 45 days of the date the payment request is mailed by the City to the District. Any payment past due shall accrue interest at the rate of twelve (12%) per cent per annum until the entire outstanding balance of the past due principal and interest is paid. 8. Records. The City shall keep and maintain accurate and complete cost records pertaining to the Project and this Agreement. The District shall have full access and the right to examine any such records during the term of this Agreement. All records, books, documents and other materials maintained, prepared, or issued by the District in the implementation of this Agreement shall be the property of the District, which shall have the responsibility of the retention and release of those materials. 9. Mutual Indemnity. The District shall indemnify, defend and hold harmless the City, its officers, agents and employees, from and against any and all claims, losses or liability, or any portion thereof, arising from injury or death to persons or damage to property occasioned by a ny negligent act, omission or failure of the District, its officers, agents, and employees, in connection with the work described in this agreement, or arising out of the District's non-observance or non- performance of any law, ordinance, or regulation applicable to the District’s portion of the Project. The City shall indemnify, defend and hold harmless the District, its officers, agents and employees, from and against any and all claims, losses or liability, or any portion thereof, arising from injury or death to persons or damage to property occasioned by any negligent act, omission or failure of the City, its officers, agents and employees, in connection with the work described in this Exhibit A City of East Wenatchee Resolution 2024-04 4 agreement, or arising out of the City's non-observance or non-performance of any law, ordinance or regulation applicable to the District’s portion of the Project. 10. Severability. In the event that any provision of this Agreement shall be determined to be unenforceable or otherwise invalid for any reason, such provision shall be enforced and validated to the extent permitted by law. All other provisions of this Agreement are severable, and the unenforceability or invalidity of any single provision hereof shall not affect the remaining provisions. 11. Construction. This agreement contains the entire agreement between the Parties with respect to the subject matter hereof and supersedes all prior agreements or understandings among the Parties with respect thereto. This Agreement may be amended only by an agreemen t in writing signed by the Parties. 12. Mutual Negotiation and Construction. This Agreement and each of the terms and provisions hereof are deemed to have been explicitly negotiated between, and mutually drafted by, the Parties, and the language in all parts of this Agreement shall, in all cases, be construed according to its fair meaning and not strictly for or against either Party. 13. Governing Law; Venue. This Agreement is governed by the laws of the state of Washington, without regard to its conflict of law provisions. The jurisdiction of any action hereunder shall be in the Superior Court, Douglas County, Washington. INWITNESS WHEREOF, the parties hereto have executed this Agreement on this __________ day of ________________ , 2023. EAST WENATCHEE WATER DISTRICT CITY OF EAST WENATCHEE ___________________________________ _____________________________ Vince Johnston, Manager Jerrilea Crawford, Mayor Attest: ______________________________ Laura Leon, City Clerk Exhibit A City of East Wenatchee Resolution 2024-04 5 EXHIBIT A – Cost Estimate See attached Bid Tabulations. Exhibit A City of East Wenatchee Resolution 2024-04 Item Number Spec. Reference Total Quantity Unit Item Bid Schedule A City/TIB Bid Schedule B EWWD Bid Schedule A Unit Cost Bid Schedule B Unit Cost Bid Schedule A Extended Cost Bid Schedule B Extended Cost 1-07.2(1)1-07.2(2) PREPARATION 1 1-09.7 1 L.S.MOBILIZATION L.S.L.S.28,000.00$ 42,000.00$ 28,000.00$ 42,000.00$ 2 2-02.5 1 L.S.REMOVAL OF STRUCTURES AND OBSTRUCTION L.S.L.S.6,000.00$ 5,000.00$ 6,000.00$ 5,000.00$ 3 2-02.5 110 S.Y.REMOVING CEMENT CONCRETE ROADWAY 10 100 100.00$ 150.00$ 1,000.00$ 15,000.00$ 4 5-04.5 6400 S.Y.PLANING BITUMINOUS PAVEMENT 6400 6.00$ -$ 38,400.00$ -$ 9,600.00$ 5 7-08.5 40 EA.UTILITY POTHOLE 40 -$ 600.00$ -$ 24,000.00$ DRAINAGE 6 7-04.5 4 L.F.SOLID WALL PVC STORM SEWER PIPE 8 IN. DIAM 4 70.00$ 280.00$ -$ 7 7-05.5 1 EA.CATCH BASIN TYPE 1 1 3,000.00$ 3,000.00$ -$ WATER 8 7-14.5 2 EA.HYDRANT ASSEMBLY 2 -$ 5,000.00$ -$ 10,000.00$ 9 7-09.5 34 L.F.DUCTILE IRON PIPE FOR WATER MAIN 6 IN. DIAM.34 -$ 70.00$ -$ 2,380.00$ 10 7-09.5 87 L.F.DUCTILE IRON PIPE FOR WATER MAIN 8 IN. DIAM.87 -$ 70.00$ -$ 6,090.00$ 11 7-09.5 21 L.F.DUCTILE IRON PIPE FOR WATER MAIN 10 IN. DIAM.21 -$ 80.00$ -$ 1,680.00$ 12 7-09.5 1176 L.F.DUCTILE IRON PIPE FOR WATER MAIN 12 IN. DIAM.1176 -$ 90.00$ -$ 105,840.00$ 13 7-08.5 80 L.F.CASING SLEEVE FOR 12 IN. WATER MAIN 80 -$ 100.00$ -$ 8,000.00$ 14 7-12.5 1 EA.COMB. AIR RELEASE/AIR VACUUM VALVE ASSEMBLY 2 IN.1 -$ 7,000.00$ -$ 7,000.00$ 15 7-12.5 1 EA.GATE VALVE 8 IN. DIAM.1 -$ 2,000.00$ -$ 2,000.00$ 16 7-12.5 9 EA.GATE VALVE 12 IN. DIAM.9 -$ 3,000.00$ -$ 27,000.00$ 17 7-09.5 1 L.S.CONNECTION TO EXISTING - GRANT ROAD L.S.-$ 2,750.00$ -$ 2,750.00$ 18 7-09.5 1 L.S.CONNECTION TO EXISTING - SIMON ST SE NORTH L.S.-$ 2,000.00$ -$ 2,000.00$ 19 7-09.5 1 L.S.CONNECTION TO EXISTING - 1ST ST SE L.S.-$ 3,000.00$ -$ 3,000.00$ 20 7-09.5 1 L.S.CONNECTION TO EXISTING - 10" DI WATER MAIN L.S.-$ 2,000.00$ -$ 2,000.00$ 21 7-09.5 1 L.S.CONNECTION TO EXISTING - MCGEE STREET L.S.-$ 2,000.00$ -$ 2,000.00$ 22 7-15.5 6 EA.SERVICE CONNECTION 2 IN. DIAM. WITH 5/8 X 3/4 IN. SETTER 6 -$ 4,500.00$ -$ 27,000.00$ 23 7-15.5 1 EA.SERVICE CONNECTION 2 IN. DIAM. WITH 2 IN. SETTER 1 -$ 4,500.00$ -$ 4,500.00$ 24 7-15.5 1 EA.DOUBLE SERVICE CONNECTION 2 IN. DIAM. WITH 5/8 X 3/4 IN. SETTERS 1 -$ 4,500.00$ -$ 4,500.00$ 25 7-15.5 1 EA.DOUBLE SERVICE CONNECTION 2 IN. DIAM. WITH 2 IN. SETTERS 1 -$ 4,500.00$ -$ 4,500.00$ 26 7-12.5 1 L.S.BACKFLOW PREVENTION ASSEMBLY 1 -$ 15,000.00$ -$ 15,000.00$ 27 7-15.5 1 EA.RECONNECT EXISTING SERVICE CONNECTION 1 -$ 1,500.00$ -$ 1,500.00$ 28 7-08.5 2 EA.REPAIR EXISTING SIDE SEWER 2 -$ 1,000.00$ -$ 2,000.00$ 29 7-09.5 1700 TON BANK RUN GRAVEL FOR TRENCH BACKFILL 1700 -$ 50.00$ -$ 85,000.00$ 30 7-09.5 1 L.S.ABANDONMENT / REMOVAL OF TERMINATED WATER FACILITIES L.S.-$ 2,500.00$ -$ 2,500.00$ SURFACING/PAVING 31 4-04.5 650 TON CRUSHED SURFACING BASE COURSE 120 530 60.00$ 100.00$ 7,200.00$ 53,000.00$ 32 4-04.5 190 TON CRUSHED SURFACING TOP COURSE 60 130 80.00$ 120.00$ 4,800.00$ 15,600.00$ 33 5-04.5 790 TON HMA CL. 3/8" PG 64H-28 790 150.00$ -$ 118,500.00$ -$ 29,625.00$ 34 5-04.5 150 TON COMMERCIAL HMA 20 130 350.00$ 350.00$ 7,000.00$ 45,500.00$ 35 4-04.5 40 TON PERMEABLE BALLAST 40 100.00$ 500.00$ 4,000.00$ GRADING 36 2-03.5 120 C.Y.ROADWAY EXCAVATION INCL. HAUL 120 45.00$ -$ 5,400.00$ -$ 37 2-03.5 10 C.Y.EMBANKMENT COMPACTION 10 25.00$ -$ 250.00$ -$ 38 7-09.5 25 C.Y.ROCK EXCAVATION 5 20 100.00$ 500.00$ 500.00$ 10,000.00$ EROSION CONTROL AND PLANTING 39 8-01.5 1 L.S.EROSION CONTROL AND WATER POLLUTION PREVENTION L.S.L.S.2,500.00$ 500.00$ 2,500.00$ 500.00$ 40 8-01.5 14 EA.INLET PROTECTION 14 100.00$ -$ 1,400.00$ -$ TRAFFIC 41 8-04.5 490 L.F.CEMENT CONC. TRAFFIC CURB AND GUTTER 350 140 40.00$ 100.00$ 14,000.00$ 14,000.00$ 42 8-22.5 60 L.F.PLASTIC STOP LINE 60 35.00$ -$ 2,100.00$ -$ 43 8-22.5 352 S.F.PLASTIC CROSSWALK LINE 352 30.00$ -$ 10,560.00$ -$ 44 8-22.5 3450 L.F.PAINT LINE 3450 2.00$ -$ 6,900.00$ -$ 45 8-22.5 380 L.F.PAINTED WIDE LANE LINE 380 4.00$ -$ 1,520.00$ -$ 46 8-22.5 22 EA.PLASTIC TRAFFIC ARROW 22 300.00$ -$ 6,600.00$ -$ 47 1-10.5 1 L.S.PROJECT TEMPORARY TRAFFIC CONTROL L.S.66,000.00$ -$ 66,000.00$ -$ 16,500.00$ OTHER ITEMS 48 8-14.5 4 EA.CEMENT CONC. CURB RAMP TYPE SINGLE DIRECTION A 4 4,500.00$ -$ 18,000.00$ -$ 49 8-14.5 1 EA.CEMENT CONC. CURB RAMP TYPE SINGLE DIRECTION B 1 4,950.00$ -$ 4,950.00$ -$ 50 8-06.5 18 S.Y.CEMENT CONC. DRIVEWAY ENTRANCE TYPE 1 18 -$ 200.00$ -$ 3,600.00$ 51 8-14.5 180 S.Y.CEMENT CONC. SIDEWALK 120 60 55.00$ 100.00$ 6,600.00$ 6,000.00$ 52 7-12.5 2 EA.LOWER WATER VALVE BOX 2 250.00$ -$ 500.00$ -$ 125.00$ 53 7-05.5 8 EA.LOWER MANHOLE 8 300.00$ -$ 2,400.00$ -$ 54 8-13.5 4 EA.LOWER MONUMENT CASE AND COVER 4 750.00$ -$ 3,000.00$ -$ 55 7-05.5 3 EA.LOWER CLEANOUT 3 300.00$ -$ 900.00$ -$ 56 7-12.5 2 EA.RAISE WATER VALVE BOX 2 1,270.00$ -$ 2,540.00$ -$ 635.00$ 57 7-05.5 4 EA.ADJUST CATCH BASIN 4 650.00$ -$ 2,600.00$ -$ 58 7-05.5 8 EA.RAISE MANHOLE 8 650.00$ -$ 5,200.00$ -$ 59 8-13.5 4 EA.RAISE MONUMENT CASE AND COVER 4 750.00$ -$ 3,000.00$ -$ 60 7-05.5 3 EA.RAISE CLEANOUT 3 500.00$ -$ 1,500.00$ -$ 61 1-05.4 1 L.S.ROADWAY SURVEYING L.S.L.S.5,000.00$ 8,000.00$ 5,000.00$ 8,000.00$ 62 1-07.16(4)1400 DOL ARCHAEOLOGICAL AND HISTORICAL SALVAGE 400 1000 1.00$ 1.00$ 400.00$ 1,000.00$ 63 2-09.5 1 L.S.SHORING OR EXTRA EXCAVATION CLASS B L.S.L.S.1,000.00$ 1,000.00$ 1,000.00$ 1,000.00$ 64 1-05.18 1 L.S.RECORD DRAWINGS (MINIMUM BID $1,000)L.S.1,000.00$ -$ 1,000.00$ 65 1-09.6 22000 DOL UNKNOWN UTILITY REPAIR 12000 10000 1.00$ 1.00$ 12,000.00$ 10,000.00$ 66 1-09.6 4500 DOL ROADSIDE CLEANUP 4500 1.00$ -$ 4,500.00$ -$ 410,000.00$ 583,440.00$ 56,485.00$ EWWD Overlay Contribution 49,592.40$ 410,000.00$ 633,032.40$ Construction Subtotal WA State Sales Tax Tax Schedule - See specification section Rock Island Road Overlay 2023 Extended Construction Cost Exhibit A City of East Wenatchee Resolution 2024-04