HomeMy WebLinkAboutRes 2023-55, Fee Schedule amendment for Fire MarshallCity of East Wenatchee Resolution No. 2023-55 with Exhibit A
Retain Resolution until no longer needed for City-business, then transfer to Washington State Archives (GS50-05A-
16 Rev. 1).
Page 1 of 3
City of East Wenatchee, Washington
Resolution No. 2023-55
A Resolution of the City of East Wenatchee, Washington, adopting an amended
Development Application Permit Processing Cost Recovery Schedule, Repealing
Resolution 2023-36, and establishing an effective date.
1.Alternate format.
1.1. Para leer este documento en otro formato (español, Braille, leer en voz alta, etc.),
póngase en contacto con la administradora municipal al alternateformat@
eastwenatcheewa.gov, al (509) 884-9515 o al 711 (TTY).
1.2. To read this document in an alternate format (Spanish, Braille, read aloud, etc.), please
contact the City Clerk at alternateformat@ eastwenatcheewa.gov, at (509) 884-9515,
or at 711 (TTY).
2.Authority.
2.1. The City of East Wenatchee is a non-charter code City duly incorporated and operating
under the laws of the State of Washington.
2.2. RCW 35.11.020 and RCW 35A.12.190 authorize the City of East Wenatchee (“City
Council”) to organize and regulate its internal affairs.
2.3. RCW 82.02.020 authorizes the City of East Wenatchee (“City”) to collect reasonable
fees from an application for a permit or other governmental approval to cover the cost
to the City of processing applications, inspecting and reviewing plans, or preparing
detailed Statements.
3.Recitals.
3.1. The City charges fees for services it provides for the development of land and
construction of structure. These services include reviewing permit applications, issuing
permits, conducting field inspections, etcetera.
3.2. The City and the Wenatchee Valley Fire Authority met to review fire marshal fees as
part of the process to update the interlocal agreements for fire protection and fire
marshal services within the city.
3.3. The City Council finds that it is in the best interests of the city and its citizens to
increase the amount of fees charged and the types of fees charged by the City to
recover the costs associated with fire marshal providing development review and
inspection services on projects located within the city limits.
THE CITY COUNCIL OF THE CITY OF EAST WENATCHEE DO RESOLVE AS FOLLOWS:
Section 1: Purpose. To update fees for the review of development applications and
inspection of construction projects by the East Wenatchee Fire Marshall.
Section 2: Repeal. This resolution repeals Resolution 2023-36.
Section 3: Amount of Fees. The city adopts the fees listed on the Development Application
Permit Processing Cost Recovery Schedule as set forth in Exhibit A.
Section 4: Annual Adjustment of Fees in Cost Recovery Schedule. Commencing January 1,
2025, and for each year thereafter, the fees will increase by 100 percent of the
change in the Consumer Price Index for West Urban Region for Urban Wage
Earners and Clerical Workers, all items (Revised Series) (CPI-W 1982-1984)
prepared by the United States Department of Labor, Bureau of Labor Statistics,
or a replacement index (the ‘CPI Index”). Calculation of the annual adjustment
will be from September to September of the preceding twelve months.
Section 5: Severability. If a court of competent jurisdiction declares any provision in this
resolution to be contrary to law, such declaration shall not affect the validity of
the other provisions of this Resolution.
Section 6: Recording Instructions. The City Council directs the City Clerk to record a copy
of this Resolution with the Douglas County Auditor.
Section 7: Effective Date. This resolution becomes effective once a copy of this Resolution
is recorded with the Douglas County Auditor or January 1, 2024 whichever is
later.
City of East Wenatchee
Effective January 1, 2024
Development Application Permit Processing Cost Recovery Schedule
All permit processing fees must be submitted as part of the required application materials. All fee
are non-refundable except when an application has officially been withdrawn in writing by the
applicant prior to the issuance of any public notice required for the proposal.
In addition to the fees included here, all projects require reimbursement to the City for the full cost
of contracted engineering services to review the project.
Pre-Application Conference 1st No Fee
2nd Pre-Application Conference on same project $194
Major Plat - Preliminary Review - Base Fee $1,109
Plus this fee per lot $79
Engineering $385
Plus this fee per lot $30
Major Plat - Final Review -
The Greater of the Minimum Base or Base + Per Lot Fee
Minimum Base $516
Base Fee $194
Plus this fee per lot $68
Engineering $539
Plus this fee per lot $30
Amendment/Alteration - Plat
Administrative $457
If Public Hearing Required $1,559
Short Plat - Preliminary Review - Base Fee $701
Plus this fee per lot $79
Engineering $231
Plus this fee per lot $30
Short Plat - Final Review - Base Fee $293
Plus this fee per lot $50
Engineering $308
Plus this fee per lot $30
Amendment/Alteration - Short Plat - Base Fee $457
Plus this fee per lot $79
Binding Site Plan - Preliminary Review - Base Fee $827
Plus this fee per lot $79
Engineering $308
Plus this fee per lot $30
Binding Site Plan - Final Review - Base Fee $827
Plus this fee per lot $79
Engineering $385
Plus this fee per lot $30
Binding Site Plan Condo in Existing Bldg $584
Amendment or Alteration - Binding Site Plan $350
Plus this fee per lot - If lots are added $79
Engineering $308
Plus this fee per lot $30
Extension - Plat, Short Plat, Binding Site Plan 1/2 Original Fee
Boundary Line Adjustment $293
Exhibit A
Rezone $1,752
Planned Unit Development $1,752
Conditional Use Permit $1,168
Home Occupation - Administrative $146
Critical Areas Permits/Compliance/Reasonable Use etc. $487
Variance $1,559
Appeals $973
Addressing (per request or plat/BSP/short plat) $146
Comprehensive Plan Amendment $1,947
Zoning Text Amendment $1,947
Shoreline Permits (SDP, SCUP, SVariance) $1,947
SEPA checklist review & DNS
With Notice $584
Without Notice $293
EIS - minimum base fee + the actual expenses $973
Mitigated DNS, Expanded Checklist $584
WCF - Broadcast and relay tower facility $1,196
WCF - Up to 5 small cell or DAS facilities $598
Each Additional Facility $119
WCF - Other wireless communications facilities application $598
Fire Marshal Services
Residential fire sprinkler plan review $115
Residential fire sprinkler inspection $115
Fire alarm & smoke detection system plan review $231
+ per device fee $2
Fire alarm & smoke detection system inspection $231
+ per device fee $3
Fire sprinkler system plan review $231
+ per device fee $3
Fire sprinkler system inspection $115230
+ per device fee $3
Commercial IFC application plan review
Per Building Permit $385
If Single Component $115
Commercial IFC component inspection
(Commercial hood, high-piled storage, membrane structures, fireworks stands,
fireworks displays, exhibitions, fire and sprinkler system revisions less than 5
devices, and standpipes.)
$115230
Commercial fuel tanks (per tank)
500 gallons or less $231
501 to 5000 gallons $462
5001 gallons or more $693
Marijuana Extraction System
$231
Residential or commercial tank decommission $115230
Development permit review $115
Reinspection fee $115
Exhibit A