Loading...
HomeMy WebLinkAbout2023-36, amending the Development Application Permit Processing Cost Recovery ScheduleCity of East Wenatchee Resolution No. 2023-36 with Exhibit A Retain Resolution until no longer needed for City-business, then transfer to Washington State Archives (GS50-05A- 16 Rev. 1). Page 1 of 2 City of East Wenatchee, Washington Resolution No. 2023-36 A Resolution of the City of East Wenatchee, Washington, adopting an amended Development Application Permit Processing Cost Recovery Schedule, Repealing Resolution 2014-12, and establishing an effective date. 1.Alternate format. 1.1. Para leer este documento en otro formato (español, Braille, leer en voz alta, etc.), póngase en contacto con el vendedor de la ciudad al alternateformat@east-wenatchee.com, al (509) 884-9515 o al 711 (TTY). 1.2. To read this document in an alternate format (Spanish, Braille, read aloud, etc.), please contact the City Clerk at alternateformat@east-wenatchee.com, at (509) 884-9515, or at 711 (TTY). 2.Authority. 2.1. The City of East Wenatchee is a non-charter code City duly incorporated and operating under the laws of the State of Washington. 2.2. RCW 35.11.020 and RCW 35A.12.190 authorize the City of East Wenatchee (“City Council”) to organize and regulate its internal affairs. 2.3. RCW 82.02.020 authorizes the City of East Wenatchee (“City”) to collect reasonable fees from an application for a permit or other governmental approval to cover the cost to the City of processing applications, inspecting and reviewing plans, or preparing detailed Statements. 3.Recitals. 3.1. The City charges fees for services it provides for the development of land and construction of structure. These services include reviewing permit application, issuing permits, conducting field inspections, etcetera. 3.2. On February 21, 2023, the City Council adopted Ordinance 2023-05 establishing a Multifamily Tax Exemption Program. THE CITY COUNCIL OF THE CITY OF EAST WENATCHEE DO RESOLVE AS FOLLOWS: Section 1: Purpose. To establish fees for the processing of Multifamily Tax Exemption applications. Section 2: Repeal. This resolution repeals Resolution 2014-12. Section 3: Amount of Fees. The city adopts the fees listed on the Development Application Permit Processing Cost Recovery Schedule as set forth in Exhibit A. EXHIBIT A  City of East Wenatchee  Effective per Res 2023‐36Effective January 1, 2023  Development Application Permit Processing Cost Recovery Schedule  All permit processing fees must be submitted as part of the required application materials. All fee  are non‐refundable except when an application has officially been withdrawn in writing by the  applicant prior to the issuance of any public notice required for the proposal.  In addition to the fees included here, all projects require reimbursement to the City for the full cost  of contracted engineering services to review the project.  Pre‐Application Conference 1st No Fee  2nd Pre‐Application Conference on same project $187  Major Plat ‐ Preliminary Review ‐ Base Fee $1,067  Plus this fee per lot $76  Engineering $371  Plus this fee per lot $29  Major Plat ‐ Final Review ‐  The Greater of the Minimum Base or Base + Per Lot Fee  Minimum Base $497  Base Fee $187  Plus this fee per lot $65  Engineering $519  Plus this fee per lot $29  Amendment/Alteration ‐ Plat  Administrative $440  If Public Hearing Required $1,500  Short Plat ‐ Preliminary Review ‐ Base Fee $675  Plus this fee per lot $76  Engineering $222  Plus this fee per lot $29  Short Plat ‐ Final Review ‐ Base Fee $282  Plus this fee per lot $48  Engineering $296  Plus this fee per lot $29  Amendment/Alteration ‐ Short Plat ‐ Base Fee $440  Plus this fee per lot $76  Binding Site Plan ‐ Preliminary Review ‐ Base Fee $796  Plus this fee per lot $76  Engineering $296  Plus this fee per lot $29  Binding Site Plan ‐ Final Review ‐ Base Fee $796  Plus this fee per lot $76  Engineering $371  Plus this fee per lot $29  Binding Site Plan Condo in Existing Bldg $562  Amendment or Alteration ‐ Binding Site Plan $337  Plus this fee per lot ‐ If lots are added $76  Engineering $296  Plus this fee per lot $29  Extension ‐ Plat, Short Plat, Binding Site Plan 1/2 Original Fee  Boundary Line Adjustment $282  EXHIBIT A  Rezone $1,686  Planned Unit Development $1,686  Conditional Use Permit $1,124  Home Occupation ‐ Administrative $141  Critical Areas Permits/Compliance/Reasonable Use etc. $469  Variance $1,500  Appeals $936  Addressing (per request or plat/BSP/short plat) $141  Comprehensive Plan Amendment $1,874  Zoning Text Amendment $1,874  Shoreline Permits (SDP, SCUP, SVariance) $1,874  Multifamily Tax Exemption     Conditional Certificate Application $483    Final Certificate Application $528 SEPA checklist review & DNS  With Notice $562  Without Notice $282  EIS ‐ minimum base fee + the actual expenses $936  Mitigated DNS, Expanded Checklist $562  WCF ‐ Broadcast and relay tower facility $1,151  WCF ‐ Up to 5 small cell or DAS facilities $576  Each Additional Facility $115  WCF ‐ Other wireless communications facilities application $576  Fire Marshal Services  Residential fire sprinkler plan review $111  Residential fire sprinkler inspection $111  Fire alarm & smoke detection system plan review $222  +per device fee $2  Fire alarm & smoke detection system inspection $222  +per device fee $3  Fire sprinkler system plan review $222  +per device fee $3  Fire sprinkler system inspection $111  +per device fee $3  Commercial IFC application plan review  Per Building Permit $371  If Single Component $111  Commercial IFC component inspection  (Commercial hood, high‐piled storage, membrane structures, fireworks stands,  fireworks displays, exhibitions, fire and sprinkler system revisions less than 5  devices, and standpipes.)      $111  Commercial fuel tanks (per tank)  500 gallons or less $222  501 to 5000 gallons $445  5001 gallons or more $667  Residential or commercial tank decommission $111  Development permit review $111  Reinspection fee $111