Loading...
HomeMy WebLinkAboutResolutions - 2022-36 - A Resolution authorizing the Mayor to execute a contract supplement with Pacific Engineering for Design, Right of Way, Bidding, and Services During Construction for the 19th Street NW Cascade Ave Improvements project. - 8/2/2022City of East Wenatchee Resolution 2022-36 with Exhibit A Retain Resolution until no longer needed for City-business, then transfer to Washington State Archives (GS50-05A-16 Rev. 1) Page 1 of 2 City of East Wenatchee, Washington Resolution No. 2022-36 A Resolution of the City of East Wenatchee, Washington authorizing the Mayor to execute a contract supplement with Pacific Engineering for Design, Right of Way, Bidding, and Services During Construction for the 19th Street NW & NW Cascade Ave Improvements project. 1. Alternate format. 1.1. Para leer este documento en otro formato (español, Braille, leer en voz alta, etc.), póngase en contacto con el vendedor de la ciudad al alternateformat@eastwenatcheewa.gov, al (509) 884- 9515 o al 711 (TTY). 1.2. To read this document in an alternate format (Spanish, Braille, read aloud, etc.), please contact the City Clerk at alternateformat@eastwenatcheewa.gov, at (509) 884-9515, or at 711 (TTY). 2. Authority. 2.1. RCW 35A.11.020 and RCW 35A.12.190 authorize the City Council to organize and regulate its internal affairs and to define the powers, functions and duties of its officers and employees. THE CITY COUNCIL OF THE CITY OF EAST WENATCHEE DO RESOLVE AS FOLLOWS: 3. Authorization. The City Council authorizes the Mayor to execute a contract supplement that conforms to the terms set forth in Exhibit A. 4. Severability. If a court of competent jurisdiction declares any provision in this resolution to be contrary to law, such declaration shall not affect the validity of the other provisions of this Resolution. 5. Effective date. This Resolution becomes effective immediately. Professional Engineering Services for the Design of the 2019 19th Street NW / Cascade Avenue Corridor Green Retrofit and LID Stormwater Facility Design Project (No. 2019-02), Amendment No. 1 Page 1 of 1 Amendment to the Professional Services Contract Between The City of East Wenatchee And Pacific Engineering & Design, PLLC For Professional Engineering Services for the Design of the 2019 19th Street NW / Cascade Avenue Corridor Green Retrofit and LID Stormwater Facility Design Project (No. 2019-02) CITY OF EAST WENATCHEE PACIFIC ENGINEERING & DESIGN, PLLC Signature: Signature: Jerrilea Crawford, Mayor J. Ryan Brownlee, Principal Date: Date: Federal Employee ID No.: 91-1704130 ATTEST: By: 7/29/2022 Exhibit A 200 South Columbia Street, Suite 300 l Wenatchee, WA 98801 I P 509.662.1161 l F 509.663.8227 l www.pacificengineering.net July 25, 2022 Garren Melton City of East Wenatchee 271 9th Street NE East Wenatchee, WA 98802 PROJECT: 19th Street and Cascade Avenue Corridor Green Retrofit and LID Stormwater Facility Design Project, East Wenatchee, WA Pacific Project No. 19025CC SUBJECT: Final Design, Supplemental Permitting, Bidding Services and Construction Management Services Fee Proposal Dear Garren, Thank you for the opportunity to provide additional services for the 19th Street and Cascade Avenue Corridor Green Retrofit and LID Stormwater Facility Design Project. Pacific Engineering & Design (Pacific) will provide the following. PROJECT DESCRIPTION The City of East Wenatchee and Douglas County Transportation and Land Services are implementing roadway and stormwater improvements along 19th Street and NW Cascade Avenue in East Wenatchee and Douglas County. Improvements generally consist of the following elements: 1. Widen streets to urban collector standard. a. 19th Street ±1,100 LF b. Cascade Avenue ±1,000 LF 2. Curb, gutter, sidewalk, driveways and stormwater conveyance. 3. Stormwater runoff treatment near the intersection of 19th Street and NW Cascade (regional facility). Previously completed activities consist of feasibility services and preliminary design (60% design level) including topographic survey, cultural resources assessment and tribal consultation, critical aquifer recharge area assessment, wetlands rating/delineation, utility coordination, geotechnical engineering and reporting. Additionally, permit applications consisting of SEPA checklist, shorelines and conditional use permits have been submitted for review / approval. Remaining work (this proposal) includes supplemental topographic survey, right-of-way acquisition necessary for construction of improvements to urban collector standard, final design (to 90% and 100% levels), supplemental permitting, project bidding, construction management services and project closeout. Exhibit A Garren Melton Final Design, Supplemental Permitting, Bidding Services and Construction Management Services Fee Proposal July 25, 2022 Project No. 19025CC Page 2 of 6 Project improvements are funded (in-part) by the Washington State Department of Ecology. Additional funding through Washington State’s Transportation Improvement Board is being sought. The balance of funding required for project improvements will come from other sources (e.g. local match, etc.). SUBCONTRACTORS Pacific intends to subcontract portions of the remaining work to the following firms: 1. Grette Associates, LLC (Grette) - Environmental and Land Use Permitting 2. 48-Degrees North - Supplemental Surveying 3. Tierra Right of Way Services, Ltd. (Tierra) - Right of Way Acquisition Services under this fee proposal will be accomplished under the following scope of work. SCOPE OF WORK TASK 7 – SUPPLEMENTAL PERMITTING AND PROJECT APPROVALS OBJECTIVE The objective of this task is to facilitate additional permitting process (SEPA / land use) and to assist with acquisition of additional permits to facilitate construction. APPROACH Pacific and/or its subcontractors will review and respond to questions arising from SEPA and land use permitting process, and attend public hearing associated land use permitting submitted during prior phases. Additionally, Pacific will assist with acquiring additional permits that may be required in advance of construction such as City / County right-of-way permits and construction stormwater permit coverage (NPDES) ACTIVITIES 1. Respond to agency questions related to SEPA, land use and shoreline permitting. 2. Attend public hearing related to land use permitting. 3. Complete Notice of Intent (NOI) application form for Construction Stormwater General Permit Coverage. 4. Assist with acquisition of local right-of-way permitting (City and County). DELIVERABLES 1. Final SEPA Determination 2. Land Use and Shorelines Permitting 3. Construction Stormwater General Permit Coverage TASK 8 - CONSTRUCTION DOCUMENTS OBJECTIVE The objective of this task is to prepare final documents for bidding and construction. APPROACH This task will provide 90% and 100% construction documents including plans, specifications and estimate (PS&E). Comments from City, County, Ecology and public / private utilities will be incorporated at appropriate stages. Prior to submittal, each deliverable will be thoroughly reviewed for quality assurance and quality control (QA / QC). Additionally, supplemental Exhibit A Garren Melton Final Design, Supplemental Permitting, Bidding Services and Construction Management Services Fee Proposal July 25, 2022 Project No. 19025CC Page 3 of 6 topographic survey will be obtained to accommodate additional scope of design identified as a result of 60% design activities. ACTIVITIES 1. Obtain supplemental topographic survey. 2. Design drawings will be updated generally including: a. Cover Sheet, Abbreviations and Notes, Symbol Legend, Summary of Quantities, Site Survey, Existing Site Plan, Roadway Sections, Roadway Grading and Drainage Plans and Details, Signage and Traffic Channelization Plan and Details, Regional Stormwater Facility Plan and Details, TESC Plan and Details, Temporary Traffic Control Plans b. Utility Relocation Series 3. Project specifications will be updated in APWA / WSDOT local agency format including: a. General special provisions b. Amendments c. Special provisions 4. Construction Cost Estimate will be updated. 5. Responses to Ecology Comments on various deliverables will be prepared. DELIVERABLES 1. Design Drawings (Plans) 2. Project Specifications a. General special provisions b. Amendments c. Special provisions 3. Construction Cost Estimate TASK 9 – RIGHT-OF-WAY ACQUISITION SERVICES OBJECTIVE The objective of this task is to facilitate negotiation and acquisition of right-of-way and temporary construction easements necessary for project construction to urban collector standard. APPROACH Pacific and/or its subcontractors will prepare exhibits / legal descriptions, obtain title reports, conduct appraisals, and conduct acquisition services for up to eight (8) parcels where additional permanent right-of-way is necessary for project improvements. Additionally, Pacific and/or its subcontractors will acquire temporary construction easements for up to 17-parcels. ACTIVITIES 1. Prepare Exhibits / Legal Descriptions of Each Parcel 2. Obtain Title Reports and Appraisal Services 3. Conduct Acquisition Services 4. Obtain Temporary Construction Easements DELIVERABLES 1. Right-of-Way Acquisition for up to 8-Parcels 2. Temporary Construction Easements for up to 17-Parcels Exhibit A Garren Melton Final Design, Supplemental Permitting, Bidding Services and Construction Management Services Fee Proposal July 25, 2022 Project No. 19025CC Page 4 of 6 TASK 10 – BID DOCUMENTS AND BIDDING SUPPORT OBJECTIVE The objective of this task is to assist with selection of a qualified contractor for construction. APPROACH Pacific will prepare bid documents consisting of advertisement, information to bidders, bid forms (bid proposal, bid bond, bidders qualification certificate, non-collusion affidavit, subcontractor list, certificate of compliance with prevailing wages, etc.), contract forms (sample contract, performance and payment bond, sample certificate of insurance, etc.), state prevailing wages, special provisions, and project plans. Pacific will also coordinate advertisement and conduct a single bid process including providing bid documents to prospective bidders, responding to bidder questions, issuing addenda (if necessary), conducting one (1) prebid walk through, attending one (1) bid opening, reviewing / tabulating bids, and preparing recommendation of award. DELIVERABLES - Bid Documents - Bid Tabulation and Award Recommendation TASK 11 – CONSTRUCTION MANAGEMENT SERVICES AND PROJECT CLOSEOUT OBJECTIVE The objective of this task is to assist with construction management including contract administration and part-time, on-site observation through duration of construction. Additionally, objectives of this task include project closeout associated with grant funding sources. APPROACH Pacific will provide the following construction management services: - Review of request for approval of materials. - Prepare written response to RFI’s. - Assist with recommending construction changes. - Attend pre-construction conference. - Perform on-site construction observation (see assumptions below). - Review and approve monthly contractor pay-requests. - Perform punch list inspection and prepare punch list. - Perform final inspection. - Prepare recommendation for final acceptance. - Prepare record drawings and closeout services. Additionally, Pacific will provide the following closeout services: - Develop Facility Operation and Maintenance Plan. - Prepare final as-constructed equivalent new/redevelopment area determination. - Prepare final as-constructed project area shapefile. DELIVERABLES - Documented approval of materials - Written RFI responses - Documented construction change recommendations - Daily inspection reports and photos - As-built drawings Exhibit A Garren Melton Final Design, Supplemental Permitting, Bidding Services and Construction Management Services Fee Proposal July 25, 2022 Project No. 19025CC Page 5 of 6 EXCLUSIONS The following are specifically excluded from this proposal. If requested, these services can be provided on a time and materials basis in accordance with the attached fee schedule. 1. Hazardous Environmental Services (if applicable) 2. Permit Applications Beyond Those Specifically Identified 3. Permit Fees 4. Cost of Right-of-Way Land Acquisition 5. Right-of-Way Acquisition for widening beyond urban collector standard 6. Special Inspection and Materials Testing Services (e.g. coils compaction, concrete strength testing, etc.) 7. Archaeological Monitoring during Construction 8. Geotechnical Engineering 9. Electrical Engineering ASSUMPTIONS The following assumptions were made when developing this proposal. Deviations from these assumptions may necessitate adjustments to the scope and fee proposal: - Construction observation will be part-time in nature. For the purpose of this proposal, level of effort has been estimated at 30 hours per week for a period of 24 weeks. - Special inspections and materials testing services (e.g. backfill compaction testing, concrete strength testing, pressure testing, etc.) will be provided by others. FEE PROPOSAL These services will be provided on a time and materials basis in accordance with the following schedule: TASK DESCRIPTION FEE 7. Supplemental Permitting and Project Approvals $7,500 8. Construction Documents $100,500 9. Right of Way Acquisition Services $160,000(1) 10. Bid Documents and Bidding Support $7,500 11. Construction Management Services and Project Close-Out $208,500(2) TOTAL $484,000(3,4,5) FOOTNOTES 1. Right-of-way acquisition services are not eligible for grant reimbursable. Task will be tracked and billed separately. 2. Construction management services do not include archaeological monitoring during construction. 3. The proposed fee is based on the scope of work outlined, through construction and final acceptance. Changes in scope or additional requested items will be invoiced on a time and expense basis, in accordance with the attached fee schedule. Work will be invoiced utilizing the fee schedule current to the year in which services are performed. Pacific’s 2022 Fee Schedule is attached. 4. The proposed fee identified for individual tasks are estimates only and are provided for convenience. Adjustments of fee between individual tasks within the total limit of proposed fee may be necessary to complete the work. 5. The proposed fee includes Pacific’s 15% mark-up for subconsultant oversight. Exhibit A Garren Melton Final Design, Supplemental Permitting, Bidding Services and Construction Management Services Fee Proposal July 25, 2022 Project No. 19025CC Page 6 of 6 PROJECT SCHEDULING It is understood that work will begin immediately once authorization to proceed is provided. Thank you for the opportunity to work with you on this project. Please review the above information and call if you have any questions or need additional information. Sincerely, J. Ryan Brownlee, PE Principal, Senior Civil Engineer Attachment: 2022 Fee Schedule Exhibit A 200 South Columbia Street, Suite 300 l Wenatchee, WA 98801 I P 509.662.1161 l F 509.663.8227 l www.pacificengineering.net 2022 FEE SCHEDULE DESCRIPTION HOURLY RATE SENIOR V $215 SENIOR IV $194 SENIOR III $187 SENIOR II $180 SENIOR I $175 PROJECT IV $170 PROJECT III $165 PROJECT II $157 PROJECT I $150 TECHNICIAN V $140 TECHNICIAN IV $133 TECHNICIAN III $126 TECHNICIAN II $120 TECHNICIAN I $114 STAFF V $90 STAFF IV $80 STAFF III $70 STAFF II $60 STAFF I $50 EXPENSES: COST +15% Exhibit A