Loading...
HomeMy WebLinkAboutResolutions - 2022-26 - A Resolution of the City of East Wenatchee, Washington authorizing the Mayor to execute a consultant agreement supplement between the City and RH2 Engineering for the Hamilton Street Reconstruction project. - 8/2/2022City of East Wenatchee Resolution 2022-26 with Exhibit A Retain Resolution until no longer needed for City-business, then transfer to Washington State Archives (GS50-05A-16 Rev. 1) Page 1 of 2 City of East Wenatchee, Washington Resolution No. 2022-26 A Resolution of the City of East Wenatchee, Washington authorizing the Mayor to execute a consultant agreement supplement between the City of East Wenatchee and RH2 Engineering for the Hamilton Street Reconstruction project. 1. Alternate format. 1.1. Para leer este documento en otro formato (español, Braille, leer en voz alta, etc.), póngase en contacto con el vendedor de la ciudad al alternateformat@eastwenatcheewa.gov, al (509) 884- 9515 o al 711 (TTY). 1.2. To read this document in an alternate format (Spanish, Braille, read aloud, etc.), please contact the City Clerk at alternateformat@eastwenatcheewa.gov, at (509) 884-9515, or at 711 (TTY). 2. Authority. 2.1. RCW 35A.11.020 and RCW 35A.12.190 authorize the City Council to organize and regulate its internal affairs and to define the powers, functions and duties of its officers and employees. THE CITY COUNCIL OF THE CITY OF EAST WENATCHEE DO RESOLVE AS FOLLOWS: 3. Authorization. The City Council authorizes the Mayor to execute a contract amendment that conforms to the language set forth in Exhibit A. 4. Severability. If a court of competent jurisdiction declares any provision in this resolution to be contrary to law, such declaration shall not affect the validity of the other provisions of this Resolution. 5. Effective date. This Resolution becomes effective immediately. 07/19/22 12:00 PM J:\data\EW\21-0251\00 Contract\Amnd 2\Amnd No. 2_AGMT_Hamilton St Improvements SDC.docx City of East Wenatchee Contract Amendment No.2 Hamilton Street Improvements Services During Construction RH2 Project No.EW 210251 In accordance with our Professional Services Agreement for Hamilton Street Improvements project, dated August 19, 2021,this is an authorization to revise the project Scope of Work as described below. The work will be performed and invoiced using the terms and conditions listed in the original agreement,plus previous amendments. Reference attached Exhibit A –Scope of Work,and Exhibit B –Fee Estimate. The engineering fee authorization will increase by $65,154 for a total authorization amount of $220,793. Please sign this authorization in the space provided below and return to RH2 Engineering,Inc.,by mail at the address below,or by email to dpettit@rh2.com. RH2 Engineering, Inc.City of East Wenatchee Signature Signature Print Name/Title Print Name/Title Date Date RH2 Engineering, Inc.300 Simon Street SE, Suite 5, East Wenatchee, WA 98801 City of East Wenatchee, 271 Ninth Street NE, East Wenatchee, WA 98802 7/19/2022 Paul R. Cross, Executive Vice President Original Page 1 of 4 Pages Exhibit A Resolution 2022-26 Hamilton Street Reconstruction Project Number 2021-02 1 7/20/2022 2:09:34 PM J:\DATA\EW \21-0251\00 CONTRACT\AMND 2\AMND NO. 2_SOW_HAMILTON ST IMPROVEMENTS SDC.DOCX EXHIBIT A Scope of Work Amendment No.2 City of East Wenatchee Hamilton Street Improvements Services During Construction July 2022 Background RH2 Engineering, Inc., (RH2) has been asked to provide on -call construction contract administration services to support the City of East Wenatchee (City)during construction of the Hamilton Street Improvements project.This Scope of Work is an amendment to the City’s Hamilton Street Improvements project, and details the tasks related to providing services during construction.RH2’s support will be provided to the level of effort identified in this Scope of Work and the accompanying Fee Estimate. If additional services or effort are required, an amendment will be mutually determined by RH2 and the City. Task 1 –Hamilton Street Improvements Services During Construction Objective:Provide construction contract administration and observation support for the City throughout the project. Approach: Review materials submittals on the project for compliance with the construction contract documents and prepare monthly pay estimates. Provide part-time construction observation services at milestone points,such as at the beginning of trench excavation,subsurface preparation, checking pipe and structures for plan consistency,asphalt paving,and curb and rock placement.The intent of the on-site observation is to observe the quality and compliance of the work with the construction contract plans and specifications.The Fee Estimate reflects a total of six (6) hours per week of on-site observations by an RH2 representative for the duration of the construction period (assumed to be fourteen (14) weeks).Compaction tests on the backfill and pavement will be performed by Construction Special Inspection as a subcontractor to RH2 and requests will be coordinated by the City and RH2. Coordinate with a subconsultant to conduct on-site cultural monitoring work during utility trenching operations.This work will be completed by Plateau Archaeological Investigation,as a subconsultant to RH2.Provide project data and respond to questions. Assumptions: It is assumed RH2 will not provide full-time observation but instead support the City’s staff. RH2 is not responsible for site safety or for directing the contractor in their work. Original Page 2 of 4 Pages Exhibit A Resolution 2022-26 Hamilton Street Reconstruction Project Number 2021-02 City of East Wenatchee Amendment No.2 Hamilton Street Improvements Exhibit A Services During Construction Scope of Work 2 7/20/2022 2:09:34 PM J:\DATA\EW \21-0251\00 CONTRACT\AMND 2\AMND NO. 2_SOW_HAMILTON ST IMPROVEMENTS SDC.DOCX Provided by City: Daily construction observation duties performed by a City inspector. Coordination of materials testing. Coordination with cultural resources inspector during trenching operations. RH2 Deliverables: Submittal reviews in electronic PDF. Monthly pay estimates in electronic PDF. Part-time on-site construction observation at milestones. Project Schedule Construction is anticipated to be complete by mid-October 2022. Original Page 3 of 4 Pages Exhibit A Resolution 2022-26 Hamilton Street Reconstruction Project Number 2021-02 EXHIBIT B Fee Estimate Amendment No. 2 City of East Wenatchee Hamilton Street Improvements Services During Construction Jul-22 Description Total Hours Total Labor Total Subconsultant Total Expense Total Cost Task 1 Services During Construction 108 18,024$ 46,552$ 578$ 65,154$ PROJECT TOTAL 108 18,024$ 46,552$ 578$ 65,154$ J:\data\EW\21-0251\00 Contract\Amnd 2\Amnd No. 2_FEE_Hamilton St Improvements SDC.xlsm 7/19/2022 11:51 AM Original Page 4 of 4 Pages Exhibit A Resolution 2022-26 Hamilton Street Reconstruction Project Number 2021-02