Loading...
HomeMy WebLinkAboutResolutions - 2022-11 - Authorizing a consultant agreement supplement between the City of East Wenatchee and RH2 Engineering for the Hamilton Street Reconstruction project No 2021-02. - 3/1/2022City of East Wenatchee Resolution 2022-11 with Exhibit A Retain Resolution until no longer needed for City-business, then transfer to Washington State Archives (GS50-05A-16 Rev. 1) Page 1 of 2 City of East Wenatchee, Washington Resolution No. 2022-11 A Resolution of the City of East Wenatchee, Washington authorizing the Mayor to execute a consultant agreement supplement between the City of East Wenatchee and RH2 Engineering for the Hamilton Street Reconstruction project. 1. Alternate format. 1.1. Para leer este documento en otro formato (español, Braille, leer en voz alta, etc.), póngase en contacto con el vendedor de la ciudad al alternateformat@eastwenatcheewa.gov, al (509) 884-9515 o al 711 (TTY). 1.2. To read this document in an alternate format (Spanish, Braille, read aloud, etc.), please contact the City Clerk at alternateformat@eastwenatcheewa.gov, at (509) 884-9515, or at 711 (TTY). 2. Authority. 2.1. RCW 35A.11.020 and RCW 35A.12.190 authorize the City Council to organize and regulate its internal affairs and to define the powers, functions and duties of its officers and employees. THE CITY COUNCIL OF THE CITY OF EAST WENATCHEE DO RESOLVE AS FOLLOWS: 3. Authorization. The City Council authorizes the Mayor to execute a contract amendment that conforms to the language set forth in Exhibit A. 4. Severability. If a court of competent jurisdiction declares any provision in this resolution to be contrary to law, such declaration shall not affect the validity of the other provisions of this Resolution. 5. Effective date. This Resolution becomes effective immediately. 02/23/22 2:31 PM J:\data\EW\21-0251\00 Contract\Amnd 1\Amnd No. 1_AGMT_Hamilton St Improvements.docx City of East Wenatchee Contract Amendment No. 1 Hamilton Street Improvements Property Legal Descriptions and Acquisition RH2 Project No. EW 21.0251 In accordance with our Professional Services Agreement for Hamilton Street Improvements project, dated August 19, 2021, this is an authorization to revise the project Scope of Work as described below. The work will be performed and invoiced using the terms and conditions listed in the original agreement, plus previous amendments. Reference attached Exhibit A – Scope of Work, and Exhibit B – Fee Estimate. The engineering fee authorization will increase by $37,437 for a total authorization amount of $155,639. The project completion date has been changed to December 31, 2022. Please sign this authorization in the space provided below and return to RH2 Engineering, Inc., by mail at the address below, or by email to dpettit@rh2.com. RH2 Engineering, Inc. City of East Wenatchee Signature Signature Print Name/Title Print Name/Title Date Date RH2 Engineering, Inc. 300 Simon Street SE, Suite 5, East Wenatchee, WA 98802 City of East Wenatchee 271 Ninth Street NE, East Wenatchee, WA 98802 Original Page 1 of 4 Pages DRAFT Exhibit A 1 2/23/2022 2:36:28 PM J:\DATA\EW\21-0251\00 CONTRACT\AMND 1\AMND NO. 1_SOW_HAMILTON ST IMPROVEMENTS.DOCX EXHIBIT A Scope of Work Amendment No. 1 City of East Wenatchee Hamilton Street Improvements Property Legal Descriptions and Acquisition February 2022 Background This Scope of Work is an amendment to the City of East Wenatchee (City) Hamilton Street Improvements project, and details the tasks related to right-of-way acquisition necessary as identified in the initial design. Task 1 –Property Legal Descriptions and Acquisition Objective:Complete property right-of-way exhibits, set property boundaries, and provide legal descriptions for acquired properties.Facilitate the acquisition of real property for one (1) parcel adjacent to the road improvements and two (2) temporary construction easements. Approach: Prepare right-of-way exhibits. Determine the right-of-way required for the project improvements and coordinate with a surveyor to prepare right-of-way exhibits and legal description.This work will be completed by Northwest GeoDimensions, Inc.,as a subconsultant to RH2.Coordinate with the subconsultant, provide project data, and respond to questions. Provide one (1) Administrative Offer Summary (AOS) package to be used in support of right-of-way acquisition and negotiation for right-of-way acquisition from one (1) property owner.Provide the documentation and negotiation with two (2) property owners to acquire the temporary construction easements (TCE) necessary for the project.This work will be completed by Tierra Right of Way Services, Ltd., (Tierra)as a subconsultant to RH2. Coordinate with the subconsultant, provide project data, and respond to questions. Assumptions: The right-of-way acquisition will be from a single parcel; no relocation will be necessary.Title report fees, appraisal fees, recording fees, and escrow fees are included in this Scope of Work for the right-of-way acquisition.The TCEs will be acquired without appraisals. Provided by City: Review and approval of the AOS packages. Original Page 2 of 4 Pages DRAFT Exhibit A City of East Wenatchee Amendment No. 1 Hamilton Street Improvements Exhibit A Property Legal Descriptions and Acquisition Scope of Work 2 2/23/2022 2:36:28 PM J:\DATA\EW\21-0251\00 CONTRACT\AMND 1\AMND NO. 1_SOW_HAMILTON ST IMPROVEMENTS.DOCX RH2 Deliverables: Right-of-way exhibits in electronic PDF. Legal description for property acquisition in electronic PDF. One (1)AOS package through the subconsultant, Tierra. Negotiation with two (2) property owners through the subconsultant, Tierra. Task 2 –Inadvertent Discovery Plan Objective:Complete Inadvertent Discovery Plan (IDP) to satisfy cultural resource consultation requirements. Approach: Prepare Inadvertent Discovery Plan.This work will be completed by Plateau Archaeological Investigation,as a subconsultant to RH2.Coordinate with the subconsultant, provide project data, and respond to questions. RH2 Deliverables: IDP in electronic PDF. Original Page 3 of 4 Pages DRAFT Exhibit A EXHIBIT B Fee Estimate Amendment No. 1 City of East Wenatchee Hamilton Street Improvements Property Legal Descriptions and Acquisition Feb-22 Description Total Hours Total Labor Total Subconsultant Total Expense Total Cost Task 1 Property Survey and Acquisition 21 3,300$ 32,810$ 484$ 36,594$ Task 2 Inadvertent Discovery Plan 2 402$ 431$ 10$ 843$ PROJECT TOTAL 23 3,702$ 33,241$ 494$ 37,437$ J:\data\EW\21-0251\00 Contract\Amnd 1\Amnd No. 1_FEE_Hamilton St Improvements.xlsm 2/23/2022 2:35 PM Original Page 4 of 4 Pages DRAFT Exhibit A