Loading...
HomeMy WebLinkAboutResolutions - 2022-06 - Authorizing an agreement, supplement #2, between the City and RH2 Engineering for services during construction, 9th street NE & Valley Mall Parkway Signal Project, Proj No 2019-07 - 2/1/2022City of East Wenatchee Resolution 2022-06 with Exhibit A Retain Resolution until no longer needed for City-business, then transfer to Washington State Archives (GS50-05A-16 Rev. 1) Page 1 of 2 City of East Wenatchee, Washington Resolution No. 2022-06 A Resolution of the City of East Wenatchee, Washington authorizing the Mayor to execute Agreement Supplement #2 between the City of East Wenatchee and RH2 Engineering for services during construction associated with the 9th Street NE & Valley Mall Parkway Signal Project 1. Alternate format. 1.1. Para leer este documento en otro formato (español, Braille, leer en voz alta, etc.), póngase en contacto con el vendedor de la ciudad al alternateformat@eastwenatcheewa.gov, al (509) 884-9515 o al 711 (TTY). 1.2. To read this document in an alternate format (Spanish, Braille, read aloud, etc.), please contact the City Clerk at alternateformat@eastwenatcheewa.gov, at (509) 884-9515, or at 711 (TTY). 2. Authority. 2.1. RCW 35A.11.020 and RCW 35A.12.190 authorize the City Council to organize and regulate its internal affairs and to define the powers, functions and duties of its officers and employees. THE CITY COUNCIL OF THE CITY OF EAST WENATCHEE DO RESOLVE AS FOLLOWS: 3. Authorization. The City Council authorizes the Mayor to execute a contract amendment that conforms to the language set forth in Exhibit A. 4. Severability. If a court of competent jurisdiction declares any provision in this resolution to be contrary to law, such declaration shall not affect the validity of the other provisions of this Resolution. 5. Effective date. This Resolution becomes effective immediately. Supplemental Agreement Number Organization and Address Phone: Original Agreement Number Project Number Execution Date Completion Date Project Title New Maximum Amount Payable Description of Work The Local Agency of desires to supplement the agreement entered in to with and executed on and identified as Agreement No. All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: I Section 1, SCOPE OF WORK, is hereby changed to read: II Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for completion of the work to read: III Section V, PAYMENT, shall be amended as follows: as set forth in the attached Exhibit A, and by this reference made a part of this supplement. If you concur with this supplement and agree to the changes as stated above, please sign in the Appropriate spaces below and return to this office for final action. By: By: Consultant Signature Approving Authority Signature Date DOT Form 140-063 Revised 09/2005 City of East Wenatchee RH2 Engineering, Inc. 2/18/2020 Refer to Exhibit B - Scope of Work. December 31, 2022 Refer to Exhibit C - Fee Estimate. Refer to Exhibit D - Negotiated Hourly Rates of Pay. 2 RH2 Engineering, Inc., 300 Simon Street SE, Suite 5 East Wenatchee, WA 98802 509-886-2900 December 31, 2022 9th Street NE & Valley Mall Parkway Intersection Improvements $285,561.24 Services During Construction Paul R. Cross - Executive Vice President Exhibit A Exhibit A Basic Agreement Supplement #1 Supplement #2 Total Direct Salary Cost $34,238.42 $7,403.00 $38,163.48 $79,804.90 Overhead (Including Payroll Additives)$64,553.11 $13,728.86 $74,456.96 $152,738.93 Direct Non-Salary Costs $15,013.10 $1,650.00 $8,422.60 $25,085.70 Fixed Fee $11,983.45 $2,591.05 $13,357.22 $27,931.71 Total $125,788.08 $25,372.90 $134,400.26 $285,561.24 Exhibit A 1 11/3/20211:18:51 PM J:\Data\EW\20-0024\00 Contract\Amend No. 2\Amnd No. 2_SOW_9th&VMP Signal SDC.docx EXHIBIT B Scope of Work Supplemental Agreement No. 2 City of East Wenatchee 9th Street NE and Valley Mall Parkway Intersection Improvements Services During Construction November 2021 Background This Scope of Work describes the tasks to provide construction contract administration services for improvements to the intersection of 9th Street NE and Valley Mall Parkway in East Wenatchee, Washington. The project begins at the intersection of 9th Street NE and State Route 28 and continues through the intersection of 9th Street NE and Valley Mall Parkway.This amendment provides for services during construction.The project is funded through the Surface Transportation Program (STP) federal funding program. Task 5 –Services During Construction Objective:Provide construction contract administration and observation services for the 9th Street NE and Valley Mall Parkway Intersection Improvements project. Construction contract administration services include time before and after construction is complete. Approach: Attend Pre-Construction Conference –Prepare for and provide an agenda and meeting minutes for the pre-construction conference. Attend the pre-construction conference, to be held at RH2, with the RH2 project manager and one (1)RH2 observer. Provide additional copies of the plans and specifications in accordance with the construction contract documents. Coordinate Materials Testing –Coordinate with a materials testing laboratory to facilitate testing of the concrete, asphalt, and earthwork items in accordance with the Washington State Department of Transportation (WSDOT)Standard Specifications for Road, Bridge, and Municipal Construction.Materials testing services will be provided by Construction Special Inspection (CSI) as a subconsultant to RH2. Review Submittals –Prepare Record of Materials (ROM) spreadsheet to track submittal reviews. Review submittals for up to fifty (50) materials (Qualified Product Lists (QPLs), Request(s) for Approval of Materials (RAMs), manufacturer certificate of compliance, mix designs, and shop drawings) in accordance with the project plans and specifications. Maintain the ROM on a weekly basis during construction. Provide Construction Observation Services –Provide one (1) part-time project observer for an average of six (6) hours per day throughout construction. Provide specialized observation as required for signal and illumination construction. Observation duties will include the following: Exhibit A City of East Wenatchee Supplemental Agreement No. 2 9th Street NE and Valley Mall Parkway Intersection Improvements Exhibit B Services During Construction Scope of Work 2 11/3/20211:18:51 PM J:\Data\EW\20-0024\00 Contract\Amend No. 2\Amnd No. 2_SOW_9th&VMP Signal SDC.docx a.Monitoring and documenting the construction contractor’s daily operations through daily reports and photographs of the construction progress. b.Collecting item quantity tickets (IQTs) and measurements of items to be used in preparing the pay estimates. c.Addressing technical issues and questions onsite. d.Collecting and maintaining records for utilities, earthwork, surfacing, concrete, asphalt, and traffic control items. Maintaining the project ledger for payment of construction contract items. e.On-site coordination with utility purveyors. Respond to Questions and Attend Meetings –Attend weekly site visits by the RH2 project manager, or as requested, to participate in project meetings and/or address technical issues and respond to construction contractor questions that cannot be addressed in the field by the observer. Prepare a weekly statement of working days. Prepare Progress Payments –Prepare four (4) pay estimates based on quantities provided by the observer. Review Change Orders –Review and prepare up to two (2) change orders for City and WSDOT approval. Prepare Construction Record Drawings –Prepare construction records drawings based on RH2 observer and contractor records. Provide Project Closeout –Organize and maintain project records for closeout. Prepare letters as required for substantial completion, physical completion, and project completion. Provide Project Management Services –Review invoices and budget throughout the construction phase of the project. Communicate observed status of construction and budget with the City on a monthly basis. Coordinate with staff and contractor, and administer request for sublets, lower tier subcontractor certification, and statements of intent. Set up RH2’s construction files.Track, assemble, file, and maintain construction documentation. Coordinate with outside utilities and agencies, including the City, the contractor,WSDOT,East Wenatchee Water District, Douglas County Sewer District No.1,Wenatchee Reclamation District,Public Utility District of Douglas County, Frontier, Charter, Cascade Natural Gas, Link Transit, and Douglas County Fire District. Assist City staff with public outreach and business coordination by responding to questions during construction.It is anticipated RH2 will respond to questions from the business community by phone or email. Assumptions: ·The construction project will last sixty (60) working days. RH2 will perform services during construction up the level included in the attached Exhibit C –Fee Estimate. Additional effort, if needed, will be mutually determined by the City and RH2. Exhibit A City of East Wenatchee Supplemental Agreement No. 2 9th Street NE and Valley Mall Parkway Intersection Improvements Exhibit B Services During Construction Scope of Work 3 11/3/20211:18:51 PM J:\Data\EW\20-0024\00 Contract\Amend No. 2\Amnd No. 2_SOW_9th&VMP Signal SDC.docx ·RH2 is not responsible for site safety, for directing the contractor or others in their work, or for determining means and methods. RH2 Deliverables: ·Pre-construction meeting agenda and minutes (fifteen (15) hard copies). ·Construction plans and specifications (five (5) hard copies of half-size plans and specifications). ·Submittal reviews in PDF format. ·ROM in PDF format. ·Part-time construction observation. ·Construction observation reports and photos in PDF format. ·Responses to technical questions in PDF format. ·Weekly statement of working days in PDF format. ·Four (4) pay estimates in PDF format. ·Two (2) change orders in PDF format. ·Construction record drawings in PDF format. ·Letters of substantial completion, physical completion, and project completion in PDF format. ·Project records in PDF format. ·Monthly invoices in PDF format. Project Schedule Construction of the project is scheduled to begin in the spring of 2022 and continue for sixty (60)working days. Closeout of the project is currently anticipated in the summer/fall of 2022. Exhibit A EXHIBIT C Fee Estimate Supplemental Agreement No. 2 City of East Wenatchee 9th Street NE and Valley Mall Parkway Intersection Improvements Services During Construction Nov-21 Description Principal Project Engineer Staff Engineer Project Accounting Administrative Support Total Hours Total Labor Total Subconsultant Total Expense Total Cost Classification Professional VII Professional V Professional I Administrative IV Administrative III Task 5 Services During Construction 254 20 400 4 8 686 125,978$ 7,728.75$ 694$ 134,400.26$ 5.1 Attend Pre-Construction Conference 6 -2 -8 2,040.00$ -$ 1.35$ 2,041.35$ 5.2 Coordinate Materials Testing 4 ---4 1,214.76$ 7,728.75$ 692.50$ 9,636.01$ 5.3 Review Submittals 40 -20 -60 14,326.20$ -$ -$ 14,326.20$ 5.4 Provide Construction Observation Services 60 20 360 -440 61,397.40$ -$ -$ 61,397.40$ 5.5 Respond to Questions and Attend Meetings 40 ---40 12,147.60$ -$ -$ 12,147.60$ 5.6 Prepare Progress Payments 20 -8 -28 6,945.24$ -$ -$ 6,945.24$ 5.7 Review Change Orders 20 ---20 6,073.80$ -$ -$ 6,073.80$ 5.8 Prepare Construction Record Drawings 4 -8 -12 2,086.20$ -$ -$ 2,086.20$ 5.9 Provide Project Closeout 20 -2 4 26 6,700.98$ -$ -$ 6,700.98$ 5.10 Provide Project Management Services 40 --4 4 48 13,045.48$ -$ -$ 13,045.48$ PROJECT TOTAL 254 20 400 4 8 686 125,977.66$ 7,728.75$ 693.85$ 134,400.26$ J:\Data\EW\20-0024\00 Contract\Amend No. 2\Amnd No.2_FEE_9th&VMP Signal SDC.xlsm 11/3/2021 1:20 PM Exhibit A City of East Wenatchee 9th Street NE and Valley Mall Parkway Intersection Improvements Services During Construction Classification / Job Title Hourly Overhead @ Profit @ Rate x Labor Hours = Cost Rate 195.10%35.00%Per Hour Professional I 33.00$ 64.38$ 11.55$ 108.93$ 400.0 43,572.00$ Professional II 37.00$ 72.19$ 12.95$ 122.14$ 0.0 -$ Professional III 41.00$ 79.99$ 14.35$ 135.34$ 0.0 -$ Professional IV 50.00$ 97.55$ 17.50$ 165.05$ 0.0 -$ Professional V 60.00$ 117.06$ 21.00$ 198.06$ 20.0 3,961.20$ Professional VI 74.00$ 144.37$ 25.90$ 244.27$ 0.0 -$ Professional VII 92.00$ 179.49$ 32.20$ 303.69$ 254.0 77,137.26$ Professional VIII 105.00$ 204.86$ 36.75$ 346.61$ 0.0 -$ Professional IX 137.00$ 267.29$ 47.95$ 452.24$ 0.0 -$ Administrative I 24.00$ 46.82$ 8.40$ 79.22$ 0.0 -$ Administrative II 27.00$ 52.68$ 9.45$ 89.13$ 0.0 -$ Administrative III 31.00$ 60.48$ 10.85$ 102.33$ 8.0 818.64$ Administrative IV 37.00$ 72.19$ 12.95$ 122.14$ 4.0 488.56$ Administrative V 59.00$ 115.11$ 20.65$ 194.76$ 0.0 -$ 125,977.66$ Reimbursables Rate Qty CAD System Per Hour $27.50 0 -$ GIS System Per Hour $27.50 0 -$ CAD Plots Half Size $2.50 250 625.00$ CAD Plots Full Size $10.00 0 -$ CAD Plots Large $25.00 0 -$ In-house copies (each)8.5" X 11" B&W $0.09 765 68.85$ In-house copies (each)8.5" X 14" B&W $0.14 0 -$ In-house copies (each)11" X 17" B&W $0.20 0 -$ In-house copies (color) (each)8.5" X 11" Color $0.90 0 -$ In-house copies (color) (each)8.5" X 14" Color $1.20 0 -$ In-house copies (color) (each)11 X 17" Color $2.00 0 -$ Mileage 0.575$ 0 -$ 693.85$ Subconsultant Costs: 7,728.75$ Subconsultant Markup: -$ Total Subconsultant: 7,728.75$ Grand Total: 134,400.26$ Prepared by: E. Howe Exhibit C Continued Consultant Fee Determination - Nogotiated Hourly Rate Consultant Agreement Exhibit A Labor Category Negotiated Hourly Labor Rate Overhead on Labor Rate Fixed Fee on Labor Rate Negotiated Rate Per Hour 195.10%35% Professional I 33.00 64.38 11.55 108.93 Professional II 37.00 72.19 12.95 122.14 Professional III 41.00 79.99 14.35 135.34 Professional IV 50.00 97.55 17.50 165.05 Professional V 60.00 117.06 21.00 198.06 Professional VI 74.00 144.37 25.90 244.27 Professional VII 92.00 179.49 32.20 303.69 Professional VIII 105.00 204.86 36.75 346.61 Professional IX 137.00 267.29 47.95 452.24 Administrative I 24.00 46.82 8.40 79.22 Administrative II 27.00 52.68 9.45 89.13 Administrative III 31.00 60.48 10.85 102.33 Administrative IV 37.00 72.19 12.95 122.14 Administrative V 59.00 115.11 20.65 194.76 CAD/GIS System $/hr 27.50$ CAD Plots Half Size price/plot 2.50$ CAD Plots Full Size price/plot 10.00$ CAD Plots Large price/plot 25.00$ Copies (bw) 8.5" X 11"price/copy 0.09$ Copies (bw) 8.5" X 14"price/copy 0.14$ Copies (bw) 11" X 17"price/copy 0.20$ Copies (color) 8.5" X 11"price/copy 0.90$ Copies (color) 8.5" X 14"price/copy 1.20$ Copies (color) 11 X 17"price/copy 2.00$ Mileage per mile (or Current IRS Rate)0.560$ Travel at Cost Subconsultants at Cost Outside Services at Cost EXHIBIT D Consultant Fee Determination - Summary Sheet (Negotiated Hourly Rates of Pay) RH2 Engineering, Inc., Fee Schedule Exhibit A August 16, 2021 RH2 Engineering, Inc. 22722 29th Drive SE, Suite 210 Bothell, WA 98021 Subject: Acceptance FYE 2020 ICR Audit Office Review Dear Myra Sachs: 20 Indirect Cost Rate (ICR) of 195.10% of direct labor. This rate will be applicable for WSDOT Agreements and Local Agency Contracts in Washington only. This rate may be subject to additional review if considered necessary by WSDOT. Your ICR must be updated on an annual basis. Costs billed to agreements/contracts will still be subject to audit of actual costs, based on the terms and conditions of the respective agreement/contract. This was not a cognizant review. Any other entity contracting with your firm is responsible for determining the acceptability of the ICR. If you have any questions, feel free to contact our office at (360) 705-7019 or via email consultantrates@wsdot.wa.gov. Regards; ERIK K. JONSON Contract Services Manager EKJ:mya Exhibit A Exhibit A Exhibit A