Loading...
HomeMy WebLinkAbout2022-02, Updating the City's Transportation Benefit District, TBD, residential street overlay program, repeals Transportation Benefit District Resolution 2021-13City of East Wenatchee Resolution 2022-02 with Exhibit A Retain Resolution until no longer needed for City-business, then transfer to Washington State Archives (GS50-05A-16 Rev. 1) Page 1 of 3 RESOLUTION NO. 2022-02 A RESOLUTION OF THE CITY OF EAST WENATCHEE, WASHINGTON UPDATING THE CITY’S RESIDENTIAL STREET OVERLAY PROGRAM. 1. Alternate format. 1.1. Para leer este documento en un formato alternativo (español, Braille, leer en voz alta, etc.), comuníquese con la secretaria de la Ciudad en alternateformat@eastwenatcheewa.gov, al (509) 884-9515 o al 711 (TTY). 1.2. To read this document in an alternate format (Spanish, Braille, read aloud, etc.), please contact the City Clerk at alternateformat@east-wenatchee.com, at (509) 884-9515, or at 711 (TTY). 2. Authority. 2.1. RCW 35A.11.020 and RCW 35A.12.190 authorize the City Council to organize and regulate its internal affairs and to define the powers, functions and duties of its officers and employees. THE CITY COUNCIL OF THE CITY OF EAST WENATCHEE DO RESOLVE AS FOLLOWS: 3. Repeal Resolution 2021-13. This resolution repeals the Transportation Benefit District Resolution 2021-13. 4. Designation of Transportation Improvement Projects. The East Wenatchee City Council designates the transportation improvement projects set forth in Exhibit A as the projects the City intends to finance with the revenue generated by the vehicle license fee it imposed. The City Council may update the improvement projects set forth in Exhibit A from time to time. Allowable expenses of an improvement project include all necessary expenses for: acquisition of property; inspection and testing; administration and relocation; and all design, engineering, legal, financial, architectural, and planning costs. The cost of replacing equipment is not an allowable expense. City of East Wenatchee Resolution 2022-02 with Exhibit A Retain Resolution until no longer needed for City-business, then transfer to Washington State Archives (GS50-05A-16 Rev. 1) Page 2 of 3 5. Cost of Improvement Projects. The City Council estimates the cost of the improvement projects will be about $1.55 Million. 6. Priority of Improvement Projects. Although Exhibit A sets forth the anticipated order that the improvement projects will be completed, the City Council retains discretion to determine the exact location and specifications of an improvement project, as well as the timing, order and manner of completing and improvement project. If the City Council complies with its material change policy and if the City Council complies with the notice, hearing, and other procedures described in Chapter 36.73 (including RCW 36.73.050(2)(b), the City Council may alter; make substitutions to and amend the description of an improvement project as it determines is in the best interests of the City 7. Severability. If a court of competent jurisdiction declares any provision in this Resolution to be contrary to law, such declaration shall not affect the validity of the other provisions of this Resolution. 8. Effective Date. This Resolution becomes effective immediately. Passed by the City Council of East Wenatchee, at a regular meeting thereof on this 18th day of January, 2022. Transportation Benefit District Project List and Schedule Construction Annual Year Project Name From To 2021 Cost Estimate Year Cost Program Cost 2022 Terrace Court NE 13th St NE Terminus 120,000$ 120,000$ 2022 Terrace Drive Terrace Ct NE N Devon Ave 45,000$ 45,000$ 2022 14th St NE Terrace Ct NE N Devon Ave 45,000$ 45,000$ 2022 Capri Drive 14th St NE Terminus 45,000$ 45,000$ 2022 Pavement Ratings NA NA 6,000$ 6,000$ 261,000$ 2023 Pavement Ratings NA NA 6,000$ 6,240$ 2023 Pavement Treatment Various Various 150,000$ 156,000$ 162,240$ 2024 Parkroy Place S Iowa Ave S Jarvis Ave 120,000$ 129,792$ 2024 Dale St SE S Iowa Ave S Kansas Ave 200,000$ 216,320$ 2024 S Kansas Ave 2nd St SE 3rd St SE 61,000$ 65,978$ 412,090$ 2025 N Ashland Ave 13th St NE 15th St NE 75,000$ 84,365$ 2025 14th St NE Arbor Terrace N Baker Ave 165,000$ 185,603$ 2025 N Aurora Ave 14th St NE 15th St NE 78,000$ 87,739$ 357,707$ 2026 S Jarvis Ave 1st St SE 2nd St SE 84,000$ 98,268$ 2026 2nd St SE S Jarvis Ave S Keller Ave 225,000$ 263,218$ 361,486$ Total:1,554,523$ Exhibit A 15th St NE Vall ey Mall Pkwy Rock I sl and RdS Kentucky AveMisawaW ay Highline Dr8th St NE 4th St SE 8th St NE N Kentucky Ave3rd St SE 19th St NE19th St NW 5th St NEEastmont Ave9 th S t N E Grant RdSR-28¯0 0.5 10.25 Miles City of East Wenatchee Future TBD Overlays This map is for general purposes only. The City of East Wenatchee makes no representation as to the accuracy or current condition of the data shown on this map. Legend 2022 2024 2025 2026 City Limits Exhibit B