HomeMy WebLinkAbout2022-02, Updating the City's Transportation Benefit District, TBD, residential street overlay program, repeals Transportation Benefit District Resolution 2021-13City of East Wenatchee Resolution 2022-02 with Exhibit A
Retain Resolution until no longer needed for City-business, then transfer to
Washington State Archives (GS50-05A-16 Rev. 1)
Page 1 of 3
RESOLUTION NO. 2022-02
A RESOLUTION OF THE CITY OF EAST WENATCHEE, WASHINGTON
UPDATING THE CITY’S RESIDENTIAL STREET OVERLAY PROGRAM.
1. Alternate format.
1.1. Para leer este documento en un formato alternativo (español, Braille, leer en
voz alta, etc.), comuníquese con la secretaria de la Ciudad en
alternateformat@eastwenatcheewa.gov, al (509) 884-9515 o al 711 (TTY).
1.2. To read this document in an alternate format (Spanish, Braille, read aloud,
etc.), please contact the City Clerk at alternateformat@east-wenatchee.com,
at (509) 884-9515, or at 711 (TTY).
2. Authority.
2.1. RCW 35A.11.020 and RCW 35A.12.190 authorize the City Council
to organize and regulate its internal affairs and to define the powers,
functions and duties of its officers and employees.
THE CITY COUNCIL OF THE CITY OF EAST WENATCHEE DO RESOLVE
AS FOLLOWS:
3. Repeal Resolution 2021-13.
This resolution repeals the Transportation Benefit District Resolution
2021-13.
4. Designation of Transportation Improvement Projects.
The East Wenatchee City Council designates the transportation improvement
projects set forth in Exhibit A as the projects the City intends to finance with
the revenue generated by the vehicle license fee it imposed. The City Council
may update the improvement projects set forth in Exhibit A from time to time.
Allowable expenses of an improvement project include all necessary expenses
for: acquisition of property; inspection and testing; administration and
relocation; and all design, engineering, legal, financial, architectural, and
planning costs. The cost of replacing equipment is not an allowable expense.
City of East Wenatchee Resolution 2022-02 with Exhibit A
Retain Resolution until no longer needed for City-business, then transfer to
Washington State Archives (GS50-05A-16 Rev. 1)
Page 2 of 3
5. Cost of Improvement Projects.
The City Council estimates the cost of the improvement projects will be about
$1.55 Million.
6. Priority of Improvement Projects. Although Exhibit A sets
forth the anticipated order that the improvement projects will be
completed, the City Council retains discretion to determine the exact
location and specifications of an improvement project, as well as the
timing, order and manner of completing and improvement project.
If the City Council complies with its material change policy and if the
City Council complies with the notice, hearing, and other procedures
described in Chapter 36.73 (including RCW 36.73.050(2)(b), the
City Council may alter; make substitutions to and amend the description
of an improvement project as it determines is in the best interests
of the City
7. Severability.
If a court of competent jurisdiction declares any provision in this Resolution to
be contrary to law, such declaration shall not affect the validity of the other
provisions of this Resolution.
8. Effective Date.
This Resolution becomes effective immediately.
Passed by the City Council of East Wenatchee, at a regular meeting thereof on
this 18th day of January, 2022.
Transportation Benefit District
Project List and Schedule
Construction Annual
Year Project Name From To 2021 Cost Estimate Year Cost Program Cost
2022 Terrace Court NE 13th St NE Terminus 120,000$ 120,000$
2022 Terrace Drive Terrace Ct NE N Devon Ave 45,000$ 45,000$
2022 14th St NE Terrace Ct NE N Devon Ave 45,000$ 45,000$
2022 Capri Drive 14th St NE Terminus 45,000$ 45,000$
2022 Pavement Ratings NA NA 6,000$ 6,000$ 261,000$
2023 Pavement Ratings NA NA 6,000$ 6,240$
2023 Pavement Treatment Various Various 150,000$ 156,000$ 162,240$
2024 Parkroy Place S Iowa Ave S Jarvis Ave 120,000$ 129,792$
2024 Dale St SE S Iowa Ave S Kansas Ave 200,000$ 216,320$
2024 S Kansas Ave 2nd St SE 3rd St SE 61,000$ 65,978$ 412,090$
2025 N Ashland Ave 13th St NE 15th St NE 75,000$ 84,365$
2025 14th St NE Arbor Terrace N Baker Ave 165,000$ 185,603$
2025 N Aurora Ave 14th St NE 15th St NE 78,000$ 87,739$ 357,707$
2026 S Jarvis Ave 1st St SE 2nd St SE 84,000$ 98,268$
2026 2nd St SE S Jarvis Ave S Keller Ave 225,000$ 263,218$ 361,486$
Total:1,554,523$
Exhibit A
15th St NE
Vall
ey
Mall Pkwy
Rock
I
sl
and RdS Kentucky AveMisawaW
ay
Highline Dr8th St NE
4th St SE
8th St NE
N Kentucky Ave3rd St SE
19th St NE19th St NW
5th St NEEastmont Ave9 th S t N E
Grant RdSR-28¯0 0.5 10.25 Miles
City of East Wenatchee
Future TBD Overlays
This map is for general purposes only. The City of East Wenatchee makes no
representation as to the accuracy or current condition of the data shown on this map.
Legend
2022
2024
2025
2026
City Limits
Exhibit B