Scope of Work – Supplement No. 3
City of East Wenatchee
Sterling Intermediate Safe Routes to School
Project Number SRTS-9909(004)
KPG Project Number 19068B
October 5, 2021
Introduction and Background
The project as described in the original scope of work has progressed to the 60% design level and
includes the minor project scope changes which have been approved by WSDOT and are defined
in the current WSDOT STIP. The project currently has NEPA CE approval and is ready to progress
to the RW Phase.
x Current design detail provided by the 60% Plans provides the basis scoping for the RW
Phase as defined in Task 6A and Task 6B of this supplemental scope of work.
x The geotechnical report identified soil properties that do not meet the requirements for
use of WSDOT standard illumination foundations. Task 9B has been added to provide for
structural foundation design.
x The project duration has been extended to target construction in 2023. Additional work
associated with project management for the extended project duration has been defined in
Task 1 of this supplemental scope of work.
The scope of work is supplemented to include the following additional work:
TASK 1 – PROJECT MANAGEMENT
Consultant Responsibilities:
1. Provide an additional 12 months of contract administration and management, including:
billing, accounting, auditing, and monthly progress reports.
2. Provide an additional 12 months of project coordination and management of design
schedule, including internal resource management, subconsultant management, and
prioritization of resources.
3. Facilitate an additional 12 months of client coordination meetings.
Assumptions:
1. Assume an additional 12 months of contract duration.
Page | 2
23 Wenatchee Ave, Suite 223, Wenatchee, WA 98801 P: 509.663.2711 www.kpg.com
(NEW) TASK 6A – RIGHT OF WAY ACQUISITION (Subconsultant)
Objective: Tierra Right of Way Services Ltd. will perform acquisition services in accordance with
Federal, State, and local laws, including the Uniform Act, WSDOT Right of Way Manual, Local Agency
Guidelines manual, and Chapter 8.26 RCW.
Subconsultant Responsibilities:
1. Project Kickoff - Facilitate a right of way phase kickoff meeting. Tierra will use WSDOT LAC
FHWA approved templates as indicated in Tierra’s subconsultant scope of work.
2. Title Review - Conduct initial review of title reports to assess potential complications at
closing and potential conflicts from utility encumbrances, etc., that may pose obstacles or
delays to the acquisition closing process.
3. Valuation - Using an appraisal service, finalize a Right of Way Funding Estimate (ROWFE)
and Administrative Offer Summaries (AOS) appraisal reports.
4. Encroachments - Identify any possible encroachments that will need to be addressed prior
to the project being WSDOT Certified. Tierra agents will work the project team and with
property owners to resolve.
5. Negotiations – Tierra agents will perform and oversee property negotiations for up to 13
parcels. The offer package documents will be presented in person if possible. An out-of-
area owner will be contacted by telephone and by certified mail. Tierra will:
x Review parcel maps, title reports, and prepare each file electronically and
physically.
x Prepare 13 document packages for City review, and upon approval, promptly
present document package for the required real property interests.
x Document package will include AOS, conveyance instruments, exhibits, and other
related acquisition documents using WSDOT/City approved forms.
x Tierra will contact the property owners and meet the owner in person to present
and to discuss the project. After the package is presented to each property owner,
Tierra will attempt to make three in-person meetings with a property owner and
five follow up conversations, which will be via email or phone conversation, to
complete negotiations.
x Prepare file for closing.
x Prepare and maintain diaries.
x Prepare and provide status updates bi-weekly or per the request of the City/KPG.
x Upon receipt of signed conveyance documents, Tierra will forward the documents
to the City/KPG.
x Agent QA files for submittal to Project Manager.
6. Project Management – Tierra will:
x Report acquisition status bi-weekly
x Provide project management in coordination with City staff
x Monitor project budget and schedule
Page | 3
23 Wenatchee Ave, Suite 223, Wenatchee, WA 98801 P: 509.663.2711 www.kpg.com
x Oversee Appraisal process, monitor budget and schedule
x QC offer packages prior to submitting to City/KPG for approval
x QC files prior to submittal to the City at completion
x Assist the City with the WSDOT Certification process.
Assumptions:
1. No narrative appraisal reports will be needed, if any are needed, an amendment will be
needed to support a supplemental scope of work.
2. Tierra’s schedule goal will be to have all rights of way acquired within nine (9) months from
the notice to proceed.
3. A maximum of three documented attempts in person and a maximum of five additional
attempts will be over the telephone, via email, and/or mail to successfully acquire each
parcel.
4. Whenever possible, owners residing locally will be presented their offers in person. Tierra
will mail offers to owners located outside of a 50-mile radius from the project area.
5. There are no more than two principal owners of any parcel and that both are
geographically located very near to each other.
6. Any delay in the project or City deliverables, design, or design changes will delay Tierra’s
project schedule.
7. If any additional parcels or work is required that is not identified in this scope of work, an
amendment for supplemental scope of work will be needed.
8. Any vesting clouds discovered after title review may cause significant delays on conveyance
recording.
9. If occupants (personal property or persons) are identified during the interview stage, Tierra
will interview that occupant at the earliest possible time and inform the City of the
presence of a displacement. An amendment for supplemental scope of work will be
needed if relocation services are needed.
10. The Tierra scope of work under this task does not include title, escrow, or recording fees,
survey, development of legal descriptions, or exhibits.
City Responsibilities:
1. Assist with obtaining contact information for the property owners and occupants
2. Upon receipt of the title review memorandum from Tierra, the City will decide which
encumbrances need to be cleared. This may involve a discussion of risk as related to
existing Deeds of Trust and/or other monetary encumbrances.
3. Provide conveyance documents and the pertinent detail for said documents the City
prefers to use.
Deliverables:
1. Summary/synopses of title report review.
Page | 4
23 Wenatchee Ave, Suite 223, Wenatchee, WA 98801 P: 509.663.2711 www.kpg.com
2. Final Right of Way Funding Estimate (ROWFE).
3. Administrative Offer Summaries (AOS) appraisal reports.
4. List summary of right of way encroachments and resolutions.
5. 13 document packages for negotiation using WSDOT approved forms.
6. Prepare files for closing
7. Diaries
8. Bi-weekly status updates
9. Agent QA files
10. Tierra will work with the title/escrow Company to obtain release documentation from the
encumbrances of public record that are not acceptable to provide clear title to the
property being acquired
11. Tierra will provide up to three (3) attempts in person and five (5) follow up conversations
via email or telephone. General acquisition/negotiation communications with owner.
12. Attend conference calls with KPG/City as needed/requested.
13. Complete parcel files, including necessary records of all ROW Acquisition services.
(NEW) TASK 6B – RIGHT OF WAY ACQUISTION (KPG Design Support)
Objective: Provide engineering and design assistance to attend meetings with property owners,
communicate the design, answer design questions, generate figures, explore design alternatives,
and manage the overall effort to support completion of the right of way process.
Consultant Responsibilities:
1. Attend meetings with property owners (either in person and on site or virtual),
communicate and explain design elements and provide other design and engineering
related information as needed to support the right of way process.
2. Make design revisions, develop alternatives, and produce simple figures as needed to
support the right of way process.
3. Provide subconsultant management and provide overall coordination with City, property
owners, WSDOT, and other agencies as needed to complete the right of way process.
Assumptions:
1. Assume no more than one (1) meeting per effected parcel.
2. Assume no more than one (1) figure per effected parcel.
City Responsibilities:
1. City will facilitate coordination with property owners, tenants, and WSDOT, as necessary to
complete right of way acquisition and WSDOT certification of the right of way.
2. Review right of way documents and provide comments.
Page | 5
23 Wenatchee Ave, Suite 223, Wenatchee, WA 98801 P: 509.663.2711 www.kpg.com
3. Provide direction and facilitation of approvals on issues that require City approval and
input.
Deliverables:
1. Meeting materials, notes, and other documentation as needed.
2. Design updates and figures as needed.
(NEW) TASK 9B – PROJECT STRUCTURAL DESIGN (Subconsultant)
Objective: WSDOT Standard Plan J-28.30 provides standard construction details for luminaire
foundations for luminaires and soils that meet the specific requirements of the design detail.
Geotechnical exploration and analysis revealed existing soil conditions that do not comply with the
minimum requirements specified in Standard Plan J-28.30. Special foundations are required that
are designed for the existing soil conditions. Subconsultant services have been added under this
supplement to provide structural design for illumination.
Subconsultant Responsibilities:
1. The Subconsultant will provide structural engineering design and calculations to support
the development of the design drawings to be produced by KPG. The specific
subconsultant scope or work includes:
x Review of Standard Plan J-28.30 and related standard plans and specifications.
x Review of Geotechnical Report.
x Review of specified luminaires.
x Development of calculations to determine required foundation size and reinforcing.
x Specification and documentation of changes to standard foundation design.
x Coordination and review of drawings produced by KPG to ensure foundation design has
been incorporated accurately.
Assumptions:
1. The following work is excluded from the Subconsultant’s scope of work:
x Luminaire pole and base plate connection design.
x Geotechnical Engineering.
x Surveying.
x Site visits.
x Construction documents, drawings, or specifications.
x Construction phase engineering assistance.
Page | 6
23 Wenatchee Ave, Suite 223, Wenatchee, WA 98801 P: 509.663.2711 www.kpg.com
Deliverables:
1. Subconsultant deliverables include stamped structural calculations and redlined drawings
and specifications to be drafted and incorporated into the construction documents by KPG.
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
Tierra Right of Way Services, Ltd.
Leslie Findlay, Designated Broker
8685 Martin Way East, Suite 203 ● Lacey, Washington 98516 ● Phone: 206.363.1556
Right of Way ● Cultural Resources ● Environmental Planning
Toll Free: 800.887.0847 ● www.tierra-row.com
September 17, 2021
Josh Fedora, PE
KPG
23 S. Wenatchee Avenue, Suite 223
Wenatchee, WA 98801
Re: City of East Wenatchee, Sterling Intermediate - Safe Routes to Schools
Right of Way Acquisition Services
Dear Josh,
Tierra Right of Way Services, Ltd. (Tierra) is pleased to submit the proposal and cost estimate for the
performance of right of way acquisition services in accordance with federal, state, and local laws,
including the Uniform Act, Washington State Department of Transportation Right of Way Manual,
the Local Agency Guidelines, and Chapter 8.26 RCW.
Due to the labor shortage of experienced professionals in the industry, the pricing contained herein is
valid for 90 calendar days only. Tierra looks forward to working with your team to complete this
project.
Sincerely,
Leslie Findlay, SR/WA, R/W-RAC
Right of Way Operations Manager | Designated Broker, Pacific Northwest
360-870-0190
KPG, City East Wenatchee, Sterling Intermediate - Safe Routes to School
Right of Way Acquisition Services
19WR00-416.01
2
SCOPE OF WORK
KPG has requested that Tierra Right of Way, Ltd. (Tierra) provide a scope of work and fee to
assist in acquiring the real estate interests for the City of East Wenatchee Sterling Intermediate -
Safe Routes to Schools Improvement Project. Tierra will perform acquisition services in
accordance with Federal, State, and local laws, including the Uniform Act, WSDOT Right of
Way Manual, Local Agency Guidelines manual, and Chapter 8.26 RCW.
Our scope and fee include, but is not limited to, the following tasks:
x PROJECT KICKOFF – Tierra to attend kick off meeting to obtain further project
background. Tierra will use WSDOT LAC FHWA approved templates which
are located at: http://www.wsdot.wa.gov/LocalPrograms/ROWServices/LPA-
forms.htm. Other project meetings to be scheduled as needed.
x TITLE – KPG or the City will provide the necessary title commitments, which is
necessary to confirm ownerships before offers and negotiations are conducted and
prior to recording any conveyance documents. Tierra will conduct initial review of
report to assess potential complications at closing and potential conflicts from
utility encumbrances, etc., that may pose obstacles or delays to the acquisition
closing process. This information will be shared with the City in the form of a
summary/synopses and Tierra will work with the escrow company to resolve any
further action necessary.
x VALUATION – Tierra will contract with Pacific Appraisal and Associates to
produce a Right of Way Funding Estimate (ROWFE) for the proposed project
impacts and Administrative Offer Summaries (AOS) appraisal reports. We do
not anticipate any narrative appraisal reports will be needed, if any are, an
amendment to this scope and fee would be required.
x ENCROACHMENTS – Tierra with KPG will identify any possible
encroachments that will need to be addressed prior to the project being WSDOT
Certified. Tierra agents will work with property owners to resolve.
x NEGOTIATIONS – Tierra agents will perform and oversee property
negotiations for up to 13 parcels. The offer package documents will be
presented in person if possible. An out-of-area owner will be contacted by
telephone and by certified mail.
o Tierra will:
▪ Review, parcel map(s), title report(s) and prepare each file electronically and
physically.
▪ Prepare 13 document packages for City review, and upon approval,
promptly present document package for the required real property
interests.
▪ Document package to include AOS, conveyance instruments, exhibits and
other related acquisition documents using WSDOT/City approved forms.
o Offer Presentation: Tierra will contact the property owners and meet the
KPG, City East Wenatchee, Sterling Intermediate - Safe Routes to School
Right of Way Acquisition Services
19WR00-416.01
3
owner in person to present to discuss the project. After the package is
presented to each property owner, Tierra will attempt to make three “in-
person” meetings with a property owner and five follow up conversations,
which will be via email or phone conversation, to complete negotiations.
o Prepare file for closing.
o Prepare and maintain diaries.
o Prepare and provide status updates bi-weekly or per the request of the City/KPG.
o Upon receipt of signed conveyance documents, Tierra will forward the
documents to the City/KPG.
o Agent QA files for submittal to Project Manager.
x PROJECT MANAGEMENT
o Tierra to report acquisition status bi-weekly.
o Provide project management in coordination with City staff.
o Monitor project budget and schedule.
o Oversee Appraisal process, monitor budget and schedule.
o QC offer packages prior to submitting to KPG/City for approval.
o QC files prior to scanned submittal to the City at completion.
o Assist the City with the WSDOT Certification process.
x PROJECT SCHEDULE – It is anticipated that the project will go to construction in the
spring of 2023. Our goal is to have all rights of way acquired within nine (9) months from
the notice to proceed.
Tierra Deliverables:
x Tierra work with the title/escrow Company to obtain release documentation
from the encumbrance(s) of public record that are not acceptable to provide
clear title to the property being acquired.
x Prepare 13 acquisition files for negotiations, utilizing WSDOT approved forms.
x Provide up to three attempts in person and five follow up conversations via email
or telephone. General acquisition/negotiation communications with owner.
x Attend conference calls with the KPG/City as needed.
x Complete, QC’d parcel files, including necessary records of all ROW Acquisition services.
x Provide status reports bi-weekly or as requested.
KPG/City will provide Tierra with the following prior to the commencement of any activities:
x Any contact information for the property owners and occupants.
x Upon receipt of the title review memorandum from Tierra, the City will decide
which encumbrances need to be cleared. This may involve a discussion of risk as
related to existing Deeds of Trust and/or other monetary encumbrances.
x WSDOT approved Right of Way Plan sheets.
x Final signed legal description and parcel map exhibits for each parcel.
x Provide conveyance documents and the pertinent detail for said documents the
City prefers to use.
x Provide the project schedule updates.
and
KPG, City East Wenatchee, Sterling Intermediate - Safe Routes to School
Right of Way Acquisition Services
19WR00-416.01
4
x Parcel title reports.
The deliverable hours and cost provided contain the following assumptions:
x All mileage expenses will be invoiced to the Client at the IRS established rate. Actual
mileage may be more or less than what is estimated herein.
x A maximum of three documented attempts in person and a maximum of five additional
attempts will be over the telephone, via email, and/or mail to successfully acquire each
parcel.
x Whenever possible, owners residing locally will be presented their offers in person. Tierra
will mail offers to owners located outside of a 50-mile radius from the project area.
x There are no more than two principal owners of any parcel and that both are
geographically located very near to each other.
x Any delay in KPG/City deliverables, design or design changes will delay Tierra's project
schedule.
x Any changes in plans that impact the acquisition area after appraisal has commenced will
result in a price increase from the appraiser and a delay in the project schedule.
x If any additional parcels or work is required that is not identified in this scope of work, an
amendment will be required.
x Any vesting clouds discovered after title review may cause significant delays on conveyance
recording.
x If occupants (personal property or persons) are identified during the interview stage, Tierra
will interview that occupant at the earliest possible time and inform the City of the presence
of a displacement. The City agrees to additional charges for relocation services should this
occur and an amendment to the scope and contract will be required.
x Any change in the client’s main point of contact, project manager, or other related
leadership position will likely result in increased fees due to changes in management and
communication styles, changes in agreed to reporting, changes in forms, and the new
project team member not fully understanding the scope of work contracted for.
x Price does not include title, escrow or recording fees, survey, the development of legal
descriptions, or exhibits.
x Due to the labor shortage of experienced professionals in the industry, the pricing
contained herein is valid for 90 calendar days only.
x COVID-19 safety protocols will be adhered to.
KPG, City East Wenatchee, Sterling Intermediate - Safe Routes to School
Right of Way Acquisition Services
19WR00-416.01
5
CONSULTANT FEE DETERMINATION - SUMMARY OF PROJECT COSTS
Labor Classification Hours
Direct
Salary OH Fixed Fee Total Total Amount
Project management, 13 Acquisitions
Direct Rate 136.91%30.00%Billing Rate
Division Manager 2 $ 69.72 $ 95.45 $ 20.92 $ 186.09 372.18$
ROW Division Manager 24.00 $ 59.23 $ 81.09 $ 17.77 $ 158.09 3,794.18$
Project Manager 120.00 $ 52.88 $ 72.40 $ 15.86 $ 141.14 16,937.04$
Senior Right of Way Agent 440.00 $ 45.67 $ 62.53 $ 13.70 $ 121.90 53,635.03$
Adm. Project Coordinator 75.00 $ 27.00 $ 36.97 $ 8.10 $ 72.07 5,404.93$
Right of Way Technician 130.00 $ 25.00 $ 34.23 $ 7.50 $ 66.73 8,674.58$
791 88,817.93$
Direct Reimbursables
13 AOS's
Travel (Mileage): 300 Miles 0.56$ 168.00$
Postage 20 Each 7.50$ 150.00$
Pacific Appraisal 13 Each 1,500.00$ 19,500.00$
Direct Reimbursables Subtotal:19,818.00$
Total Maximum Amount Payable 108,635.93$
Task Order Total Maximum - Rounded 108,635.93$
City of East Wenatchee, Sterling - Safe Routes
Tierra Right of Way Services, Ltd.
6HSWHPEHU
7LHUUD5LJKWRI:D\6HUYLFHV/WG
(5LYHU5RDG6WH
7XFVRQ$=
6XEMHFW$FFHSWDQFH)<(,&5$XGLW2IILFH5HYLHZ
'HDU.HLWK*DQVNH
,QGLUHFW&RVW5DWH,&5RIRIGLUHFWODERUUDWHLQFOXGHV
)DFLOLWLHV&DSLWDO&RVWRI0RQH\7KLVUDWHZLOOEHDSSOLFDEOHIRU:6'27
$JUHHPHQWV DQG/RFDO$JHQF\&RQWUDFWVLQ:DVKLQJWRQ RQO\7KLVUDWHPD\EHVXEMHFW
WRDGGLWLRQDOUHYLHZLIFRQVLGHUHGQHFHVVDU\E\:6'27<RXU,&5PXVWEHXSGDWHGRQ
DQDQQXDOEDVLV
&RVWVELOOHGWRDJUHHPHQWVFRQWUDFWVZLOOVWLOOEHVXEMHFWWRDXGLWRIDFWXDOFRVWVEDVHG
RQWKHWHUPVDQGFRQGLWLRQVRIWKHUHVSHFWLYHDJUHHPHQWFRQWUDFW
7KLV ZDV QRW DFRJQL]DQW UHYLHZ $Q\ RWKHUHQWLW\ FRQWUDFWLQJZLWK \RXUILUP LV
UHVSRQVLEOHIRUGHWHUPLQLQJWKHDFFHSWDELOLW\RIWKH,&5
,I\RXKDYHDQ\TXHVWLRQVIHHOIUHHWRFRQWDFWRXURIILFHDWRUYLDHPDLO
FRQVXOWDQWUDWHV#ZVGRWZDJRY
5HJDUGV
(5,..-21621
&RQWUDFW6HUYLFHV0DQDJHU
(.-DK
6RXWK&ROXPELD6WUHHW6XLWHO:HQDWFKHH:$,3O)OZZZSDFLILFHQJLQHHULQJQHW
$XJXVW
-RVK)HGRUD
.3*(QJLQHHULQJ
6RXWK:HQDWFKHH$YH6WH
:HQDWFKHH:$
352-(&7 6WHUOLQJ/XPLQDLUH)RXQGDWLRQ
3URMHFW1R6$
68%-(&7 6WUXFWXUDO(QJLQHHULQJ)HH3URSRVDO
'HDU-RVK
3HU\RXUUHTXHVWZHKDYHUHYLHZHGWKHSUHOLPLQDU\GUDZLQJVDQGLQIRUPDWLRQ\RXSURYLGHGDQG
KDYHSUHSDUHGWKHIROORZLQJ6WUXFWXUDO(QJLQHHULQJ)HH3URSRVDOIRUWKH6WHUOLQJ/XPLQDLUH
)RXQGDWLRQGHVLJQ
352-(&7'(6&5,37,21
,WLVRXUXQGHUVWDQGLQJWKDWWKHSURMHFWLQYROYHVWKHLQVWDOODWLRQRIQHZURDGZD\OXPLQDLUHVDV
SDUWRIWKH6DIH5RXWHVWR6FKRROSURMHFWIRU6WHUOLQJ,QWHUPHGLDWH0LGGOH6FKRROLQ(DVW
:HQDWFKHH:$:6'276WDQGDUG3ODQ-SURYLGHVVWDQGDUGFRQVWUXFWLRQGHWDLOVIRU
OXPLQDLUHIRXQGDWLRQVIRUOXPLQDLUHVDQGVRLOVPHHWLQJVSHFLILFUHTXLUHPHQWV7KHJHRWHFKQLFDO
UHSRUWKDVLGHQWLILHGH[LVWLQJVRLOFRQGLWLRQVWKDWGRQRWFRPSO\ZLWKWKHPLQLPXPUHTXLUHPHQWV
VSHFLILHGLQ6WDQGDUG3ODQ-DQGWKHUHIRUHVSHFLDOIRXQGDWLRQVDUHUHTXLUHGWKDWDUH
GHVLJQHGIRUWKHH[LVWLQJVRLOFRQGLWLRQV
6&23(2):25.
7KHVFRSHRIZRUNLQFOXGHVWKHIROORZLQJVWUXFWXUDOHQJLQHHULQJFRQVXOWLQJVHUYLFHV
• 5HYLHZRI6WDQGDUG3ODQ-DQGUHODWHGVWDQGDUGSODQVDQGVSHFLILFDWLRQV
• 5HYLHZRI*HRWHFKQLFDO5HSRUW
• 5HYLHZRIVSHFLILHGOXPLQDLUHV
• 'HYHORSPHQWRIFDOFXODWLRQVWRGHWHUPLQHUHTXLUHGIRXQGDWLRQVL]HDQGUHLQIRUFLQJ
• 6SHFLILFDWLRQDQGGRFXPHQWDWLRQRIFKDQJHVWRVWDQGDUGIRXQGDWLRQGHVLJQ
• &RRUGLQDWLRQDQGUHYLHZRIGUDZLQJVSURGXFHGE\.3*WRHQVXUHIRXQGDWLRQGHVLJQKDV
EHHQLQFRUSRUDWHGDFFXUDWHO\
([FOXGHGIURPWKHVFRSHRIZRUNDUH
• /XPLQDLUHSROHDQGEDVHSODWHFRQQHFWLRQGHVLJQ
• *HRWHFKQLFDO(QJLQHHULQJ
• 6XUYH\LQJ
• 6LWHYLVLWV
• &RQVWUXFWLRQGRFXPHQWVGUDZLQJVRUVSHFLILFDWLRQV
• &RQVWUXFWLRQSKDVHHQJLQHHULQJDVVLVWDQFH
-RVK)HGRUD
6WUXFWXUDO(QJLQHHULQJ)HH3URSRVDO
$XJXVW
3URMHFW1R6$
3DJHRI
'(/,9(5$%/(6
'HOLYHUDEOHVLQFOXGHVWDPSHGVWUXFWXUDOFDOFXODWLRQVDQGUHGOLQHGGUDZLQJVDQGVSHFLILFDWLRQVWR
EHGUDIWHGDQGLQFRUSRUDWHGLQWRWKHFRQVWUXFWLRQGRFXPHQWVE\.3*
6&+('8/(
:HDQWLFLSDWHDWZRWRWKUHHZHHNWXUQDURXQGIURPQRWLFHWRSURFHHG7KLVVXJJHVWHGWLPHIUDPH
UHIOHFWVRXUFXUUHQWZRUNORDG'HOD\LQDXWKRUL]DWLRQPD\UHVXOWLQDPRGLILHGVFKHGXOHHVWLPDWH
)(((67,0$7(
3D\PHQWVIRUVHUYLFHVZLOOEHRQDWLPHDQGH[SHQVHEDVLVLQDFFRUGDQFHZLWKWKHDWWDFKHG17(
5DWH6FKHGXOH$QHVWLPDWHRIWKHHQJLQHHULQJHIIRUWUHTXLUHGLVDQWLFLSDWHGLQWKHDPRXQWRI
7KHSURSRVHGIHHLVDQHVWLPDWHIRUZRUNHIIRUWOLVWHGLQWKH6FRSHRI:RUN7KHDFWXDOIHHPD\
EHJUHDWHUWKDQRUOHVVWKDQWKLVHVWLPDWH&RQVWUXFWLRQ3KDVHVHUYLFHVDUHQRWLQFOXGHGLQWKLV
SURSRVDO,IDXWKRUL]HGE\WKHFOLHQW3DFLILFZLOOSURYLGHWKHVHVHUYLFHVRQDWLPHDQGH[SHQVH
EDVLV&RQVWUXFWLRQ3KDVHVHUYLFHVLQFOXGHVKRSGUDZLQJUHYLHZUHVSRQVHWR5),VDQG
FRQWUDFWRUTXHVWLRQVVLWHYLVLWVGXULQJFRQVWUXFWLRQDQGDGGLWLRQDOGHVLJQRUUHGHVLJQDVD
UHVXOWRIFRQWUDFWRUHUURUVRUUHTXHVWV7KLVSURSRVDOLVYDOLGIRUZRUNFRPSOHWHGWKUXWKHHQGRI
:RUNSHUIRUPHGLQ\HDUVVXEVHTXHQWWRZLOOEHLQYRLFHGSHUWKHIHHVFKHGXOHFXUUHQW
WRWKH\HDULQZKLFKVHUYLFHVDUHSHUIRUPHG
7(&+1,&$/&/$5,),&$7,216
,192,&,1*
6HUYLFHVZLOOEHLQYRLFHGRQDPRQWKO\EDVLVRQDFWXDOKRXUVZRUNHG$OOLQYRLFHVDUHGXHXSRQ
UHFHLSWDQGZLOOEHDVVHVVHGDODWHSD\PHQWFKDUJHRISHUPRQWKLIQRWSDLGZLWKLQGD\V
RIWKHLQYRLFHGDWH,I3DFLILFLVQRWSDLGZKHQGXH3DFLILFPD\VXVSHQGRUWHUPLQDWHVHUYLFHV
DQGDOOFRSLHVRIDQ\UHSRUWVSODQVVSHFLILFDWLRQVDQGRWKHUGRFXPHQWVSUHSDUHGE\3DFLILF
XQGHUWKLVDJUHHPHQWZLOOEHUHWXUQHGWR3DFLILFDQGWKHVHGRFXPHQWVZLOOQRWEHUHOLHGXSRQLQ
DQ\IDVKLRQ3DFLILFUHWDLQVDOOULJKWVWRFODLPDJDLQVWSHUIRUPDQFHERQGVOLHQSURSHUW\DQG
RWKHUPHDVXUHVWRUHFHLYHSD\PHQWIRUVHUYLFHVUHQGHUHG
(;75$6(59,&(6
,IH[WUDVHUYLFHVRXWVLGHWKHVFRSHRIZRUNDUHUHTXHVWHGZHZLOOGHWHUPLQHWKHHVWLPDWHGIHHV
DVVRFLDWHGZLWKWKHH[WUDVHUYLFHVDQGFRPPXQLFDWHWKLVWR\RXVRWKDW\RXFDQGHFLGHZKHWKHU
WRDGGWKHH[WUDVHUYLFHDQGIHHVWRWKHEXGJHW,QDGGLWLRQWRWKHH[FOXGHGVHUYLFHVOLVWHGLQWKH
6&23(2):25.H[WUDVHUYLFHVWKDWDUHQRWLQFOXGHGLQWKHVFRSHRIZRUNLQFOXGHVLJQLILFDQW
FKDQJHVLQVFRSHDGGLWLRQDOUHTXHVWHGLWHPVDGGLWLRQDOGHVLJQRUUHGHVLJQDQGGHWDLOLQJ
SUHGLFDWHGRQFRQWUDFWRU¶VHUURUVRUUHTXHVW
6LQFHUHO\
0LFDK)ORUHD6(
6WUXFWXUDO(QJLQHHU3ULQFLSDO
$WWDFKPHQWV
)((6&+('8/(
/DERU&ODVVLILFDWLRQ /DERU5DWH
,QGLUHFW&RVW
5DWH)L[HG)HH 17(5DWH
6(1,25&,9,/(1*,1((5
6(1,256758&785$/(1*,1((5
6(1,25352)(66,21$/(1*,1((5
6758&785$/(1*,1((5
352)(66,21$/(1*,1((5,,,
352)(66,21$/(1*,1((5,,
352)(66,21$/(1*,1((5,
(1*,1((5,175$,1,1*,,
(1*,1((5,175$,1,1*,
7(&+1,&,$1,9
7(&+1,&,$1,,,
7(&+1,&,$1,,
7(&+1,&,$1,
352-(&7$'0,1,675$725)81',1*63(&,$/,67
6(&5(7$5<$'0,1,675$7,21
$YHUDJHODERUUDWH
(;3(16(6&RVW
0,/($*(SHUPLOH
6RXWK&ROXPELD6WUHHW6XLWH
:HQDWFKHH:$
,
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
-XQH
5LFK+HQGULFNVRQ3ULQFLSDO
3DFLILF(QJLQHHULQJ 'HVLJQ3//&
6&ROXPELD6W6WH
:HQDWFKHH:$
x 5H3DFLILF(QJLQHHULQJ 'HVLJQ 3//&
6DIH+DUERU,QGLUHFW&RVW5DWH
'HDU0U+HQGULFNVRQ
:DVKLQJWRQ6WDWHKDVUHFHLYHGDSSURYDOIURPRXUORFDO)HGHUDO+LJKZD\$GPLQLVWUDWLRQ)+:$
'LYLVLRQ WRFRQWLQXHDGPLQLVWHULQJ WKH³VDIHKDUERU´LQGLUHFWFRVWUDWHSURJUDPRQHQJLQHHULQJDQG
GHVLJQUHODWHGVHUYLFHFRQWUDFWVDVZHOODVIRU/RFDO3XEOLF$JHQF\SURMHFWV
:HKDYHFRPSOHWHGRXUULVNDVVHVVPHQWIRU3DFLILF(QJLQHHULQJ 'HVLJQ 3//&:HFRQGXFWHGRXU
DVVHVVPHQWEDVHGRQWKHGRFXPHQWDWLRQSURYLGHGE\WKHILUP7KHUHYLHZHGGDWDLQFOXGHGEXWZDVQRW
OLPLWHGWRDGHVFULSWLRQRIWKHFRPSDQ\EDVLVRIDFFRXQWLQJDFFRXQWLQJV\VWHPDQGWKHEDVLVRILQGLUHFW
FRVWV%DVHGRQRXUUHYLHZ\RXUILUPLVHOLJLEOHWRXVHWKH6DIH+DUERUUDWH<RXKDYHRSWHGWRXVHWKH
6DIH+DUERUUDWHUDWKHUWKDQSURYLGHD)$5FRPSOLDQWUDWHDWWKLVWLPH
:HDUHLVVXLQJWKH6DIH+DUERU,QGLUHFW&RVW5DWHRIRIGLUHFWODERU ZLWKDILHOGUDWHZKHUH
DSSOLFDEOHRIRIGLUHFWODERU IRU 3DFLILF(QJLQHHULQJ 'HVLJQ7KH6DIH+DUERUUDWHLVHIIHFWLYH
RQ -XQH
3DFLILF(QJLQHHULQJ 'HVLJQKDVDJUHHGWRLPSURYH,QWHUQDO&RQWUROVDQGWLPHNHHSLQJSURFHVVHVWR EH
DEOHWRGHYHORSDQ,QGLUHFW&RVW5DWH6FKHGXOHLQWKHIXWXUHLQDFFRUGDQFHZLWKWKH )HGHUDO$FTXLVLWLRQ
5HJXODWLRQV)$56XESDUW7KH:6'27,QWHUQDO$XGLW2IILFHKDVSURYLGHGJXLGDQFHDQG
LQIRUPDWLRQUHODWHGWR)$5VDQGWKH$$6+72$XGLW*XLGH<RXPD\XVHWKH6DIH+DUERU5DWHRI
RUIRUILHOGRIILFHVLWXDWLRQVIRUDJUHHPHQWVHQWHUHG SULRUWR-XQH )RUDJUHHPHQWV
HQWHUHG DIWHUWKLVGDWHSOHDVHFRQWDFWWKH:6'27&RQVXOWDQW6HUYLFHV2IILFH&62RURXURIILFHIRU
JXLGDQFH
7KH6DIH+DUERU5DWHZLOOQRW EHVXEMHFWWRDXGLW3OHDVHFRRUGLQDWHZLWK&62RU\RXU/RFDO3URJUDPV
FRQWDFWLI\RXKDYHTXHVWLRQVDERXWZKHQWRDSSO\WKH6DIH+DUERUUDWHWR\RXUDJUHHPHQW
,I\RXKDYHDQ\TXHVWLRQVSOHDVHFRQWDFW6WHYH0F.HUQH\RUPH DW
6LQFHUHO\
6FKDW]LH+DUYH\&3$
$JUHHPHQW&RPSOLDQFH$XGLW0DQDJHU
FF 6WHYH0F.HUQH\'LUHFWRURI,QWHUQDO$XGLW
/DUU\6FKRILHOG06
)LOH
6LQFHUHO\
6FKDW]LH +DUYH\&3$