HomeMy WebLinkAboutResolutions - 2019-03 - Updating the City's residential overlay program material change policy, repeals Resolution 2017-03 - 2/19/2019City of East Wenatchee Resolution 2019-03
Page 1 of 3
Retain Resolution until no longer needed for City-business, then transfer to Washington State Archives (GS50-05A-16 Rev. 1)
City of East Wenatchee, Washington
Resolution No. 2019-03
A Resolution of the City of East Wenatchee, Washington updating
the City’s residential overlay program’s material change policy by
repealing Resolution 2017-03.
1. Alternate format.
1.1. Para leer este documento en otro formato (español, Braille,
leer en voz alta, etc.), póngase en contacto con el vendedor de la
ciudad al alternateformat@east-wenatchee.com, al (509) 884-9515
o al 711 (TTY).
1.2. To read this document in an alternate format (Spanish,
Braille, read aloud, etc.), please contact the City Clerk at
alternateformat@east-wenatchee.com, at (509) 884-9515, or at
711 (TTY).
2. Authority.
2.1. RCW 35A.11.020 and RCW 35A.12.190 authorize the City
Council to organize and regulate its internal affairs and to define
the powers, functions and duties of its officers and employees.
THE CITY COUNCIL OF THE CITY OF EAST WENATCHEE DO
RESOLVE AS FOLLOWS:
3. Repeal. The City Council repeals Resolution 2017-03.
4. Annual Plan. Before January 31st of each year, the City’s Project
Development Manager should present the City Council with a
Project List and Schedule of transportation improvement projects
that the City may fund with revenues collected from its vehicle
license fee. The Project List and Schedule should include: each
project’s name, each project’s location, each project’s estimated cost,
and each project’s anticipated year of construction. The City Council
should adopt this Project List and Schedule by resolution.
City of East Wenatchee Resolution 2019-03
Page 2 of 3
Retain Resolution until no longer needed for City-business, then transfer to Washington State Archives (GS50-05A-16 Rev. 1)
5. Material Change to Cost. If an approved transportation
improvement project exceeds its original cost by more than twenty
percent, the City Council must hold a public hearing to solicit
comments from the public regarding how the City should resolve the
cost change. The City’s staff should consult with the City Council
prior to setting the public hearing.
6. Material Change to Scope. If the scope of a transportation
improvement project materially changes from that originally
anticipated at project approval, the City’s staff must consult with
and review the changes with the City Council.
7. Material Change to Schedule. If the schedule of a transportation
improvement project materially changes in a way that significantly
impacts other projects of the City, the City’s staff must consult with
and review such schedule changes with the City Council.
8. Annual Report. Before January 31st of each year, the Project
Development Manager should submit an annual report to the City
Council. The annual report must indicate the status of the prior
year’s transportation improvement costs, transportation
improvement expenditures, revenues, and construction schedules.
After the City Council has reviewed the annual report, the City
Council should direct the City Clerk to publish the annual report on
the City’s website and send a copy to the Wenatchee World.
9. Severability. If a court of competent jurisdiction declares any
provision in this resolution to be contrary to law, such declaration
shall not affect the validity of the other provisions of this Resolution.
10. Effective date. This Resolution becomes effective immediately.