HomeMy WebLinkAboutResolutions - 2019-01 - Updating the City's Transportation Benefit District (TBD) residential street overlay program, repeals Resolution 2017-02b - 2/19/2019
Resolution No. 2019-01
A Resolution of the City of East Wenatchee, Washington updating
the City’s Transportation Benefit District residential street overlay
program.
1.Alternate format.
1.1.Para leer este documento en otro formato (español, Braille, leer en voz alta,
etc.), póngase en contacto con el vendedor de la ciudad al
alternateformat@east-wenatchee.com, al (509) 884-9515 o al 711 (TTY).
1.2.To read this document in an alternate format (Spanish, Braille, read aloud,
etc.), please contact the City Clerk at alternateformat@east-wenatchee.com,
at (509) 884-9515, or at 711 (TTY).
2.Authority.
2.1.RCW 35A.11.020 and RCW 35A.12.190 authorize the City Council to
organize and regulate its internal affairs and to define the powers, functions
and duties of its officers and employees.
THE CITY COUNCIL OF THE CITY OF EAST WENATCHEE DO RESOLVE
AS FOLLOWS:
3.Repeal Resolution 2017-02b. This resolution repeals Resolution 2017-02b.
4.Designation of Transportation Improvement Projects. The East Wenatchee
City Council designates the transportation improvement projects set forth in
Exhibit A as the projects the City intends to finance with the revenue generated
by the vehicle license fee it imposed. The City Council may update the
improvement projects set forth in Exhibit A from time to time. Allowable
expenses of an improvement project include all necessary expenses for:
acquisition of property; inspection and testing; administration and relocation;
and all design, engineering, legal, financial, architectural, and planning costs.
The cost of replacing equipment is not an allowable expense.
5.Cost of Improvement Projects. The City Council estimates the cost of the designated
improvement projects will be about $2.1 Million.
City of East Wenatchee
Resolution 2019-01 TBD TIP
Page 1 of 3
This page intentionally left blank
Transportation Benefit District Exhibit A
Project List and Schedule
Construction Annual
Year Project Name From To 2019 Cost Year Cost Program Cost
2019 N Ashland Ave 13th St NE 12th St NE 94,000$ 94,000$
2019 12th St NE Baker Ave N Ashland Ave 64,000$ 64,000$
2019 Fairview Pl 10th St NE Dead-end 109,000$ 109,000$
2019 Gilbert Court N Grover Pl Dead-end 80,000$ 80,000$ 347,000$
2020 Clemonts Cir 13th St NE 13th St NE 170,000$ 176,800$
2020 4th St NE N Colorado Eastmont Ave 63,000$ 65,520$
2020 S Keller Ave 1st St SE 3rd St SE 127,000$ 132,080$ 374,400$
2021 N Colorado Ave Colby Ct 3rd St NE 210,000$ 227,136$
2021 N Dayton Ave 6th St NE 5th St NE 55,000$ 59,488$ 286,624$
2022 Harrison Ct 10th St NE Jackson Ave 115,000$ 129,359$
2022 6th St NE N Colorado Eastmont Ave 125,000$ 140,608$
2022 Hamilton Ave Standerfer Dead-end 63,000$ 70,866$
2022 Standerfer Hamilton Ave Valley Mall Pky 27,500$ 30,934$ 371,768$
2023 Parkroy Loop S Iowa Ave S Houston Ave 210,000$ 245,670$ 245,670$
2024 Green Place Grant Rd Dead-end 120,000$ 145,998$
2024 S Georgia Ave Grant Rd 1st Pl SE 62,000$ 75,432$
2024 S Gillmore Ave Grant Rd 1st Pl SE 58,000$ 70,566$ 291,997$