Loading...
HomeMy WebLinkAbout2021-07-23 - Washington State Department of Transportation - General Agreements / General Service Agreements - 2021-0712th July 2021 2 From:Pulliam, Justin To:Pearson, Brian Subject:FW: [EXTERNAL] FW: Eastmont @ 9th Date:Tuesday, August 17, 2021 6:02:01 AM Attachments:2021-06-17 WSDOT - Eastmont & 9th - East Wenatchee.pdfimage001.pngimage002.pngimage003.pngimage004.pngimage005.png Here is the related quote for the project at Eastmont and 9th let me know if you want more I have a string of around 25 emails Justin From: Pulliam, Justin Sent: Thursday, June 17, 2021 12:46 PM To: Garren Melton <GMelton@eastwenatcheewa.gov> Cc: Davison, Tim <DavisoT@wsdot.wa.gov> Subject: RE: [EXTERNAL] FW: Eastmont @ 9th Hi Garren, Attached is the quote for the associated parts for the detection on Eastmont @ 9th street. The Estimate for labor is going to be close to $10,000 and vehicle use fees are around $500. Still working out the date at which work can be completed. Or Scheduled. We should be able to come in on budget of $45,000 unless there is some unforeseen circumstances that arise. (such as traffic control.) Im thinking of the week 12-16 of July but I will have to confirm that and get back with you.. I would also recommend you installing Flashing yellow arrows at this intersection to improve mobility. This would have to be a separate project estimated at around $25,000 Justin From: Garren Melton <GMelton@eastwenatcheewa.gov> Sent: Tuesday, June 15, 2021 7:20 AM To: Pulliam, Justin <PulliaJ@wsdot.wa.gov> Cc: Davison, Tim <DavisoT@wsdot.wa.gov> Subject: RE: [EXTERNAL] FW: Eastmont @ 9th Thank you! Garren Melton From: Pulliam, Justin <PulliaJ@wsdot.wa.gov> Sent: Tuesday, June 15, 2021 7:16 AM To: Garren Melton <GMelton@eastwenatcheewa.gov> Cc: Davison, Tim <DavisoT@wsdot.wa.gov> Subject: RE: [EXTERNAL] FW: Eastmont @ 9th I will gather this information this week and get back to you by the end of the week with what the total cost will be, the leave time to receive parts and the time we can schedule it to be done. Thanks Justin From: Garren Melton <GMelton@eastwenatcheewa.gov> Sent: Monday, June 14, 2021 12:14 PM To: Pulliam, Justin <PulliaJ@wsdot.wa.gov> Subject: [EXTERNAL] FW: Eastmont @ 9th WARNING: This email originated from outside of WSDOT. Please use caution with links and attachments. Hey Justin, We’re interested in going forward with the upgrade to the light at 9th and Eastmont this year. What is the lead time on an intersection upgrade? Thanks, Garren Melton Natural Resource Specialist | Public Works City of East Wenatchee “A great place to land!” 271 9th Street NE, East Wenatchee, WA 98802 Phone: (509) 884-1829 Cell: (509) 423-5212 Fax: (509) 884-6233 www.EastWenatcheeWA.gov From: Josh Toftness <jtoftness@eastwenatcheewa.gov> Sent: Monday, June 14, 2021 7:28 AM To: Garren Melton <GMelton@eastwenatcheewa.gov> Subject: FW: Eastmont @ 9th From: Pulliam, Justin <PulliaJ@wsdot.wa.gov> Sent: Friday, May 21, 2021 2:49 PM To: Josh Toftness <jtoftness@eastwenatcheewa.gov> Subject: Eastmont @ 9th Josh was able to get a look at the signal at Eastmont and everything is working as is should at this time but all of your equipment is old and would work better if updated.. I would recommend going with a radar system in the future the cost per intersection is around $45,000 Justin M. Pulliam Washington State DOT Transportation Systems Technician D Signal technician/operations Office 509-667-3087 Mobile 509-668-2062 Personal 509-741-0013 All email sent to and from this address may be subject to disclosure as a public record under the Public Records Act, RCW Chapter 42.56. All email sent to and from this address may be subject to disclosure as a public record under the Public Records Act, RCW Chapter 42.56. Advanced Traffic Products Date Phone No. Fax No. State WA Zip Code County ATP Sales Rep Qty Unit Price Price 4 WX-SS-225 Wavetronix Matrix Stop Bar SmartSensor $3,938.00 $15,752.00 1 WX-102-0416 Click 650 - 4 Sensor Cabinet interface Device with SDLC output $2,520.00 $2,520.00 1 ATPCCUShelf Click 600/650 Shelf Mount kit for 332 type Rack $43.00 $43.00 4 WX-SS-704-060 60 foot 6 Conductor Matrix / 200V Cable w/ Connector $227.00 $908.00 1000 ATP-Matrix 2 Matrix Type 2 Home Run Cable 1 pr #18, 2 triads #22 $1.15 $1,150.00 4 102-0453 (Mini-710)Mini 710 - Sensor Cable Junction Box w/terminal blocks $124.00 $496.00 4 WX-SS-611 Sensor Mount - 6" 2 Axis Aluminum Bracket $176.00 $704.00 1 WS-SDLC-2070-650 5' SDLC Cable-2070 (25 pin screw) to Click 650 (15 pin Spring clip)$114.50 $114.50 $21,687.50 Wavetronix SmartSensor Digital Wave Radar Agency Washington DOT 6/17/2021 Contact Justin Pulliam Address City Project East Wenatchee Eastmont & 9th Mike Singson Model No.Description TOTAL Shipping fees to Alaska are Excluded unless specifically included and shown above.1122 Industry Street Suite A - Everett, WA 98203 - 425.347.6208 www.advancedtraffic.com This quote will be honored for 90 days. This Bid is for Materials Only & Does Not Include Lab Fees, Applicable Taxes or Installation Charges. ATP DOES NOT take responsibility for quantities of materials. There is a 5 to 6 week lead-time upon receipt of PO on all products. Please email PO's to PO@advancedtraffic.com should you opt to purchase this material