HomeMy WebLinkAboutResolutions - 2021-15 - Authorizing the Mayor to sign and ILA Interlocal Agreement between Douglas County, Chelan County, City of Wenatchee, and the City of Pullman for an effectiveness study. - 8/3/2021City of East Wenatchee Resolution 2021-15 with Exhibit A
Retain Resolution until no longer needed for City-business, then transfer to Washington State
Archives (GS50-05A-16 Rev. 1)
Page 1 of 2
City of East Wenatchee, Washington
Resolution No. 2021-15
A Resolution of the City of East Wenatchee, Washington authorizing
the Mayor to execute an Interlocal Agreement Between the City of East
Wenatchee, Douglas County, Chelan County, the City of Wenatchee,
and the City of Pullman for development and implementation of an
effectiveness study related to regional stormwater management and
permit compliance.
1. Alternate format.
1.1. Para leer este documento en otro formato (español, Braille, leer en voz alta, etc.), póngase en contacto con el vendedor de la ciudad al alternateformat@eastwenatcheewa.gov, al (509) 884-9515 o al 711 (TTY).
1.2. To read this document in an alternate format (Spanish, Braille, read aloud, etc.), please contact the City Clerk at alternateformat@eastwenatcheewa.gov, at (509) 884-9515, or at 711 (TTY).
2. Authority.
2.1. RCW 35A.11.020 and RCW 35A.12.190 authorize the City Council to organize and regulate its internal affairs and to define the powers, functions and duties of its officers and employees.
THE CITY COUNCIL OF THE CITY OF EAST WENATCHEE DO RESOLVE AS FOLLOWS:
3. Authorization. The City Council authorizes the Mayor to execute an Interlocal Agreement that conforms to the language set forth in Exhibit A.
4. Severability. If a court of competent jurisdiction declares any provision in this resolution to be contrary to law, such declaration shall not affect the validity of the other provisions of this Resolution.
Stormwater Effectiveness Study Interlocal Agreement
Version: 5/3/2021 Page 1
Return Document to:
Public Works Administrative Assistant
City of Wenatchee
P.O. Box 519
Wenatchee, WA 98807-0519
The information contained in this boxed section is for recording purposes only in accordance with RCW 36.18 and
RCW 65.04, and is not to be relied upon for any other purposes, and shall not affect the intent of or any warranty
contained in the document itself.
Document Title: Interlocal Cooperative Agreement
Reference Number of Documents Released: N/A
Reference Numbers of Related Documents: N/A
Grantor: Douglas County, Chelan County, City of Wenatchee, and City of East Wenatchee, City of
Pullman
Grantee: Douglas County, Chelan County, City of Wenatchee, and City of East Wenatchee, City of
Pullman
Legal Description (Abbreviated): N/A
Parcel Number(s): N/A
INTERLOCAL AGREEMENT FOR
DEVELOPMENT AND IMPLEMENTATION OF AN EFFECTIVENESS STUDY RELATED TO REGIONAL
STORMWATER MANAGEMENT AND PERMIT COMPLIANCE
This agreement (“Agreement”) is made and entered among Douglas County, Chelan County, the City
of Wenatchee (“Wenatchee”), the City of East Wenatchee (“East Wenatchee”) and the City of Pullman
(“Pullman”), collectively the “Parties”.
WHEREAS, Chapter 39.34 RCW (Interlocal Cooperation Act) provides for the formation of interlocal
agreements that enable local governments to effectively cooperate with each other to the benefit of
local communities;
WHEREAS, the Federal Clean Water Act, 33 U.S.C. § 1251 et seq. and the Phase II Stormwater Final Rule
promulgated by the U.S. Environmental Protection Agency (“EPA”) require the operators of certain small
municipal separate stormwater sewer systems to obtain National Pollutant Discharge Elimination
System (“NPDES”) permit coverage;
WHERAS, in Washington State, the EPA has delegated authority for the Federal Clean Water Act,
including development and administration of the Phase II municipal stormwater management program,
to the Washington State Department of Ecology (“Ecology”);
WHEREAS, Douglas County, Chelan County, Wenatchee, East Wenatchee and Pullman are covered
under the Eastern Washington Phase II Municipal Stormwater Permit;
WHEREAS, on July 1, 2019, Ecology issued the current Eastern Washington Phase II Municipal
Stormwater Permit (“Permit”), Effective Date: August 1, 2019; Permit Expiration Date: July 31, 2024;
Exhibit A to Resolution 2021-15
Stormwater Effectiveness Study Interlocal Agreement
Version: 5/3/2021 Page 2
WHEREAS, Section S8 of the Permit requires each city and county to participate in an Ecology-approved
study to assess the effectiveness of permit-required stormwater management program activities and
best management practices;
WHEREAS, the Parties collaborated on the Mobile Contractor Education and Outreach Effectiveness
Study to comply with S5.B.1.b of the Permit;
WHEREAS, the Parties developed and submitted a list of project participants and associated roles to
comply with Section S8.A.2.b of the Permit by March 31, 2021;
WHEREAS, a detailed study design proposal titled “Private Residential BMP Owner Awareness
Effectiveness Study” (the “Study”) was submitted to Ecology on March 31, 2021 to comply with Section
S8.A.2c ; and
WHEREAS, the Parties wish to continue their cooperative approach for compliance with state and
federal standards for stormwater management.
NOW, THEREFORE, the Parties hereby agree as follows:
1. The Recitals above are incorporated and made part of this Agreement.
2. Wenatchee shall be the lead agency for the purposes of the Study.
3. Wenatchee shall be responsible for completing the Study as required by Section S8.B.2 and
implementation of the revised mobile contractor education and outreach program as required
by Section S5.B1.b of the Permit.
4. The Parties will work together to accomplish the Study and implement the revised mobile
contractor education and outreach.
a. The Parties will cooperatively select a consultant to conduct a survey of property
owners and provide a report of the survey results.
b. The consultant will contract with Wenatchee for the accomplishment of study activities
when approved by the Parties.
c. The Parties will review and provide comments on the study submittals and education
and outreach materials.
5. The Study shall be funded in equal shares by each of the Parties. Each Party’s contribution shall
not exceed seven thousand dollars ($7,000). Wenatchee will pay the consultant and bill the
other Parties their equal shares. The Parties shall reimburse Wenatchee within forty-five (45)
days of receipt of billing.
6. This Agreement does not create any new or separate legal or administrative entity to administer
the provisions of this Agreement, and the Parties will not acquire nor dispose of real or personal
property for use in this undertaking.
Exhibit A to Resolution 2021-15
Stormwater Effectiveness Study Interlocal Agreement
Version: 5/3/2021 Page 3
7. This Agreement is effective upon signature by all Parties and filing with the Chelan County
Auditor. This Agreement shall remain in effect through the end of the Permit cycle unless
terminated earlier pursuant to its terms.
8. Any Party may withdraw from the Agreement upon thirty (30) days’ written notice to the other
Parties.
9. This Agreement shall terminate upon the withdrawal of at least three (3) of the Parties, or by
written agreement of all Parties.
10. The Parties’ authorized representatives and contact persons for administration of this
Agreement, communication, and service of all notice, except service of process are:
Chelan County: Jason Detamore
316 Washington Street, Suite 402
Wenatchee, WA 98801
(509) 667-6415
Douglas County: Jennifer Lange, P.E.
140 19th Street NW, Suite A
East Wenatchee, WA 98802
(509) 884-7173
City of East Wenatchee: Garren Melton
271 9th Street NE
East Wenatchee, WA 98802
(509) 884-1829
City of Wenatchee: Jessica Shaw
1350 McKittrick Street, Suite A
Wenatchee, WA 98801
(509) 888-3200
City of Pullman: Shilo Sprouse
190 SE Crestview St, Bldg A
Pullman, WA 99163
(509) 338-3220
11. Each Party shall maintain books, records, documents and other materials relevant to its
performance under this Agreement. Each Party shall retain all such books, records, documents
and other materials for the longest applicable retention period under federal and state law. The
records shall be kept available for and subject to inspection, review and audit by each Party
hereto or its designee, any agency funding a portion of the project, any authorized auditing or
oversight entity, and the Washington State Auditor’s Office.
Exhibit A to Resolution 2021-15
Stormwater Effectiveness Study Interlocal Agreement
Version: 5/3/2021 Page 4
SIGNATURE PAGE 1 of 5
Adopted:____________________________ CITY OF EAST WENATCHEE
_______________________________
Jerrilea Crawford, Mayor
________________________________
Date
ATTEST:
___________________________________
Maria Holman, City Clerk
___________________________________
Date
APPROVED AS TO FORM:
__________________________________
Devin Poulson, City Attorney
__________________________________
Date
Exhibit A to Resolution 2021-15
Stormwater Effectiveness Study Interlocal Agreement
Version: 5/3/2021 Page 5
SIGNATURE PAGE 2 of 5
Adopted: ____________________________ DOUGLAS COUNTY
BOARD OF COUNTY COMMISSIONERS
_______________________________
Marc S. Straub, Chair
_______________________________
Kyle Steinburg, Vice Chair
_______________________________
Dan Sutton, Member
________________________________
Date
ATTEST:
___________________________________
Tiana Rowland, Clerk of the Board
___________________________________
Date
APPROVED AS TO FORM:
__________________________________
Jim Mitchell, Civil Deputy Prosecuting Attorney
WSBA #31031
__________________________________
Date
Exhibit A to Resolution 2021-15
Stormwater Effectiveness Study Interlocal Agreement
Version: 5/3/2021 Page 6
SIGNATURE PAGE 3 of 5
Adopted:____________________________ CITY OF WENATCHEE
_______________________________
Frank Kuntz, Mayor
________________________________
Date
ATTEST:
___________________________________
Tammy Stanger, City Clerk
___________________________________
Date
APPROVED AS TO FORM:
__________________________________
City Attorney
__________________________________
Date
Exhibit A to Resolution 2021-15
Stormwater Effectiveness Study Interlocal Agreement
Version: 5/3/2021 Page 7
SIGNATURE PAGE 4 of 5
Adopted: ____________________________ CHELAN COUNTY
BOARD OF COUNTY COMMISSIONERS
_______________________________
Bob Bugert, Chairman
_______________________________
Tiffany Gering, Commissioner
_______________________________
Kevin Overbay, Commissioner
________________________________
Date
ATTEST: Carlye Baity
___________________________________
Clerk of the Board
___________________________________
Date
APPROVED AS TO FORM:
__________________________________
Robert W. Sealby
Deputy Prosecuting Attorney
__________________________________
Date
Exhibit A to Resolution 2021-15
Stormwater Effectiveness Study Interlocal Agreement
Version: 5/3/2021 Page 8
SIGNATURE PAGE 5 of 5
Adopted:____________________________ CITY OF PULLMAN
_______________________________
Glenn A. Johnson, Mayor
________________________________
Date
ATTEST:
___________________________________
Dee Stiles-Elliot, City Clerk
___________________________________
Date
APPROVED AS TO FORM:
__________________________________
City Attorney
__________________________________
Date
Exhibit A to Resolution 2021-15