HomeMy WebLinkAboutOrdinances - 2018-18 - Adopting Final Budget of the Greater East Wenatchee Storm Water Utility - 11/27/2018City of East Wenatchee Ordinance 2018-18
Page 1 of 4
Retain Ordinance until no longer needed for City-business, then transfer to Washington State Archives (GS50-05A-16
Rev.1)
CITY OF EAST WENATCHEE, WASHINGTON
ORDINANCE NO. 2018-18
An Ordinance of the City of East Wenatchee adopting the final budget of the Greater East Wenatchee Storm Water Utility in the amount of $6,040,755 for the fiscal year commencing on January 1, 2019. Una Ordenanza de la ciudad del este de este año adoptando el presupuesto final de la gran utilidad de agua de tormenta del este, en la cantidad de $6.040.755 para el ejercicio que comienza el 1 de enero de 2019.
1. Alternate format.
1.1. Para leer este documento en otro formato (espafiol, Braille, leer en voz alta, etc.), p6ngase en contacto con el vendedor de la ciudad al alternatformat@east-wenatchee.com, al (509) 884-9515 0 al 711 (TTY).
1.2. To read this document in an alternate format (Spanish, Braille, read aloud, etc.), please contact the City Clerk at alternateformat@east-wenatchee.com, at (509) 884-9515, or at 711 (TTY).
2. Recitals.
2.1. The City of East Wenatchee ("City") is a non-charter code City duly incorporated and operating under the laws of the State of Washington; and
2.2. On March 16, 1998, the City Council of East Wenatchee
("City Council") adopted Resolution No. 98-03. On March 17, 1998, the
Douglas County ("County") Board of Commissioners adopted Resolution No.
98-12. These resolutions authorized the City and the County to execute an
Interlocal Cooperation Agreement Between Douglas County and the City of
East Wenatchee for Storm and Surface Water Management ("SWU Interlocal
Agreement") for the purpose of providing a stable funding source for
improvements to the drainage system and general operation and maintenance
of the stormwater systems.
2.3. In compliance with RCW 35.67 and RCW 36.89, the City and the County established separate Stormwater Utilities. As authorized by the SWU Interlocal Agreement, a management team made up of staff and elected officials from the City and from the County jointly manage the stormwater utilities as the "Greater East Wenatchee Storm Water Utility."
City of East Wenatchee Ordinance 2018-18
Page 2 of 4
Retain Ordinance until no longer needed for City-business, then transfer to Washington State Archives (GS50-05A-16
Rev.1)
2.4. In accordance with Section 5.03 of the SWU Interlocal Agreement, the City Council finds that it is in the best interests of the City and its citizens to set the Greater East Wenatchee Stormwater Utility Budget for 2019.
3. Authority.
3.1. RCW 35A.11.020 and RCW 35A.12.190 authorize the City Council to adopt ordinances of all kinds to regulate its municipal affairs and appropriate to the good government of the City.
3.2. RCW 35A.33.020 permits a separate budgeting process for the adoption of a municipal utility budget.
3.3. EWMC 13.10.090 and the Section 5.03 of the SWU Interlocal Agreement require the approval of the budget by the City Council and the Board of County Commissioners.
THE CITY COUNCIL OF THE CITY OF EAST WENATCHEE DO ORDAIN AS FOLLOWS:
Section1: Purpose. EWMC 13.10.090 and the SWU Interlocal Agreement require the approval of an annual budget by the City Council and by the Douglas County Board of Commissioners.
Section 2: Budget Adopted. In accordance with the SWU Interlocal Agreement and with the City Municipal Code, and as set forth in Exhibit A, the City Council adopts the final budget of the Greater East Wenatchee Storm Water Utility in the amount of $6,040,755 for the fiscal year 2019.
Section 3: Severability. If a court of competent jurisdiction declares any provision in this Ordinance to be contrary to law, such declaration shall not affect the validity of the other provisions of this Ordinance.
Section 4: Transmittal. The City Council directs the City Clerk to transmit a complete copy of this ordinance to the Division of Municipal Corporations of the State Auditor and to the Association of Washington Cities. Section 5: Publication. The City Council directs the City Clerk to publish a summary of this Ordinance. The summary shall consist of the title of this Ordinance. The City Council directs the City Clerk to publish a copy of this Ordinance on the City's website.
Section 6: Effective Date. This Ordinance becomes effective five days after the date its summary is published.
DOUGLAS COUNTY
TRANSPORTATION AND LAND SERVICES
GREATER EAST WENATCHEE STORM WATER UTILITY
MEMO
To:Board of County Commissioners —East Wenatchee City Council
From:Stormwater Utility Management Team
Commissioner Kyle Steinburg,Councilman Mathew Hepner
Date:October 25,2018
Re:2019 Storm Water Utility Budget;Management Team Recommendation
Please find attached the 2019 Storm Water Utility Budget Proposal as recommended
for adoption by the Stormwater Utility Management Team at the October 25,2018
Management Team meeting.
Mathew Hepner —City of East Wenatchee
Councilman
urg —Douglas County
18_10252019 SWU Budget Recommendation.doc
Summary 1
Joint Overview 3
Joint Administration Expenditures 4
Joint Administration Revenues 5
Joint Capital Expenditures 6
Joint Capital Revenues 6
ER&R Expenditures and Revenues 7
SWPMF East Wenatchee Summary 9
SWPMF East Wenatchee 10
SWPMF Douglas County Summary 13
SWPMF Douglas County 14
Greater East Wenatchee
Storm Water Utility
2019 Preliminary Budget
TABLE OF CONTENTS
10/29/2018 7:39 PM
10/29/18 7:37 PM Joint SWPMF SWPMF TotalPrograms CityCountyRevenuesSW Fees 1,202,139 1,202,139 Grant Revenue - 50,000 50,000 Charges for Services 40,000 40,000 Miscellaneous Revenue - - SWU Intrafund Transfers In 100,000 776,399 987,566 1,863,965 Interest 3,700 700 1,700 6,100 Total Revenues1,345,839 777,099 1,039,266 3,162,204 ExpendituresAdministration 95,322 95,322 Pre-Construction Work 450,000 225,000 675,000 Construction 2,100,000 450,000 2,550,000 Small Projects - 100,000 50,000 150,000 NPDES Operations 285,600 305,168 590,768 NPDES Permit Fee 4,600 5,000 9,600 UIC Registration/Assessments - - - ER&R Operations 13,200 13,200 SWU Intrafund Transfers Out 1,113,965 300,000 450,000 1,863,965 Debt Redemption & Interest 89,400 89,400 Capital Outlays 3,500 3,500 Significant Flood Expenditures - Total Expenditures 3,865,387 915,200 1,260,168 6,040,755 Excess (Deficient) Revenues OverExpenditures (2,519,548) (138,101) (220,901) (2,878,551) 3,352,464 671,418 1,244,777 5,268,659 832,916 533,317 1,023,876 2,390,108 Douglas CountyTransportation and Land Services2019 Preliminary BudgetBeginning Fund Bal.Ending Fund Bal.
2019 SWU Preliminary Budget
3
10/29/2018 19:37
2019 2018 2018
Budget Projected Budget
Expenditures $3,865,387 $1,774,574 $4,065,574
Administration (Page 3)1,298,687 1,472,069 1,496,569
Capital (Page 6)2,550,000 258,005 2,558,005
ER&R (Page 11)16,700 44,500 11,000
Revenues $1,595,839 $1,745,623 $1,744,639
Administration (Page 5)1,203,339 1,202,939 1,203,639
Capital (Page 7)351,500 501,500 509,000
ER&R (Page 11)41,000 41,184 32,000
Beginning Fund Balance $3,352,464 $3,381,415 $3,123,574
Excess Revenues Over (Expenditures) (2,269,548) (28,951) (2,320,935)
Ending Fund Balance $1,082,916 $3,352,464 $802,639
2019 Preliminary Budget
Greater East Wenatchee Storm Water Utility
2019 SWU Preliminary Budget
4
Greater East Wenatchee Storm Water Utility
10/29/2018 19:37
2019 2018 2018
Budget Projected Budget
Expenditures 1,298,687 1,472,069 1,496,569
Change from 2018 Budget: ($197,882)
Storm Water Utility 35,515 30,000 40,000
Change from 2018 Budget: ($4,485)
Administration 35,515 30,000 40,000
Douglas County 32,307 25,615 33,300
Change from 2018 Budget: ($993)
Administration
Treasuer fee for billing 10,000 9,615 9,300
22,307 16,000 24,000
East Wenatchee 27,500 21,800 28,300
Change from 2018 Budget: ($800)
Administration
Treasurer fee for billing 7,500 6,800 6,800
20,000 15,000 21,500
Joint Administration
2019 Preliminary Budget
General administration, accounting, ordinance revision.
General administration, accounting, and ordinance revision.
Coordinate goals and policies, for the Joint Utility, related to
establishment of the program and development of consisitent
Stormwater Design Standards; prepare the SWU service charge
roll and the list of deliquent parcels; work with the Treasurer's
Office and the collection agency to collect deliquent amounts;
address citizen inquiries about the utility and amounts due;
provide accounting for the joint utility; establish a program
including basin and watershed planning, education, capital
improvements, operations and maintenance, source control,
and fish protection; prepare the annual budget for approval;
and GIS support fees.
Establish the County's Stormwater Utility program in accordance
with the interlocal agreement for the Joint Utility; pay the
Treasurer for billing and collection of annual fees from County
SWU residents; provide accounting for Douglas County SWU
activities; perform County specific planning, conservation, and
R&D; and County SWU budget preparation.
Establish the City's Stormwater Utility program in accordance
with the interlocal agreement for the Joint Utility; pay the
Treasurer for billing and collection of annual fees from City SWU
residents; provide accounting for East Wenatchee SWU activities;
perform City specific planning, conservation, and R&D; and City
SWU budget preparation.
2019 SWU Preliminary Budget
5
2019 2018 2018
Budget Projected Budget
Intrafund Transfers 1,113,965 1,294,519 1,294,519
Change from 2018 Budget: ($180,554)
Admin to Capital 100,000 500,000 500,000
Admin to Disaster - 50,000 50,000
NPDES (county) 474,547 463,362 463,362
NPDES (city)418,227 281,157 281,157
SWPMFDC (county) 63,019
SWPMFEW (city)58,172
Debt Redemption and Interest 89,400 100,135 100,450
Change from 2018 Budget: ($11,050)
11th Street Detention Basin (EW, PWTF, 2020)11,000 11,000
Canyon A Pre-Construction #1 (PWTF, 2024)12,100 12,089 12,150
Canyon A Construction (PWTF, 2025)60,500 60,244 60,500
Canyon A Pre-Construction #2 (PWTF, 2026)16,800 16,802 16,800
Revenue 1,203,339 1,202,939 1,203,639
Change from 2018 Budget: ($300)
Stormwater Utility Service Charge 1,202,139 - 1,110,000
City 520,309 520,309 520,309
County 681,830 681,830 681,830
Interest 1,200 800 1,500
Miscellaneous Income
Beginning Balance 220,348 489,478 438,945
Ending Balance 125,000 220,348 146,015
2019 SWU Preliminary Budget
6
Greater East Wenatchee Storm Water Utility
2019 Preliminary Budget
10/29/2018 19:37
2019 2018 2018
Budget Projected Budget
Expenditures 2,550,000 258,005 2,558,005
Change from 2018 Budget: ($8,005)
Preconstruction 450,000 - 200,000
Change from 2018 Budget: $250,000
Canyon A - Rural 200,000 200,000
19th St. NW / Cascade Ave. Design 250,000
Construction 2,100,000 14,405 2,114,405
Change from 2018 Budget: ($14,405)
Canyon A - Rural 2,100,000 2,100,000
Baker Ave (15th to City Limits)w/X-ing 0 14,405 14,405
Small Stormwater Projects - 243,600 243,600
Change from 2018 Budget: ($243,600)
Douglas County (Airport/Baker Flats) 125,000 125,000
East Wenatchee 5,000 5,000
Astor Court - 56,800 56,800
Ashland 56,800 56,800
5th Street Sidewalk and Stormsewer
2019 2018 2018
Budget Projected Budget
Revenue 351,500 501,500 509,000
Change from 2018 Budget: ($157,500)
Transfer from Admin 100,000 500,000 500,000
WQSWPC-2016-Ewena-00039 (19th Street /Cascade)250,000
Interest 1,500 1,500 9,000
Beginning Balance 2,890,896 2,647,401 2,470,097
Ending Balance 692,396 2,890,896 2,979,097
Capital Account
Analysis of and possible design of the rural section
of the Canyon A drainage project.
Possible construction of the rural portion of the Canyon A project.
Small project funds are used to address stormwater issues that
need immediate attention, on an as needed basis.
2019 SWU Preliminary Budget
7
Greater East Wenatchee Storm Water Utility
10/29/2018 19:37
2019 2018 2018
Budget Projected Budget
Expenditures 16,700 44,500 11,000
Change from 2018 Budget: 5,700
Maintenance 12,000 9,500 8,500
Insurance 1,200 2,500
Rental Contracted Services
Captial Expenditures (lights)3,500 35,000
Revenues 41,000 41,184 32,000
Change from 2018 Budget: $9,000
Rental Douglas County SW 22,500 18,675 15,000
Rental East Wenatchee SW 15,000 14,500 15,000
Rental Douglas County Road Department 2,500 6,658 1,500
Rental East Wenatchee Street Department
Interest 1,000 1,351 500
Beginning Balance 241,220 244,536 214,532
Ending Balance 265,520 241,220 235,532
ER&R Account
2019 Preliminary Budget
2019 SWU Preliminary Budget
8
2019 SWU Preliminary Budget
9
10/29/2018 19:37
2019 2018 2018
Budget Projected Budget
Expenditures $915,200 $187,800 $210,200
NPDES 590,200 187,800 210,200
Capital 325,000 - -
Disaster Reserve - - -
Revenues $860,248 $281,633 $281,157
NPDES 501,576 281,633 281,157
Capital 355,263 - -
Disaster Reserve 3,409 - -
Beginning Fund Balance $671,418 $166,808 $221,212
Excess Revenues Over (Expenditures) (54,952) 93,833 70,957
Ending Fund Balance $616,466 $260,641 $292,169
Greater East Wenatchee Storm Water Utility
2019 Preliminary Budget
East Wenatchee Stormwater Project Management Fund
2019 SWU Preliminary Budget
10
Greater East Wenatchee Storm Water Utility
10/29/2018 19:37
2019 2018 2018
Budget Projected Budget
Expenditures 590,200 187,800 210,200
Change from 2018 Budget: 380,000
Stormwater Program--updates/Admin (01)14,000 11,400 14,000
Public Education and Outreach (02)2,000 1,000 2,000
Public Involvement and Participation (03)800 500 800
Illicit discharge Detection and Elimination (IDDE)(04)3,000 1,000 3,000
Construction Site Stormwater Runoff Control (05)7,000 1,800 7,000
Post Construction Stormwater Management (06)4,500 500 4,500
Pollution Prevention and Good Housekeeping (07)245,800 165,800 165,800
SWPMF-East Wenatchee
2019 Preliminary Budget
NPDES
Record keeping and reporting; program updates; participation
+and coordination with Ecology and other stormwater permit
holders.
Preparation, printing, and distribution of education materials
to educate the public on the importance of the stormwater
program and how they can be a contributing partner in the
program.
Preparing for and participating in meetings and public
hearings as outlined in the Municipal Permit; posting the
annual report and Stormwater Management Program on
the CIty web site.
Train staff about illicit discharges; record, investigate and
respond to, and report illicit discharges; maintain a map of the
stormwater system and keep track of who is connecting to it.
Implement procedures to monitor compliance with the
required ordinace about erosion and sediment controls
and other construction phase stormwater pollution
controls at new and redevelopment projects; provide
training on how to comply with the ordinance; maintain
records and report as required.
Implement and enforce a program to address post construction
runoff from new and redevelopment through an ordinance, site
plan review, and inspection; train county staff to implement the
ordinance; keep records.
Implement an operation and maintenance program that includes
training and has the ultimate goal of preventing or reducing
pollutant runoff from municipal operations; inspect treatment
and flow control facilities at least every two years.
2019 SWU Preliminary Budget
11
2019 2018 2018
Budget Projected Budget
Monitoring (08)8,500 1,200 8,500
UIC Registration/Assessments
Permit Fee 4,600 4,600 4,600
Transfer to EWSWPF-Capital 300,000
Revenues 501,576 281,633 281,157
Change from 2018 Budget: $220,419
NPDES (city)418,227 281,157 281,157
SWPMF Distribution -
WQSWCAP-1719-Ewena-0088 33,149
ECY-Capital Grant (pending)50,000
Interest 200 476
Beginning Balance 260,641 166,808 221,212
Ending Balance 172,017 260,641 292,169
2019 2018 2018
Budget Projected Budget
Expenditures 325,000 - -
Change from 2018 Budget: $0
Preconstruction 225,000
Change from 2018 Budget: $225,000
Construction -
Change from 2018 Budget: $0
Small Stormwater Projects 100,000
Change from 2018 Budget: $100,000
Georgia Ave Project 75,000
N. 3rd Street Infiltration Pond Maintenance 5,000
N. Baker Avenue 20,000
Revenue 355,263 - -
Change from 2018 Budget: $355,263
SWPMF Distribution 55,263
Transfer from EWSWPF-Capital 300,000
Interest
Beginning Balance - - -
Ending Balance 30,263 - -
Capital
Collaborate with other permittees to select, propose, develop,
and conduct Ecology approved studies to access, on a regional or
sub‐regional basis, effectiveness of permit required stormwater
management program activities.
Fee paid to Ecology for the privilege to participate in their program.
2019 SWU Preliminary Budget
12
2019 2018 2018
Budget Projected Budget
Revenue 3,409 00
Change from 2018 Budget: $3,409
SWPMF Distribution 2,909
Interest 500
Beginning Balance 410,777 - -
Ending Balance 414,186 410,777 -
Disaster
2019 SWU Preliminary Budget
13
10/29/2018 19:37
2019 2018 2018
Budget Projected Budget
Expenditures $1,260,168 $234,500 $269,500
NPDES 760,168 234,500 269,500
Capital 500,000 - -
Disaster Reserve - - -
Revenues $1,039,266 $465,078 $513,362
NPDES 528,898 465,078 513,362
Capital 506,717 - -
Disaster Reserve 3,651 - -
Beginning Fund Balance $1,244,777 $569,190 $577,520
Excess Revenues Over (Expenditures) (220,901) 230,578 243,862
Ending Fund Balance $1,023,876 $799,768 $821,382
Greater East Wenatchee Storm Water Utility
2019 Preliminary Budget
Douglas County Stormwater Project Management Fund
2019 SWU Preliminary Budget
14
Greater East Wenatchee Storm Water Utility
10/29/2018 19:37
2019 2018 2018
Budget Projected Budget
Expenditures 760,168 234,500 269,500
Change from 2018 Budget: 490,668
Stormwater Program--updates/Admin (01)27,731 28,000 28,000
Public Education and Outreach (02)10,056 1,500 10,000
Public Involvement and Participation (03)3,037 500 3,000
Illicit discharge Detection and Elimination (IDDE)(04)12,023 500 5,000
Construction Site Stormwater Runoff Control (05)12,650 10,000 10,000
Post Construction Stormwater Management (06)22,396 8,000 20,000
Pollution Prevention and Good Housekeeping (07)200,000 180,000 180,000
Decant Facility Pre-Construction (Transfer to Capital)450,000
SWPMF-Douglas County
2019 Preliminary Budget
NPDES
Record keeping and reporting; program updates; participation
and coordination with Ecology and other stormwater permit
holders.
Preparation, printing, and distribution of education materials
to educate the public on the importance of the stormwater
program and how they can be a contributing partner in the
program.
Preparing for and participating in meetings and public
hearings as outlined in the Municipal Permit; posting the
annual report and Stormwater Management Program on
the County web site.
Train staff about illicit discharges; record, investigate and
respond to, and report illicit discharges; maintain a map of the
stormwater system and keep track of who is connecting to it.
Implement procedures to monitor compliance with the
required ordinace about erosion and sediment controls
and other construction phase stormwater pollution
controls at new and redevelopment projects; provide
training on how to comply with the ordinance; maintain
records and report as required.
Implement and enforce a program to address post construction
runoff from new and redevelopment through an ordinance, site
plan review, and inspection; train county staff to implement the
ordinance; keep records.
Implement an operation and maintenance program that includes
training and has the ultimate goal of preventing or reducing
pollutant runoff from municipal operations; inspect treatment
and flow control facilities at least every two years.
2019 SWU Preliminary Budget
15
2019 2018 2018
Budget Projected Budget
Monitoring (08)17,275 1,000 8,500
UIC Registration/Assessments
Permit Fee 5,000 5,000 5,000
Revenues 528,898 465,078 513,362
Change from 2018 Budget: $15,536
G1400228 DC DOE Grant, Capacity/Plan ($50,000)50,000
WQSWCAP-1719-DCoTLS-00135 50,000
NPDES (county) 474,547 463,362 463,362
SWPMF Distribution 3,151
Interest 1,200 1,716
Beginning Balance 799,768 569,190 577,520
Ending Balance 568,498 799,768 821,382
Collaborate with other permittees to select, propose, develop,
and conduct Ecology approved studies to access, on a regional or
sub‐regional basis, effectiveness of permit required stormwater
management program activities.
Fee paid to Ecology for the privilege to participate in their program.
2019 SWU Preliminary Budget
16
2019 2018 2018
Budget Projected Budget
Expenditures 500,000 - -
Change from 2018 Budget: $0
Preconstruction 450,000
Change from 2018 Budget: $450,000
Decant Feasibility 100,000
Decant Design ($350,000)350,000
Construction -
Change from 2018 Budget: $0
Small Stormwater Projects 50,000 150,000
Change from 2018 Budget: ($100,000)
North Baker Flats (Nelpar Ponding)15,000
Grant Road/Urban Industrial Way - Rehab 15,000
Spot Flood Mitigation 20,000
Revenue 506,717 - -
Change from 2018 Budget: $506,717
SWPMF Distribution 56,717
Other (PPGH Transfer- Decant Feasibility) 450,000
Interest 0
Beginning Balance - - -
Ending Balance 6,717 - -
2019 2018 2018
Budget Projected Budget
Revenue 3,651
Change from 2018 Budget: $3,651 00
SWPMF Distribution 3,151
Interest 500
Expenditures
Emergency Repairs/Response
Beginning Balance 445,009 - -
Ending Balance 448,660 445,009 -
Capital
Disaster
2019 SWU Preliminary Budget
17