HomeMy WebLinkAboutOrdinances - 2017-05 - Repealing and replacing Ordinance No. 2017-03, Adopting moratorium on new wireless communications facilities within City for six months - 2/28/2017City of East Wenatchee, Washington
Ordinance No. 2017-05
An Ordinance of the City of East Wenatchee repealing and replacing
Ordinance No. 2017-03 and adopting an immediate moratorium on the
acceptance of applications for use permits, wireless telecommunications
facility permits, building permits, right of way use authorizations and
franchises for new wireless communication facilities within the City, to
be effective for a period of six months, declaring an emergency,
establishing a public hearing date, and providing for severability.
Una Ordenanza de la Ciudad de East Wenatchee que deroga y
reemplaza la Ordenanza No. 2017-03 que adopta una moratoria
inmediata sobre la aceptaci6n de solicitudes de permisos de uso,
permisos de instalaciones de telecom unicaciones inalambricas, permisos
de construcci6n y derechos de uso de autorizaciones y franquicias para
nuevas instalaciones de comunicaciones inalambricas Dentro de la
Ciudad, para ser eficaz por un periodo de seis meses, declarando una
emergencia, estableciendo una fecha de audiencia publica, y proveyendo
separaci6n.
1. Alternate format.
1.1. Para leer este documento en otro formato (espaiiol, Braille, leer en voz alta,
etc.), p6ngase en contacto con el vendedor de la ciudad al
alternatformat@east·wenatchee.com, al (509) 884-9515 o al 711 (TTY).
1.2. To read this document in an alternate format (Spanish, Braille, read aloud,
etc.), please contact the City Clerk at alternateformat@east·wenatchee.com,
at (509) 884-9515, or at 711 (TTY).
2. Recitals.
2.1. The City of East Wenatchee ("City") is a non ·charter code city, duly
incorporated and operating under the laws of the State of Washington.
2.2. The Telecommunications Act of 1996 (Public Law No. 104-104, 110 Stat. 56,
31-136 (the "Act"), was designed to remove regulatory barriers and
encourage competition among all types of communications companies.
2.3. The Act ratified the authority of local government to regulate the
construction and modification of wireless communications service facilities,
City of East Wenatchee
Ordinance 2017-05
Page 1of6
but also limits local governments' authority in certain respects.
2.4. The City, on November 12, 2002 through the adoption of Ordinance No.
2002-22, added Chapter 17.70 of the East Wenatchee Municipal Code
("EWM C") establishing zoning standards applicable to wireless
communication facilities.
2.5. The City, on January 12, 2010, through the adoption of Ordinance No. 2010-
03, amended certain sections of Chapter 17. 70.
2.6.ln 2012, Congress passed the "Middle Class Tax Relief and Job Creation Act
of 2012" (the "Spectrum Act") (Public Law No. 112-96; codified at 47 U.S.C. §
1455(a)), which in part, amended the Act.
2. 7. Recent changes to federal laws, regulations and court cases related to
wireless communication services as well as technological developments and
changes in consumer demand and usage have reshaped the wireless industry
and increased the demand for and complexity of siting wireless facilities
within the City.
2.8.A comprehensive review of City's telecommunications standards has not
occurred since 2002. The City Council has determined that the EWMC
currently lacks adequate provisions to regulate wireless communication
facilities within the City in compliance with current federal laws and
technologies.
2.9. The City needs to review its codes and ordinances related to wireless
communications facilities and right of way use permits in a comprehensive
manner to determine if amendments are necessary to more adequately
address the siting and permitting process for such facilities.
2.10. The City Council finds that the vesting of permits applications for
construction of wireless communication facilities under the existing EWMC
would be detrimental to public health, safety and welfare.
2.11. Washington State's vested rights doctrine, which allows certain land use
applications to vest to land use regulations which are in effect on the date of
complete application, could allow application for wireless communications
facilities to vest under inadequate regulations while the City studies the
changes that may be needed in those regulations, thereby undermining
effective City planning for those facilities and constituting an emergency.
2.12. In accordance with WAC 197-11-880, the adoption of this ordinance is
exempt from the requirements of a threshold determination under the State
Environmental Policy Act.
City of East Wenatchee
Ordinance 2017-05
Page 2of6
2.13. The City Council adopted Ordinance 2017-03 on January 10, 2017
establishing a moratorium for a period of 6 months prohibiting the
acceptance of applications for use permits, wireless telecommunications
facility permits, building permits, right of way use authorizations and
franchises for new wireless communication facilities within the City to
provide more time to investigate this issue further to evaluate the best
alternatives for the community.
2.14. There are existing wireless telecommunications facility existing within
the City. To permit those facilities to continue with upgrades that are
planned or pending which may require a building permit or other approval,
the City Council wishes to amend the moratorium to be applicable only to
new wireless facilities.
2.15. The City Council finds that it is in the best interests of the City and its
citizens to impose a moratorium for a period of 6 months prohibiting the
acceptance of applications for use permits, wireless telecommunications
facility permits, building permits, right of way use authorizations and
franchises for new wireless communication facilities within the City to
provide more time to investigate this issue further to evaluate the best
alternatives for the community.
3. Authority.
3.1.RCW 35A.ll.020 and RCW 35A.12.190 authorize the City Council to adopt
ordinances of all kinds to regulate its municipal affairs and appropriate to
the good government of the City.
3.2.RCW 35A.63.220 and RCW 36.70A.390, authorize the City Council to
establish a moratorium.
4. Purpose. The purpose of the moratorium is to allow the City adequate time to
comprehensively review and possibly amend its regulations relating to the siting
of wireless communications facilities in a manner that addresses the
Telecommunications Act of 1996, the Spectrum Act, other recently adopted FCC
rules, changes in technology, local concerns and efforts to provide the public with
access to wireless services for its safety, convenience and productivity.
5. Repeal. The City Council hereby repeals Ordinance No. 2017-03.
THE CITY COUNCIL OF THE CITY OF EAST WENATCHEE DO ORDAIN AS
FOLLOWS:
6. Moratorium. The City Council hereby enacts a 6-month moratorium prohibiting
the acceptance of applications for use permits, wireless telecommunications
City of East Wenatchee
Ordinance 2017-05
Page 3of6
facility permits, building permits, right of way use authorizations and
franchises for new wireless communication facilities within the City of East
Wenatchee.
7. Public hearing. A duly advertised public hearing shall be conducted by the City
Council on March 14, 201 7.
8. Findings of Fact. The City Council adopts as its preliminary findings of fact
the recitals set forth above. The Council may adopt additional findings in the
event that additional public hearings are held or evidence is presented to the
City Council.
9. Duration/Renewal. The moratorium imposed by the Ordinance shall be effect for
a period of six months from the date this ordinance is passed and shall
automatically expire at the conclusion for that six-month period unless extended
as provided for in RCW 35A.63.220 and RCW 36. 70A.390, or unless terminated
sooner by the City Council.
10. Severability. If a court of competent jurisdiction declares any provision in this
Ordinance to be contrary to law, such declaration shall not affect the validity of
the other provisions of this Ordinance.
11. Publication. The City Council directs the City Clerk to publish a summary of this
Ordinance. The summary shall consist of the title of this Ordinance. The City
Council directs the City Clerk to publish a copy of this Ordinance on the City's
website.
12. Effective Date. This Ordinance, as a public emergency ordinance necessary for
the protection of the public health, public safety, public property, or public peace,
shall take effect and be in full force immediately upon its adoption. The
underlying facts necessary to support this emergency declaration are included in
the Recitals clauses above. To remain in effect, however, the City Council must
hold a public hearing regarding this Ordinance within 60 days.
Passed by the City Council of East Wenatchee, at a regular meeting thereof on this
28th day of February, 201 7.
The City of East Wenatchee,
W ashingt0-n
/ f,
City of East Wenatchee
Ordinance 2017-05
Page 4of6
Authenticated:
~~
Dana Barnard, City Clerk
Filed with the City Clerk:
Passed by the City Council:
Published:
Effective Date:
City of East Wenatchee
Ordinance 2017-05
Page 5of6
2/28/201 '1
2/28/201
8 6"l!2o/'1 ,
2/28/201{]
Summary of Ordinance No. 2017-05
Of the City of East Wenatchee, Washington
On the 28th day of February, 2017, the City Council of the City of East Wenatchee,
Washington approved Ordinance No. 2017-05, the main point of which may be
summarized by its title as follows:
An Ordinance of the City of East Wenatchee repealing and replacing
Ordinance No. 2017-03 and adopting an immediate moratorium on the
acceptance of applications for use permits, wireless
telecommunications facility permits, building permits, right of way use
authorizations and franchises for new wireless communication
facilities within the City, to be effective for a period of six months,
declaring an emergency, establishing a public hearing date, and
providing for severability
The full text of this Ordinance is available at www.east-wenatchee.com.
Dated this 28th day of February, 2017.
Dana Barnard, City Clerk
City of East Wenatchee
Ordinance 2017-05
Page 6 of 6