HomeMy WebLinkAboutResolutions - 2018-08 - Authorizing the Mayor to sign ILA, East Wenatchee Water District Agreement for Utility Work and Pavement Overlay Projects on Johnson Place, S. Iowa Ave., Tedford St. SE, S. June Ave., and 1st St. SE - 5/8/2018City of East Wenatchee, Washington
Resolution No. 2018-08
A Resolution of the City of East Wenatchee, Washington authorizing the Mayor
to sign the Interlocal Cooperation Agreement between the City of East
Wenatchee and the East Wenatchee Water District for Utility Work and
Pavement Overlay Projects on Johnson Place, S. Iowa Ave., Tedford St. SE, S.
June Ave., and 1st St. SE, East Wenatchee, WA.
1. Alternate format.
1.1. Para leer este documento en otro formato (espafiol, Braille, leer en voz alta,
etc.), pongase en contacto con el vendedor de Is. ciudad al
alternateformat@east-wenatchee.com, al (509) 884.9515 o al 711 (TTY).
1.2. To read this document in an alternate format (Spanish, Braille, read aloud,
etc.), please contact the City Clerk at alternateformat@east-wenatchee.com,
at (509) 884.9515, or at 711 (TTY).
2. Authority.
2.1. The City of East Wenatchee ("City") is a non -charter code City duly
incorporated and operating under the laws of the State of Washington
2.2. RCW 35A.11.020 and RCW 35A.12.190 authorize the City Council to
organize and regulate its internal affairs and to define the powers, functions
and duties of its officers and employees.
2.3. RCW Chapter 39.34 authorizes local governmental units to make the most
efficient use of their powers and resources by enabling them to cooperate
with other localities in the provision of services and facilities under a duly
executed interlocal cooperative agreement.
3. Recitals.
3.1. The City's Transportation Benefit District schedule included overlaying the
following streets in 2018: Johnson Place, S. Iowa Ave., Tedford St. SE, S.
June Ave., and 1st St. SE.
32. The East Wenatchee Water District ("District") planned to replace water
mains and relocate meter boxes within the streets referenced above.
3.3.It is in the best interests of the community and those two agencies to
coordinate their respective projects to make the most efficient use of City
and District resources and to reduce disruption of these transportation
routes.
City of East Wenatchee Resolution 2018-08
Page 1 of 2
THE CITY COUNCIL OF THE CITY OF EAST WENATCHEE DO RESOLVE AS
FOLLOWS:
4. Authorization. The City Council authorizes the Mayor to sign the "Interlocal
Cooperation Agreement between the City of East Wenatchee and the East
Wenatchee Water District for Utility Work and Pavement Overlay Projects on
Johnson Place, S. Iowa Ave., Tedford St. SE, S. June Ave., and 1st St. SE, East
Wenatchee, WA." that is attached to this resolution as Exhibit A.
5. Severability. If a court of competent jurisdiction declares any provision in this
Resolution to be contrary to law, such declaration shall not affect the validity of
the other provisions of this Resolutions.
Recording. Once the Interlocal Agreement is signed by all necessary parties, the
City Council directs the City Clerk to file the signed original Interlocal
Agreement with the Douglas County Auditor and post it on the City's website.
7. Effective Date. This Resolution is effective immediately. The Interlocal
Agreement becomes effective once it has been recorded by the Douglas County
Auditor.
Pas,
d by the City Council of East Wenatchee, at a regular meeting thereof on this
day of 2018.
The City of Aast W
I�
Attest:
Maria Holman, City Clerk
p ved as E
Devin Poulson, City Attorney
Filed with the City Clerk: 5- q-.201 S-
Passed by the City Council- 5, 8, z018
Effective Date: 5, S • y018
City of East Wenatchee Resolution 2018-08
Page 2 of 2
Filed for and Return to:
Maria Holman, City Clerk
City of East Wenatchee
271 9th Street NE
East Wenatchee, WA 98802
Thad L. Duvall_Auditor, Douglas County, WA.
ANLOAOR Pages: 6 Recorded
$7900511612018 at 0331 t59PM,
CITY OF EAST WENATCHEE
The information contained in this boxed section is for recording purposes only pursuant to ROW 36.18 and RCW
65.04, and is not to be relied upon for any other purpose, and shall not affect the intent of any warranty contained in
the document itself.
Document Title: Interlocal Cooperation Agreement Between the City of East Wenatchee and
the East Wenatchee Water District for Utility Work and Pavement Overlay
Projects on Johnson Place, S. Iowa Ave., Tedford St. SE, S. June Ave., and
1st St. SE
Grantor(s): City of East Wenatchee and East Wenatchee Water District
Grantee(s): City of East Wenatchee and East Wenatchee Water District
Reference Number(s) of Document Related, Assigned or Released: Not applicable
Abbreviated Legal Description Not applicable
Complete or Additional Legal Description on page _ of Document — Not applicable
Assessor's Parcel Number: Not applicable
Filed with the Auditor pursuant to RCW 39.34.040
Interlocal Cooperation Agreement Between the City of East Wenatchee and the
East Wenatchee Water District for Utility Work and Pavement Overlay Projects on
Johnson Place, S. Iowa Ave., Tedford St. SE, S. June Ave., and let St. SE
This Interlocal Cooperation Agreement ("Agreement") is hereby entered into by and
between City of East Wenatchee ("City") and the East Wenatchee Water District
("District") sometimes collectively referred to as the "Parties".
WHEREAS, the City is engaged in road improvement projects involving overlaying
the following streets: Johnson Place, S. Iowa Ave., Tedford St. SE, S. June Ave., and
1st St. SE., East Wenatchee, Douglas County, Washington ("Projects"); and,
WHEREAS, the District desires to replace a portion of the water main within the
Projects and relocate meter boxes before final paving is installed; and,
WHEREAS, the City and the District desire to cooperate in the replacement of
utilities prior to and during the construction of the Projects;
NOW, THEREFORE, in consideration of the foregoing, the City and the District
agree as follows:
1. Purpose. The purpose of this Agreement is to provide for the replacement of the
water main and meter relocations within the Projects before the road
improvement overlays occur.
2. Scope of Work. The scope of work associated with the City's Project is set out in
Exhibits A and B, which are attached hereto and incorporated herein by this
reference. The general location of the Projects is illustrated in Exhibit A. A cost
estimate containing a preliminary list of bid items associated with replacing the
water main and meter relocations is set forth in Exhibit B as Schedule A. The
cost of the street overlay Projects is set forth in Exhibit B and is noted as
Schedule B.
Interlocal Cooperation Agreement City of East Wenatchee and East Wenatchee Water District for Utility Work and
Pavement Overlay Projects
Page 1 of 6
3. City's Obligations. The City shall:
3.1. Provide the District with the conceptual engineering design on plan and
profile sheets provided by the City's consultant; and any special provisions
for the overlay Project.
3.2.Assume all liability associated with City -provided information for the design
and specifications for the overlay Projects being included within the Projects
as described in Exhibits A and B.
3.3.As provided for in paragraph 8 of this Agreement, reimburse the District for
all costs associated with the development of the overlay Project.
3.4. Be responsible for its engineers coordinating with the District and its
consultant on all aspects of design and contract document preparation.
4. District's Obligations. The District shall:
4. 1. Incorporate the engineering design and specifications of the City's roadway
construction plans for the Projects in the water main replacement project, as
described in Exhibits A and B.
4.2.Administer the construction contract, including:
4.2.1. Scheduling the construction work;
4.2.2. Disbursement of payments to the roadway contractor; and
4.2.3. Administration of change orders.
4.3. Provide field engineering, including survey control and construction staking.
4.4. Provide all construction inspection, including contractor supervision and
field laboratory services.
4.5. Be responsible for the administration, management and budget for this
Project.
5. Reservation of Right to Inspect. The District agrees that the City reserves the
right to inspect and approve all work done on the Projects prior to the City being
obligated to pay the District its costs for such work.
6. Change Orders. No change orders for the City's portion of the Projects shall be
approved by the District without prior written authorization from the City.
7. Duration and Termination. This Agreement shall become effective upon the
signing of the Agreement by both Parties and recording with the Douglas County
Auditor. This Agreement will terminate upon the completion of the Projects, and
the final payment for the street overlay portion of the Projects is received by the
District from the City.
8. Cost. The costs associated with City's Projects is set out in the lowest responsible
bid for the items listed as Schedule B on Exhibit B, including a pro rata amount
of the engineering and mobilization costs ("Total Cost"). The City shall
Interlocal Cooperation Agreement City of East Wenatchee and East Wenatchee Water District for Utility Work and
Pavement Overlay Projects
Page 2 of 6
reimburse the District an amount equal to the Total Cost, subject to the terms of
this Agreement, as adjusted for change orders as set forth herein. The estimated
Total Cost is $147,271 plus an additional estimated cost for engineering of
$2,000. The City shall make periodic progress payments to the District. Each
progress payment, subject to the terms of this Agreement, and the final payment
are due within 30 days of the date the payment request is mailed by the District
to the City. The City must receive the payment requests by the loth day of each
month in order to meet the 30-day requirement.
9. Records. The District shall keep and maintain accurate and complete cost
records pertaining to the Project and this Agreement. The City shall have full
access and the right to examine any such records during the term of this
Agreement. All records, books, documents and other materials maintained,
prepared, or issued by the District in the implementation of this Agreement
shall be the property of the District, which shall have the responsibility of the
retention and release of those materials.
10.Indemnity. The District shall indemnify, defend and hold harmless the City, its
officers, agents and employees, from and against any and all claims, losses or
liability, or any portion thereof, arising from injury or death to persons or
damage to property occasioned by any negligent act, omission or failure of the
District, its officers, agents, and employees, in connection with the work
described in this agreement, or arising out of the District's non -observance or
non-performance of any law, ordinance, or regulation applicable to the domestic
water line portion of the Project.
11. Severability. In the event that any provision of this Agreement shall be
determined to be unenforceable or otherwise invalid for any reason, such
provision shall be enforced and validated to the extent permitted by law. All
other provisions of this Agreement are severable, and the unenforce ability or
invalidity of any single provision hereof shall not affect the remaining
provisions.
12.Disputes If a dispute arises under this Agreement, authorized representatives of
each party shall meet and negotiate in good faith to attempt to resolve the
dispute. A dispute arising out of this Agreement that is not resolved by good -
faith negotiation shall be resolved by private arbitration. As part of the
arbitration award, the substantially prevailing party shall be entitled, in
addition to other relief, to such reasonable attorneys' fees and costs as
determined by the arbitrator.
13. Construction. This Agreement contains the entire agreement between the
Parties with respect to the subject matter hereof and supersedes all prior
agreements or understandings among the Parties with respect thereto. This
Agreement may be amended only by an agreement in writing signed by the
Parties.
hiterlocal Cooperation Agreement City of East Wenatchee and East Wenatchee Water District for Utility Work and
Pavement Overlay Projects
Page 3 of 6
Exhibit A
a
m
a
a
a
E
Rolls Ct z
tj
a
6th PI NE
no
o
Rolls PI
c�z
c7
z
m
(7
5th St NE
0
E
E
N
N
O W
m
4[h St NE
v
Degage St
m
m
3rd St NE
�
3
2nd St NE
o
z
z
w
m
m
<
a
72
N
L
a
Em
o�
m
�
o
`o
=
z
Z
z
�
z
Grant Rd
m
`m
>
Tedford St SE
Simon St
'o
a
m
3
o
c
0
cn0
15�P
tS
rn
p
v
C)
d
1st St SE
1st St SE c
`a
0
>
a
no
3
0
m
>
t
o
=
a
W
2nd St SE
N
A
❑
m
co
d�
O
v
E
0
g
..,
x
to
Park roy PI
rn 2nd St SE
m
2nd St SE
w
V
W+ I!
Legend
2018 Paving Limits
— City Streets
0 250 500 1,000 Feet
2018 Residential
Overlay Program
This map is Intended for general purposes only. The City of
East Wenatchee makes no representation as to the accuracy
or current condition of the data shown on this map.
Interlocal Cooperation Agreement City of East Wenatchee and East Wenatchee Water District for Utility Work and
Pavement Overlay Projects
Page 5 of 6
Exhibit B
East Wenatchee Water District
2018 Steel Main Replacements
Smith Excmtlon
Item
Description
Quantity
Unit Price
Total Price
Al
Mobilization
1 LS
$14,000.00
$14,000.00
A2
Record DmMngs
1 LS
$2,000.00
$2,000.00
A3
Force Account
1 LS
$10,000.00
$10,000.00
A4
Construction Signage and TCS
1LS
$1,670.00
$1,670.00
A5
Flagging
400 Hr
$55.00
$22.600.00
A6
Crushed Surfacing Base Course - extra depth
100 Tan
$22.00
$2,200.00
A7
Commercial HMA CL 1/2-Inch, 2" depth
350 Ton
$196.00
$68,600.00
A8
I Commercial HMA CL 1/2-Inch, 3" depth
210 Ton
$163.00
$34,230.00
A9
Repair Existing Side Sewer or Irrigation
15 EA
$1,800.00
$27,000.00
A10
Pothole
108 Ea
$280.00
$30,240.00
All
Rock Excavation
50 CY
$120.00
$6,000.00
Al2
Shoring or Extra Excavation Trench
i LS
$1,100.00
$1,100.00
At
DI Pipe for Water Main, 4 in. Dlam.
30 LF
$52.00
$1,560.00
A14
DI Pipe for Water Main, 6 In. Diam.
88 LF
$48.00
$4,224.00
A15
DI Pipe for Water Main, 8 In. Dlam.
5620 LF
$52.50
$295,050.00
A16
DI Pipe for Water Main, 12 In. Diann.
108 LF
$95.001
$10,260.00
A77
Connection to existing at 2nd St SE and S Iowa Ave
1 LS
$2,600.00
$2,600.00
A18
Connection to existing at 1st St SE and S. Jarvis Aye
1 LS
$2,400.00
$2,400.00
A19
Connection to existing at tat St SE and S. June Ale
1 LS
$3,200.00
$3,200.00
A20
Connection to existing at S. June Ave and SE Tedford St
1 LS
$2,600.00
$2,600.00
A21
Connection to existing at S. June Aye and Grunt Rd
1 LS
$3,000.00
$3,000.00
A22
Connection to existing at S. Iowa Aye and SE Tedford St
2 LS
$7,000.00
$14,000.00
A23
Connection to existing at Johnson PI NE
1 LS
$3,250.00
$3,250.00
A24
Connection to existing at 4th St NE near Eastmont
1 LS
$3,200.00
$3,200.00
A25
Connection to existing at 4th St NE near Johnson PI BE
1 LS
$2,500.001
$2,500.00
A26
Connection to existing at N. Empire Ave and 34th St NW
1 LS
$11,500.00
$11,500.00
A27
Connection to existing at 34th St NW and NW Dadd Ave
1 LS
$2,600.00
$2,600.00
A28
Connection to existing at 34th St NW and N. Cascade Aye
1 LS
$4,850.00
$4,850.00
A29
Abandonment of Terminated Water Facilities
1 LS
$14,200.00
$14,200.00
A30
Casing Sleeve- 14 In. Diann.
100 LF
$71.00
$7,100.00
A31
Gate Valve 4In.
2 Ea
$700.00
$1,400.00
A32
Gate Valve 6 In.
1 Ea
$926.00
$925.00
A33
Gate Valve 8 In.
22 Ea
$1,360.00
$29,920.00
A34
Gate Valve 12 In.
1 Ea
1 $2,500.001
$2,500.00
A35
Adjust Vahe Box
27 Ea
$460.001
$12,420.00
A36
Hydrant Assembly
5 Ea
$5,200.00
$26.000.00
A37
Hydrant Guard Post
8 Ea
$450.00
$$600.00
A38
Reconnect 1 In. Diann. Service
46 Ea
$1,100.00
$50,600.00
A39
Reconnect 1.5 In. Dam. SeMce
29 Ea
$1,400.00
$40,600.00
A40
SeMce line extension
461 LF
$11.00
$5,071.00
A41
Spare water seMce
1 Ea
$2,150.00
$2,150.00
A42
CDF Watermain
20 LF
$715.00
$14,300.00
SUBTOTAL
Sales Tax @ 8.2 %
TOTAL AMOUNT BID SCHEDULE A
$796,620.00
$65,322.84
$861,942.84
B7
Mobilization
1 LS
$3,100.00
$3,100.00
B2
Project Temporary Traffic Control
1 LS
$3,200.00
$3,200.00
B3
Pavement Repair HMA CL 1/2-Inch, 2" depth
12 Ton
$118.00
$1,416A0
B4
HMA Owday CL 3/8-inch, 1.25 Inch depth
16500 BY
$7.40
$122,100.00
B5
Planing bituminous palement
95M LF
$1.00
$9,500.00
B6
Adjust Manholes and Catch Basins
9 EA
$340.00
$3,060.00
B7
Adjust Vale Box
5 EA
$475.00
$2,375.00
B8
Adjust Monuments
SEA
$420.00
$2,520.00
TOTAL AMOUNT BID SCHEDULE B
$147,271.00
TOTAL of Schedule A and Schedule B $1,009,213.84
Interlocal Cooperation Agreement City of East Wenatchee and East Wenatchee Water District for Utility Work and
Pavement Overlay Projects
Page 6 of 6
14. Mutual Negotiation and Construction. This Agreement and each of the terms
and provisions hereof are deemed to have been explicitly negotiated between,
and; mutually drafted by, the Parties, and the language in all parts of this
Agreement shall, in all cases, be construed according to its fair meaning and not
strictly for or against either Party.
15. Governing Law; Venue. This Agreement is governed by the laws of the state of
Washington, without regard to its conflict of law provisions.
IN , NESS W REOF, the Parties hereto have executed this Agreement on the
day of , 2018.
CITY OF EAST WENATCHEE,
WASHINGTON 1--,
C. Lacy,
ATTEST:
�2LG� 'f: 1-1dwi?CLg -
City Clerk
APPROVED AS TO FORM:
EAST WENATCHEE WATER
DISTRICT
Commiloner
Interlocal Cooperation Agreement City of East Wenatchee and East Wenatchee Water District for Utility Work and
Pavement Overlay Projects
Page 4 of 6