HomeMy WebLinkAboutOrdinances - 2009-21 - Adopting the Final Budget of the Greater East Wenatchee Storm Water Utility for 2010 - 12/15/2009CITY OF EAST WENATCEE, WASHINGTON
ORDINANCE NO. 11 •
AN ORDINANCE OF OF EAST WENATCHEE,
ADOPTING THE FINAL BUDGET OF THE
GREATER EAST WENATCHEE STORM WATER UTILITY
FOR • ON •
2010, AND APPROVING ORDINANCE SUMMARYFOR
PUBLICATION.
Recitals
a. Preamble.
i. The City of East Wenatchee ("City") is a non -charter code city duly
incorporated and operating under the laws of the State of Washington.
ii. The City Council of East Wenatchee ("City Council") adopted Resolution
No. 98-03 on March 16, 1998 and the Douglas County ("County") Board
of Commissioners adopted Resolution No. 98-12 on March 17, 1998.
These resolutions authorized the execution of the Interlocal Cooperation
Agreement Between Douglas County and the City of East Wenatchee for
Storm and Surface Water Management ("SWU Interlocal Agreement") for
the purpose of providing a stable funding source for improvements to the
drainage system and general operation and maintenance of the stormwater
systems.
iii. The City and Douglas County ("County") established separate Stormwater
Utilities in accordance with the provisions of RCW Chapter 35.67, for the
City, and RCW Chapter 36.89 for the County. In accordance with the
SWU Interlocal Agreement, the stormwater utilities are jointly managed as
the "Greater East Wenatchee Storm Water Utility" by a Management
Team made up of staff and elected officials from each jurisdiction.
iv. In accordance with Section 5.03 of the SWU Interlocal Agreement the
City Council finds that it is in the best interests of the City and its citizens
to set the Greater East Wenatchee Stormwater Utility Budget for 2010.
b. Authority.
i. RCW 35A.33.020 permits a separate budgeting process for the adoption of
a municipal utility budget.
ii. EWMC 13.10.090 and the Section 5.03 of the SWU Interlocal Agreement
require the approval of the budget by the City Council and the Board of
County Commissioners.
Section 1: Purpose. EWMC 13.10.090 and the SWU Interlocal Agreement require the
approval of an annual budget by the City Council and the Board of County
Commissioners.
ORDINANCE NO. 2009- Z-1
Page 1 of 3
Section 2: Budgetpted, In accordance with the SWU Interlocal Agreement and the City
Municipal Code, the City Council adopts, by this reference, the final budget of the
Greater East Wenatchee Storm Water Utility for the fiscal year 2010 attached as
Exhibit A to this ordinance.
Section 3: Severability. If a court of competent jurisdiction declares any provision in this
Ordinance to be contrary to law, such declaration shall not affect the validity of
the other provisions of this Ordinance.
Section 4: Transmittal. The City Clerk shall transmit a complete copy of the Greater East
Wenatchee Stormwater Utility final budget for 2010 as adopted, together with a
copy of this adopting ordinance to the Division of Municipal Corporations of the
State Auditor and to the Association of Washington Cities.
Section 5: Publication. The City Council directs the City Clerk to publish a summary of this
Ordinance. The summary shall consist of the title of this Ordinance.
Section 6: Effective Date. This Ordinance becomes effective five days after the date its
summary is published.
Passed by the City Council of East Wenatchee, at a regular meeting thereof on this 15"
day of }��+� v� ho,- , 2009.
ATTEST:
1- I -II VW"WAZz.loy
APPR ED AS TO APPR?�E' ' O [LY:
L
DEVtK OUL ff , CIT ATTORNEY
FILED WITH THE CITY CLERK: 11/18/09
ORDINANCE NO: 4009 'a 1
PASSED BY THE CITY COUNCIL:
PUBLISHED ON: lzhf�/Oq
ORDINANCE NO. 2009- 4
Page 2 of 3
SUMMARY OF ORDINANCE NO. 2009-�
Of the City of East Wenatchee, Washington
On the dayofhx,�mber 2009, the City Council of the City of East Wenatchee,
Washington approved Ordinance No. 2009-91 , the main point of which may be summarized by
its title as follows:
AN ORDINANCE OF THE CITY OF EAST WENATCHEE,
WASHINGTON, ADOPTING THE FINAL BUDGET OF THE
GREATER EAST WENATCHEE STORM WATER UTILITY
FOR THE FISCAL YEAR COMMENCING ON JANUARY 1,
2010, AND APPROVING AN ORDINANCE SUMMARY FOR
PUBLICATION.
Upon request, the City will mail a full text of this Ordinance.
Dated December, 1�5� 2009
ORDINANCE NO. 2009—>1
Page 3 of 3
Exhibit
00• Ord 2009-
GREATER
Page 1
STORM WATER UTILITY
2010 BUDGET REQUEST
SUMMARY
Does not include NPDES Permit Requirements
2010
PROPOSER
Expenditures
$ 1,281,621
*1
Administration
$i 122,850
A-
Debt Redemption & Interest
$, 185,371
Maintenance
$ 160,000
A-
Transfer out
$' 250,000
�fr
Capital/Construction
$ 548,000
Ar
ER&R
$; 15,300
Revenues
$ 976,060
*
Fees "increase noted below in NPDES SW Requirements
$ 675,000
*
Interest
$:: 7,550
O&M interest
1,000'
Capital Fund - investment interest
1,000
PWTF Loan interest
_500
ER&R interest
50
Disaster Account interest
5,000
Transfer in
$ 250,000
*
ER&R
$ 43,500
Beginning Balance
$3,478,553
Operation and Maintenance
$ 400,322
Ar
Capital Account
$ 2,654,642
Equipment ER&R
$ 33,044
Disaster Reserve Account $ 390,545
Ending Balance
$ 3,173,082
NPDES MUNICIPAL S TORMWA TER REQUIREMENTS - $5:2010/ $10:2011
2010 2011
Proposed ANTICIPATED
Expenditures
$ 227,698,
$ 257,000
A-1
Douglas Count
$' 112,200
125,000
*1
City of East Wenatchee
$ 115,398
$ 132,000
R@venues `NPDES revenue from service charge increase
$ 286,000
$ 247,000
*1
Douglas Count
$, 158,600
117,200
*1
City of East Wenatchee
$' 127,400
:
$ 129,800
Beginning Balance
$
$ 58,402
Ending Balance
$ 58,402
48,402
12/17/2009 Exhibit A
Ord 2009-21
Page 2
Expenditures
Administration
err SW Utility
2008
2009
2010
PROPOSED
$1, 99,637
$695,162
$824,221
368,258
110,800
$122,850
346,136
78,500
$ 87,260'
538
13
c
Billing and Collection
17,262
18,000
20,000
c
Indirect Cost
11 250
14
c
Accounting
4,500
5,000
5,000
23
c
Budgeting
3,000
3,600
3,000
26
c
Public Information
2,500
3,000
27
c
Reconcile billing with GIS/assessor
400
10,000
5,000
c
Capital Facility Plan
40,000
40,000
594
38
a
Vactor Truck
320,974
* County
14,731
19,000
$ 19,000
538
10
o
General Administration
3,646
4,000
4,000
20
a
lAdministration - Planning, Conservation, R&D
8,529
8,500
8,500
21
c
IGIS Layer for improvements
2,556
3,000
1
3,000
25
c
I Inventory of Facilities
1,500
1,500
22
a
1 Ordinance Revision
2,000
2,000
* City
7,391
13,300
$ 16,600
538
10
c
General Administration
4,500
5,000
5,000
25
c
Administration - Planning, Conservation, R&D
2,000
1,200
1,500
G
Accounting666
3,600
3,600
c
GIS Layer for improvements
225
500
1,000
22
a
Inventoryof Facilities
1,000
3,500
20
c
Ordinance Revision
2,000
2,000
Debt Redemption Interest
163,344
214,352
$185,371
591/592I
Sterling Detention Basin 1994 Bond - ends 2009
3,288
3,285
Canyon B 1994 Bond - ends 2009
51,512
51,472
Glendale 1990 PWTF- ends 2009
14,677
14,008
11th St. Detention Basin PWTF- ends 2020
13,103
12,987
12,871
Canyon A Pre -Construction (PWTF)-2024
17,600
17,600
17,500
Canyon A Construction PWTF 2025
63,140
100,000
135;000
Canyon A Pre -Construction (PWTF)-2026
24
15,000
20,000
Maintenance
102,935
160,000
$160,000
538
35
a
County
77,935
80,000
80,000
35
C.
City
25,000
80,000
80,000
• Construction (Construction Summary Attachment)
-
-
c
Revenue
116,744
1,337,756
548,000
c
Expenditures
116,744
1,337,756
548000
• Transfer Out
465,000
210,000
$356,000
597
c
Capital Account
1
450,000
180,000
200,000
597
C.
Disaster Account
15,000
30,000
50,000
G
County NPDES Program -proposed
48,600
G
City NPDES Program -proposed
Revenues
655,147
662,000
782,000`
343
83
G
Storm Water Utility Fees
652,771
696,000
700,000
Amount Billed
652.771
695.000
760,000
Estimated Amount Collected
653,181
660,000
675,000
Refund
-410
G
Proposed revenue based upon addnl $5 per County ESU
48,600
G
Proposed revenue based upon addnl $5 per City ESU
57,400
G
I Disaster Reserve Account (significant/catastrophic events
361
a
I Interest
2,376
2,000
1,000
Beginning Balance
$ 621,621
$ 173,632
$ 400,322
Ending Balance $ 173,632 $ 140,480 ;$ 368,101�
Balance through 10/31/09 $ 400,322
� 4 �
12/17/2009 Exhibit A
Ord 2009-21
Page 3
CAPITAL
Expenditures
o- Transfer Out -for Construction Projects
C Canyon A PWTF 15% Match - Construction
a Canyon A PWTF 85% Loan - Construction
C Can on A VMPW To River 15% Match - Pre -Con
C I Canyon A VMPW TO River 85% PWTF Pre -Con
c Equipment urchase - Vactor Truck Transfer to
C, Flood Pro ect Canyon A
c Flood Project Sand Canyon
Revenues
c Transfer In - from M&O Account
G Transfer In -from PWTF Loan Construction
c I Transfer In -from PWTF Loan Precon
c.1 Flood Project Stimulus Package Canyon A
c-1 Flood Proiect Stimulus Packaae Sand Canvon
Ending alnce
balance through 10/31/09
2008
2009
2010
PROPOSED
$437,718
$ 1,337,756
$ 58,000
54,500
70,000
140,000
67,500
61,200
382,500
346,800
52,907
159,593
1 0
9,337
28,163
0
320,974
50,000
580,000
706,401
832,600
201,500
450,000
180,000
200,000
212,500
50,000
580,000
34,312
20,000
1,000
9,589
2,500
500
$1,738,728
$2,007,411
$ 2,654,642
$2,007,411
$1,602,156
$2,308,142
Greater St Wenatchee
12/17/2009 Exhibit A
Storm t r Utility
Ord 2009-21
2010 Budget Request
Page 4
CATASTROPHIC F
($400, 000 Maximum Balance)
2008 2009 2010 2011
PROPOSED future
Expenditures
$ 2,500
$ 5,000
$ 10,000
$ 10,000
c Transfer Out (to O&M storm events)
c I Transfer Out (annual - to Significant Flood)
1 2,500
1 5,000
1 10,000
10,000
Revenues
$24,066
$35,000
$64,000 `
$54,000
c Transfer In - from M&O Account)
15,000
30,000
50,000
50,000
.1 Investment Interest
9,066
5,000
4,000'
4,000
61 Beginning Balance
$291,693
$313,259
$312,427
$356,427
Ending Balance
$313,259
$343,259
$366,427 `
$400,427
balance through 10131109
$312,427
IGIFIC T FL®
($100,000 Maximum Balance)
2008 2009 2010 2011
PROPOSED future
Expenditures
$ -
$ -
$ -
$ -
c I Transfer Out (to O&M storm events)
Revenues
$4,766
$6,200
$11,000:
$11,000
c, Transfer In (annual - from Catastrophic Flood)
2,500
5,000
10,000'
10,000
e Investment Interest
2,266
1,200
1,000
1,000
01 Beginning Balance
$72,923
$77,689
$78,118 "'"
$89,118
OFEnding Balance
$77,689
$83,889
$89 118
$100,118
balance through 10131109
1
1
1
1 $78,118
It is anticipated that both the Catastrophic Flood and Significant Flood Accounts will be fully funded
in 2011. This estimate does not account for expenditures that may be warranted in the event of a
Significant or Catastrophic Flood event.
It is recommended that the maximum value for these accounts be increased as noted below:
Catastrophic = $500,000
Significant = 150,000
VICTOREquipment ER&R
= Equipment
"PUKAULA111•
enitures
c Transfer Out (ILA for maintenance)
c Equipment Insurance
c Equipment Rental Contracted Services
c Equipment Rental General Operations
c Capital Expenditures
c Transfer Out (replacement)
• Revenues
c Transfer In - rental County SWU
c Transfer In - rental City SWU
c Transfer In - rental County Roads
c Transfer In - rental City Streets
c Transfer In - rental to other entities
c Investment Interest
• Beginning Balance
• Ending Balance
balance throuah 10131109
��■■
MM
.Mm
• IME
243
85
1,298
0
12/17/2009
M
12,000
6.00(
2,500
2,500
1,000
0
$44,550
18,000
18,000
6,000
2,500
0
50
$12,994
$45,544
$33, 044
M
we
M
0 N
C.
C.
C.
9S
C
C.
c
C
c
c
c
c
c
c
a
GREATER EAST WENATCHEE
12/17/2009 ExhlbltA
STORM WATER UTILITY
Ord 2009-21
2010 BUDGET REQUEST
Page 6
Ml IFRR=H-
nditures
nstruction Projects
2008
2009
2010
PROPOSED
$116,744
$1,337,756
$648,000
$ 109,244
$ 1,267,756
$ 408,000
Canyon A (Pre -construction)
62,244
237,756
0
P I - Canyon A, Stage 1, Eastmont to Valley Mall Parkway completed
Pl - Canyon A, Stage 2 Valley Mall Parkway to SR 28
62,244
187,756
Pl - Canyon A, Stage 3 - 2010 WSDOT(SR 28 to River)
Pl - Canyon A, Stage 3(a) - 2010 Trash Rack @ Eastmont ($15,000)
0
Phase 2 - 3rd NE & Mary ($75,000 remaining in permits & contracting)
50,000
Canyon A (Construction)
450,000
408,000
PI - Canyon A, Stage 1, Eastmont to Valley Mall Parkway completed
0
Pl - Canyon A, Stage 2 Valley Mall Parkway to SR 28
450,000
0
Pl - Canyon A, Stage 3 - 2010 WSDOT(SR 28 to River)
363,000
Pl - Canyon A, Stage 3(a) - 2010 Trash Rack @ Eastmont ($45,000)
45,000
P2 - 3rd NE & Mary ($2. 1 million)
0
Sand Canyon Flood Hazard Mitigation Project
580,000
0
Sand :Canyon - pre construction ($500,000 design & permiting)
580,000
1
Sand Canyon - construction ($2.5 million)
0
WSDOT Stormwater Agreement
mall Storm Water Improvements
0
47,000
7,500
70,000
140,000
[Do�ulas County improvement Projects
35,000
70,000
East Wenatchee Improvement Projects
7,500
35,000
70,000
nues
$ 116,744
$ 1,337,756
$ 548,000
Transfer In for Construction (from Capital Acct.)
54,500
70,000
140,000
PVVTF Canyon A - Construction
382,500
346,800
15% Match - Construction (from Capital Acct.)
67,500
61,200
PWTF Canyon A, VMPW to River- Preconstruction
52,907
159,593
15% Match - Pre -Construction (from Capital Acct.)
9,337
28,163
DOE Flood Control Grant (East Wenatchee Lead Agency)
- Canyon A - Stimulas Package
50,000
0
Sand Canyon - Stimulas Package
580,000
(000
0
;truction Summary (Revenue -Expenditures)
!0,
0
0
0
Lcrmar_�M. JkYr7m. IRR-7-ZA
Storm Water Utility
ANTICIPATED COSTS HAVE BEEN MINIMIZED TO Exhibit A
REFLECT COOPERATIVE EFFORTS Ord 2009-21
Page 7
1,11lUl1j="&TM=4 107NI"
DOUGLAS COUNTY
2008
2009
2010
2011
PROJECTED
PROPOSED
FUTURE
Expenditures
$6,000
$112,200
$125,000
•
Administration
$5,000
1 $3,500
$3,5001
•
NPDES
Municipal Permit
Expenditures (Permit Core Elements)
$28,019
$ 247,514
$ 108,700
$ 121,500
Cr
Stormwater management Program
14,707
21,000
3,000
3,000
•
Public Education and Outreach
2,000
5,000
4,000
4,000
•
Public Involvement and Participation
2,812
5,325
5,000
5,000
•
Illicit Discharge Detection and Elimination (IDDE)
2,500
22,174
7,500
10,000
•
Construction Site Stormwater Runoff Control
75,000
20,000
25,000
•
Post -Construction Stormwater Management
50,000
30,000
35,000
•
Pollution Prevention and Good Housekeeping
35,500
25,000
25,000
•
TDML Requirements
0
0
0
•
Monitoring
0
0
0
G,
Reporting Requirements
6,000
6,000
6,000
-0
6,000
1
1 G1
Other Programatic Stormwater Elements (UIC Registration)
25,000
5,000
5,000
1
1 GjAnnual
Permit Fee - Douglas County
2,515
3,200
3,500
Revenue
$28,019
$90,731
$168,600,
$117,200
G
I DOE FY 06 Grant Revenue ($75000)
$18,019
$56,981
$40,000
C-1
DOE FY 08 Grant Revenue ($43750)
$10,000
33,750
0
C*
DOE FY 10 Grant Revenue ($50,000)
50,000
G
Transfer from O&M (amount based on $5 per County ESU
48,600
97,200
C*
Stormwater Development Fees (proposed)
20,000
20,000
eginning Balance
t
$ 0
J�l Al
$46,400
0
Ending Balance
$0
6 783
$46,400
$38,600
Greater East Wenatchee
Storm Water Utility
2010 Budqet Request
NPDES Municipal Permit Requirements
T-PROJECTED
2008
2009
2010
2011
PROPOSED
FUTURE
City of East Wenatchee
Expenditures
$116,398
$132,000
•
Administration
$3,600.
$5,000
•
NPDES Municipal Permit
* Expenditures (Permit Core Elements)
$19,125
$ 63,097
$ 111,898
$ 127,000
cd
Stormwater Management Program
3,000
4,500
G
Public Education and Outreach
4,000
4,000
G1
Public Involvement and Participation
"5,000
3,000
•
Illicit Di charge Detection and Elimination (IDDE)
12,000
18,000
•
Construction Site Stormwater Runoff Control
18,000
20,000
C.
Post -Construction Stormwater Management
25,000
35,000
•
Pollution Prevention and Good Housekeeping
30,000
30,000
•
TDML Requirements
0
0
•
Monitoring
0,
0
•
Reporting Requirements
4,000
4,000
C-
Other Programatic Stormwater Elements
8,000
5,000
C*,
Annual Permit Fee -City of East Wenatchee
2,898
3,500
* Revenue
$19,125
$53,097
$127,400
$129,800
•
DOE FY 06 Grant Revenue ($75000)
$6,525
$22,952
$35,000,
•
DOE FY 08 Grant Revenue ($43750)
$12,600
30,145
C.
DOE FY 10 Grant Revenue ($50,000) pending through city
35,000
16,000
G
Transfer from O&M (amount based on $5 per City ESU)
57,400
114,800
Beginning Balance
$ -
$
$
$ 12,002
End"Endin Balance
$0
$
$12,002
$ 91802
Note: DOE Grant Revenue is on a reimbursement basis