Loading...
HomeMy WebLinkAbout2018-09-10 - SCJ Alliance - General Agreements / General Service Agreements - 2018-01Agreement Supplement No. 1 The City of East Wenatchee (CITY) desires to supplement the agreement entered into with SCJ Alliance dated March 20, 2017, to provide Professional Engineering Services for the Design and Construction Management of the 2017 Small Stormwater Improvement Project. The parties desire to modify said agreement as follows: 1. Amend Scope of Work a. Phase 10 — Civil Engineering Consulting to Include an Additional Task: Task 3 — Inspection Services $5,000 2. Amend Contract Paragraph 4 — Total Compensation: "The City will pay SCJ Alliance $34,490 [for] performing the services set forth in paragraph 3. This amount is the full compensation for all work performed; for all services rendered; and for all labor, materials, supplies, and equipment, and incidentals necessary to complete the services set forth in paragraph 3." All other provisions in said agreement remain in full force and effect except as expressly modified by this supplement. CITY OF EAST WENATCHEE SCJ ALLIANCE Signature; Signature: gtar25�- Office Principal Steven C. Lacy ayor Name, Title f Date: Al o // V/ Date: 09/05/2018 ATTEST: Maria— �btme--�, ley By: Supplemental Agreement 1 Page 1 of 1 SCJ ALLIANCE CONSULTING SERVICES Amendment #1 — Task 3 Inspection Services East Wenatchee 2018 Small Stormwater Project East Wenatchee, Washington Prepared for: Tom Wachholder Prepared by: Dan Ireland, P.E. Date prepared: September 5, 2018 Scope Overview SCJ Alliance (SCJ) was tasked with the design and construction support of the 2018 Small Stormwater Improvement project for Astor Court and Ashland Avenue. The original contract agreement between SCJ and the City of East Wenatchee (City) had SCJ supporting construction activities and the City providing field inspection services and construction documentation. When construction activities started, City staff availability decreased due to a Public Works management vacancy. SCJ fulfilled the field inspection services and full construction administration for the City during the construction phase. The project was completed on time and resulted in zero change orders. All modifications to the design were resolved in the field in a collaborative relationship between SCJ/City and the contractor. SCJ completed all construction field inspection and construction documentation for the project including material reviews, inspections, contract payment, and final construction. The additional work completed by SCJ for the additional inspection services resulted in an additional $5,000 in fee. This amendment will add a new Task 3 — Inspection services to the existing Phase 10 — Civil Engineering Consulting. Original Contract Amount: Phase 10 — Civil Engineering Consulting $17,000 T&M Phase 20 — Geotechnical Services $6,050 T&M Phase 30 — Survey $5,940 T&M Phase 99 — Expenses $500 T&M Amendment(s) Amendment 1: Phase 10 - Task 3 Inspection Services $5,000 T&M New Contract Amount: $34,490 T&M. ..,®.. .a.. .0. If you have any questions, please feel free to contact me at 509-886-3265 or dan.ireland(c�scialliance.com. Thank you again for the opportunity to work with the City on this project and make it a great stormwater solution for the community. Page 2 of 2