Loading...
HomeMy WebLinkAbout2020-02-18 - RH2 Engineering Inc - General Agreements / General Service Agreements - 2019-01rA. Page No. 1 of 7 Pages Transportation Improvement Board Consultant Supplemental Agreement Agency City of East Wenatchee Project Number 8-3-161(012)-1 Project Name Highline Drive and 31 Street SE Roundabout consuiting Firm RH2 Engineering, Inc. Supplement Phase Supplement for Construction Phase The Local Agency of the City of East Wenatchee desires to supplement the agreement entered into with RH2 Engineering Inc. and executed on March 3, 2019. All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: Section II, SCOPE OF WORK, is hereby amended to include Services During Construction (Exhibit B-1). Subconsultant proposal dated February 3, 2020 (Exhibit G-1-C). Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the Completion Date SUPPLEMENTAL COMPLETION DATE September 4, 2020 Section V, PAYMENT, shall be amended as follows as set forth in Exhibit A MAXIMUM AMOUNT PAYABLE $174,947.10 EXHIBIT A Original Agreement Supplement Total Direct Salary Cost $26,764.93 $20,604.01 $47,368.94 Overhead (including Salary Additives) $50,462.59 $38,846.79 $89,309.38 Fixed Fee $8,029.48 $6,181.20 $14,210.68 Reimbursables $7,770.00 $3,492.80 $11,262.80 Subconsultant Cost $6,928.00 $5,867.30 $12,795.30 Total $99,955.00 $74,992.10 $174,947.10 If you concur with this supplement and agree to the changes as stated above, please sign and date in the appropriate spaces below. Agency Signature Date C f nt Signatu Date Pau R. utive ice Presiden CONSULTANT SUPPLEMENTALAGREEEMENT.DOC Page No. _2_ of 7 Pages EXHIBIT B-1 Scope of Work City of East Wenatchee Highline Drive and 3rd Street SE Roundabout Supplement No. 1 February 2020 Background This Scope of Work is a supplement to the City of East Wenatchee's (City) Highline Drive and 3rd Street SE Roundabout project and details the tasks to be provided by RH2 Engineering, Inc., (RH2) for services during construction, including construction contract administration and on -site observation services. Task 8 — Services During Construction Objective: Provide construction contract administration and observation services for the Highline Drive and 3rd Street SE Roundabout project. This Scope of Work is based on a fifty (50) working days construction project. Construction contract administration services include time before and after the construction is complete. Approach: 8.1 Attend Pre -Construction Conference — Prepare for and provide an agenda and meeting minutes for the pre -construction conference. Attend the pre -construction conference, to be held at RH2, with the project manager and one (1) observer. Provide additional copies of the plans and specifications in accordance with the construction documents. 8.2 Coordinate Materials Testing — Coordinate with a materials testing laboratory to facilitate testing of the concrete, asphalt, and earthwork items in accordance with the Washington State Department of Transportation (WSDOT) standard specifications and construction manual. Materials testing will be provided by CSI, a subconsultant to RH2, as an on -call service. 8.3 Review Submittals — Review submittals for up to fifty (50) materials (Qualified Product Lists (QPLs), Request(s) for Approval of Materials (RAMs), manufacturer certificate of compliance, mix designs, and shop drawings) in accordance with the project plans and specifications. Maintain the RAM on a weekly basis during construction. 8.4 Provide Construction Observation Services — Provide one (1) part-time project observer for an average of four (4) hours per day throughout construction. Provide specialized observation as required for landscape and illumination construction. Observation duties will include the following: a. Monitoring and documenting the construction contractor's daily operations through daily reports and photographs of the construction progress. 1 2/5/20201:55:10 PM J:\data\EW\219-024\00 Contract\Supplement No. 1\Amend No. 1_SOW_3rd St Roundabout.docx City of East Wenatchee Highline Drive and 3rd Street SE Roundabout Page No. 3 of 7 Pages Exhibit B-1— Scope of Work Supplement No. 1 b. Collecting item quantity tickets (IQTs) and measurements of items to be used in preparing the pay estimates. c. Addressing technical issues and questions onsite. d. Collecting and maintaining records for utilities, earthwork, surfacing, concrete, asphalt, and traffic control items. Maintaining the project ledger for payment of contract items. e. On -site coordination with utility purveyors. 8.5 Respond to Requests for Information (RFIs) and Questions and Attend Meetings — Attend weekly site visits by the project manager, or as requested, to participate in project meetings and/or address technical issues, and to respond to construction contractor questions that cannot be addressed in the field by the observer. Prepare a weekly statement of working days. 8.6 Prepare Progress Payments — Prepare four (4) pay estimates based on quantities provided by the observer. 8.7 Review Change Orders — Review and prepare up to two (2) change orders for City approval. 8.8 Prepare As -Built Drawings — Prepare as -built drawings based on observer and construction contractor records. 8.9 Provide Project Closeout — Organize and maintain project records for closeout. Prepare letters as required for substantial completion, physical completion, and project completion. 8.10 Provide Project Management Services — Review invoices and budget throughout the construction phase of the project. Communicate observed status of construction and budget with the City on a monthly basis. Coordinate with staff and contractor, and administer request for sublets, lower tier subcontractor certification, and statements of intent. Set up RH2's construction files; track, assemble, file, and maintain construction documentation. Assist with Transportation Improvement Board (TIB) funding documentation. Coordinate with outside utilities and agencies, including the City, the construction contractor, East Wenatchee Water District, Douglas County Sewer District, Wenatchee Reclamation District, East Wenatchee School District, U.S. Postal Service, Waste Management, Douglas County Public Utility District, Frontier, Charter, Cascade Natural Gas, LINK Transit, and Douglas County Fire District. Assist City staff with public outreach and business coordination. It is anticipated RH2 will respond to questions from the business community by phone or email. Assumptions: The construction project will last fifty (50) working days. RH2 will perform Task 8 services up the level included in the attached Fee Estimate. Additional effort, if needed, will be mutually determined by the City and RH2. RH2 is not responsible for site safety, for directing the contractor or others in their work, or for determining means and methods. 2 2/5/201:55 PM 1:\data\EW\219-024\00 Contract\Supplement No. 1\Amend No. 1_SOW_3rd St Roundabout.dou City of East Wenatchee Highline Drive and 3rd Street SE Roundabout RH2 Deliverables: Page No. —4— of —7— Pages Exhibit 6-1— Scope of Work Supplement No. 1 Pre -construction meeting agenda (15 hard copies). Construction plans and specifications (5 hard copies). Submittal reviews in PDF format. Construction observation reports and photos in PDF format. Responses to RFIs and technical questions in PDF format. Weekly statement of working days in PDF format. Four (4) pay estimates in PDF format. Two (2) change orders in PDF format. As -built drawings in PDF format. Letters of substantial completion, physical completion, and project completion in PDF format. Project records in PDF format. Project Schedule Construction of the project is scheduled to begin in the spring of 2020 and continue for fifty (50) working days. Closeout of the project is currently anticipated in the summer/fall 2020. 3 2/5/20 1:55 PM J:\data\EW\219-024\00 Contract\Supplement No. 1\Amend No. 1_SOW_3rd St Roundabout.doa EXHIBIT D-2 Continued Fee Estimate City of East Wenatchee Highline Drive and 3rd Street SE Roundabout Supplement No. 1 Feb-20 Page No. CJ of 7 Pages TotalHours Description Total Labor Total Subconsultant Total Expense Total Cost ......................................................................................................................................................... Classification Task 8 Services During Construction 1 414 1 $ 65,632 1 $ 5,867.30 1 $ 3,493 1 $ 74,992 PROJECT TOTAL 1 414 1 $ 65,632 1 $ 5,867.30 1 $ 3,492.80 1 $ 74,992.10 J.\a...\EW\219021\00 —N-1\A--N..I FEEIS, 2/5/20202:07 PM i 2SO N W NATCHEE AVE STE N 135 -k'EN FC"F EE. NVA 98801 :r:rvv.cIIrIW.c(ar RH2 Engineering, L.or)structiOn Special Unpecuan February 3, 2020 Highline Dr & 3,d St. Roundabout, Special Inspection and Testing: Erik, Page No. 6 of 7 Pages TR 5096ol4843 l:Aa 5096638534 CELL 509-881-8(W) CSI is pleased to provide you with the following cost estimate for special testing on your project. We understand the scope of work to include concrete and soil compaction testing. The following tables are a breakdown of the tests and time needed to complete the required inspections and tests. Times and cost may vary depending on contractor's construction schedule. Field Testing The following table lists the projected number of time on site. The number of tests and time may vary depending on the contractor's concrete and soil placement schedule. Technician III: Soil Compaction 10 @ $65 $650 Technician III: Concrete Testing 15 @ $65 $975 Technician III: HMA Testing 10 c✓r $65 $650 Total $22,2)75 Laboratory Testing The following table lists the number and types of tests that will be needed. The number of tests may vary depending on requirements. Crushed Surface Gradation 2 @ $75 $150 Crushed Surface Proctor 2 @ $145 $290 Soil Sieve Analysis 2 @ $75 $150 Soil Proctor 2 @ $145 $290 Concrete Cylinder Strength Testing 15 @ $20 $300 Total 1 $ l , 1 80 Mileage and Travel Time: Mileage will be charged at the rate of $0.585 per mile. We estimate the round-trip distance from our office to be 10 miles. CSI is currently involved in projects in the area and will share the travel time and mileage whenever possible. Mileage —10 Round Trips , 10 miles ea. 10 Trips: 100 mi $0.585 $58.50 Travel time @ .5 hr. per trip. 5 hrs. $65 $325 Total $ 5 72 WENATCHEE Page No. 7 of 7 Pages Project Administration These costs are associated with project management and document preparation, report review and technician scheduling. Reports and test results will be faxed or emailed on a daily basis as directed by the client. Secretarial 5 hrs. @ $45 $225 Testing Manager 10 hrs. $85 $850 Total Estimated Cost $5,1OZ.00 Thank you for the opportunity to provide you with this estimate. We look forward to working with you on this and future projects. Please call if you have any questions. Sincerely, CS Derek Nyland, Manager The total fees may be more or less than the estimate depending on project schedule, changes in the scope of services, and unanticipated work effort. If it appears the fees will exceed the estimate, Client will be notified immediately and services will be suspended until receipt of written authorization to proceed. Page 2 of 2