HomeMy WebLinkAbout5201-01-10 - VPR Services LLC - General Agreements / General Service AgreementsAgreement Supplement No. 1
The City of East Wenatchee ("City") desires to supplement the agreement entered into
with VPR Services, LLC ("Consultant") dated August 20, 2019, to provide Personal
Services for conducting pavement rating surveys for all City streets.
As allowed by Section 16, the parties desire to modify said agreement as follows:
6. Compensation —
a. Total Compensation. The City shall pay the Consultant on a per lane mile
basis with a total not to exceed $14,000 for performing the work set forth in
Exhibit A.
All other provisions in said agreement remain in full force and effect except as expressly
modified by this supplement.
CITY OF EAST WENATCHEE
Signature:
C. LacyXayor
Date: l / — .S- zcfl, q
ATTEST:
By:l�-
VPR Services, LLC Agreement Supplement No. 1
Page 1 of 1
VPR SERVICES, LLC
Signature
,- a r J v
Rebecca Mc�}Conna h , Principal
Date: T
Agreement Supplement
No. 1
VPR Services EXHIBIT A July 28,2019
3116 N Pine Ct
Spokane, WA 99205
(509)496-7950
beccamcco@hotmail.com
2019 Pavement Condition Survey
City of East Wenatchee
Scope of Work (provided by VPR Services, LLC):
Work shall consist of providing a pavement condition survey with import into Streetsaver
Pavement Management Program. All ratings will be done by a walking survey, on 100% of
pavement surface. Distresses for flexible pavements will be rated using a modified ASTM
D6433. Distresses rated will include alligator cracking, block cracking, distortions, longitudinal
and transverse cracking, patching, rutting and depressions, weathering and raveling. Rating will
be directly entered in MobileRater and imported into Streetsaver after quality control is
complete. An additional excel file will be supplied to the City with any discrepancies noted
during field work. If requested by City, database corrections will be made directly in
Streetsaver.
To be provided by the City:
The City will provide an excel file of all Street segments to be rated along with a paper map of
highlighted segments.
Page 1 of 2
VPR Services, LLC
Rebecca McConnaughey
(509) 496-7950
beccamcco@hotmail.com
July 28, 2019
Bid Estimate
Pavement Condition Walking Survey
City of East Wenatchee, WA 2019
EED
6r:7.45lane miles @ $120.00/lane mile =
Total cost =
$13,384.00'�
^!YYYYYYYYY�
$13,384.00
*Total estimated cost includes insurance as required by the City of East Wenatchee, fuel,
vehicle use and maintenance, and employee per diem expenses including food and lodging.
Page 2 of 2