Loading...
HomeMy WebLinkAbout9/8/2015 - City Council - City Council Meeting Minutes - Steven C LacyREGULAR SESSION OF THE CITY COUNCIL CONVENED MAYOR STEVEN C. LACY, PRESIDING SEPTEMBER 8, 2015 6:30 P.M. ROLL CALL Mayor Steven C. Lacy Councilmember George Buckner Councilmember Harry Raab Councilmember Frank Collings Councilmember Chuck Johnson - Excused Councilmember Wayne Barnhart - Excused Councilmember Sandra McCourt Councilmember Tim Detering EMPLOYEES INATTENDANCE City Attorney Devin Poulson City Clerk Dana Barnard Finance Director Nick Gerde Public Works Director/Engineer Greg Pezoldt Police Chief Randy Harrison Clerical Assistant Shawn Murison BUDGET ISSUES Finance Director Nick Gerde noted there will be a Budget Committee meeting on September 17, 2015 MAYOR'S REPORT Mayor Lacy reviewed a Memorandum of Agreement (MOA) and 2015 City of East Wenatchee Local 846-W Pay Scale - Appendix A, between the City of East Wenatchee and The Washington State Council of County and City Employees, AFSCME, Council 2, Local 846-W, noting the creation of a Probation Counselor position, modifying duties and responsibilities of the Building Permit Technician, and negotiating wages for the positions, effective as of September 1, 2015. Council Action: A motion was made by Councilmember Detering, second by Councilmember Raab, to approve the MOA, and amend the schedule as presented. The motion carried, 5-0. Mayor Lacy noted that Commissioner Stanton has ordered an appraisal on the Douglas County Area One facility located on 3rd Street, and said he would contact us with a number when available. He indicated the appraisal could take 6-8 weeks. DEPARTMENT REPORT(S) Public Works Director Greg Pezoldt reviewed the 2015 Construction Projects Status Report for September. He noted that Executive Director Jeff Wilkens, Chelan Douglas Transportation Council, will assist City Staff with a presentation to City Officials prior to any decision made for the Valley Mall Parkway/9d' Street NE signal Project. CITY OF EAST WENATCHEE COUNCIL MINUTES SEPTEMBER 8, 2015 CONSENT CALENDAR Items listed below were distributed to Councilmember's in advance for study and were enacted in one motion. Council Action: A motion was made by Councilmember Raab, second by Councilmember Detering, to approve the Consent Calendar as presented. The motion carried, 5-0. 1. Consideration of Minutes — Regular Session, August 25, 2015 2. Consideration of Payables i. 2015 Payables — As of this date, September 8, 2015, Council does approve check numbers 44143 through 44196 in the total amount of $79,664.71. ACTION ITEMS) 15-09-01 Commercial Lease for lease of 88 9 h St. Presented by: Steven C. Lacy, Mayor Council Action: A motion was made by Councilmember Detering, second by Councilmember Buckner, to authorize the City to waive the Seller's obligation to remove all tenants before closing. The motion carried, 5-0. Council Action: A motion was made by Councilmember Buckner, second by Councilmember Collings, to authorize the Mayor to execute the Lease Agreement. The motion carried, 5-0. IMWiT.TiTi�i l Mr. Pezoldt asked to remove Item No. 15-09-02 from the Agenda due to pending negotiations. 15-09-03 Valley Mall Parkway Consultant Agreement Supplement 1. Presented by: Greg Pezoldt, Public Works Director Council Action: A motion was made by Councilmember Detering, second by Councilmember McCourt, to authorize the Mayor to execute a Contract with RH2 Engineers not to exceed $198,873.08 for the construction engineering and inspection of the Valley Mall Parkway Preservation Project. The motion carried, 5-0. 15-09-04 Recommendation to award the bid for the Valley Mall Parkway Preservation Project. Presented by: Greg Pezoldt, Public Works Director Council Action: A motion was made by Councilmember Collings, second by Councilmember Detering, to authorize the Mayor to sign a Contract with Central Washington Asphalt for the construction of the Valley Mall Parkway Preservation Project 2 CITY OF EAST WENATCHEE COUNCIL MINUTES SEPTEMBER 8, 2015 in the amount of $912,539.80. The motion carried, 5-0. 15-09-05 French Avenue Consultant Agreement — Construction Engineering Phase. Presented by: Greg Pezoldt, Public Works Director Council Action: A motion was made by Councilmember Detering, second by Councilmember Collings, to authorize the Mayor to execute a contract with RH2 Engineers not to exceed $23,428.32 for the construction engineering and inspection of the French Avenue Project. The motion carried, 5-0. 15-09-06 A recommendation to award the bid for the French Avenue Improvements Project. Presented by: Greg Pezoldt, Public Works Director Council Action: A motion was made by Councilmember Detering, second by Councilmember Collings, to authorize the Mayor to sign a Contract with Hurst Construction for the construction of the French Avenue Project in the amount of $537,021.37. The motion carried, 5-0. COUNCIL REPORT(S) Mayor Lacy said there is a possibility of funding for the Highline Drive Project. However, a final decision has not been made. He said we are following guidelines, and he will inform Council if the award actually occurs. Mayor Lacy noted that we received a letter from the Department of Ecology (DOE) confirming funding for the Valley Mall Parkway Parking Lot Project in the amount of $405,000. The following reports/minutes were submitted in writim prior to the City Council meeting Mayor Lacy — Minutes from the Chelan -Douglas Transportation Council meeting held on August 13, 2015. Tom Wachholder — Greater East Wenatchee Stormwater Utility (GEWSWU) Capital Project Fee Contribution List, dated August 24, 2015. 7:3� p.m. Hamra 54t C. CAcy •e�� 1ha o