HomeMy WebLinkAbout2019-04-15 - Central Paving LLC - General Agreements / General Service Agreements - 2018-08CD-1
CITY OF EAST WENATCHEE
PUBLIC WORKS AGREEMENT FOR
2019 Residential Overlay
Contract No. 2018-08
Contractor; Central Paving, LLC
This Agreement is entered into by and between the CITY OF EAST WENATCHEE, WASHINGTON, a
municipal corporation hereinafter referred to as "City," and Central Paving, LLC, a Washington
corporation, hereinafter referred to as "Contractor." This Agreement incorporates all Contract Documents
as set forth in Section 14 of this Agreement.
WHEREAS, the City desires to have certain roadway improvements constructed for its citizens; and
WHEREAS, the City has selected the Contractor to construct the roadway improvements identified
herein;
NOW, THEREFORE, in consideration of the mutual promises and covenants contained herein, to be kept,
performed, and fulfilled by the respective parties hereto, and other valuable consideration, it is mutually
agreed as follows:
1. Scone of Work. The Contractor shall perform the Work outlined in the Contract Documents. In
performing this Work, the Contractor shall at all times comply with all federal, state, and local laws and
regulations applicable to the project. The Contractor shall perform Work diligently and completely.
Time is of the essence in the performance of the Work.
2. Compensation. The City shall pay Contractor according to Section 1-09.9 of the Contract
Documents specifications and according to the rates set forth in the Bid Proposal dated 03/11/2019. City
shall pay Contractor at the unit and lump sum prices, and by force account as specified in the Bid
Proposal according to the Contract Documents as to time, manner, and condition of payment. The
payments to Contractor include the costs for all labor, tools, materials and equipment for the Work.
3. Duration of Agreement. This Agreement shall be in full force and effect for a period
commencing upon execution by the last Party to sign this Agreement. The Work shall be completed
within time specified in the Bid Proposal.
4. Prevailing Wages; Retainage. Prevailing Wages and Retainage are addressed in the Contract
Documents.
5. Independent Contractor.
a. The Contractor and the City agree that the Contractor is an independent contractor with
respect to the work provided pursuant to this Agreement. The Contractor will solely be responsible for its
acts and for the acts of its agents, employees, subcontractors, or representatives during the performance of
this Agreement. Nothing in this Agreement shall be considered to create the relationship of employer and
employee between the parties hereto.
b. The City shall not be responsible for withholding or otherwise deducting federal income tax
or Social Security or contributing to the State Industrial Insurance Program, or otherwise assuming the
duties of an employer with respect to Contractor or any employee of the Contractor.
CD-2
6. Bonding. Upon execution of this contract, as required by RCW 39.08, the Contractor shall
furnish a payment and performance bond in the full amount of the contract price, plus state sales tax,
which shall guarantee the faithful performance of the contract and the payment of all State of Washington
agencies as required by Ch. 60.28 RCW as well as all laborers, mechanics, subcontractors, and material
men and all persons who supply them with provisions and supplies for carrying out the work under this
contract. These performance and payment bonds shall be furnished by a corporate surety company
authorized to do business in the State of Washington, in a company acceptable to the City and on the form
attached hereto. The bond must specify that the surety agrees to be bound by the laws of the State of
Washington and be subject to jurisdiction of the state of Washington, and to venue in Douglas County,
Washington.
7. Insurance. The Contractor shall procure and maintain for the duration of the Agreement,
insurance as required in the Special Provisions against claims for injuries to persons or damage to
property which may arise from or in connection with the performance of the work hereunder by the
Contractor, its agents, representatives, or employees. The requirements of this Section shall survive
termination of this Agreement
8. Successors and Assigns. Neither the City nor the Contractor shall assign, transfer, or encumber
any rights, duties, or interests accruing from this Agreement without the written consent of the other.
9. Discrimination Prohibited. The Contractor shall not discriminate against any employee or
applicant for employment, or any person seeking the services of the Contractor under this Agreement,
because of sex, age, race, color, religion, creed, national origin, marital status, sexual orientation, or the
presence of any sensory, mental, or physical disability, unless based upon a bona fide occupational
qualification.
10. Notices. Any notice required under this Agreement will be in writing, addressed to the
appropriate party at the address which appears below (as modified in writing from time to time by such
party), and given according to Section 1-05.15 of the Special Provisions. All notices shall be effective
upon the date of receipt.
To the City:
City of East Wenatchee
Tom Wachholder, Project Development Manager
271 Ninth Street NE
East Wenatchee, WA 98802
509-884-1829; fax: 509-886-6113
To the Contractor:
Central Paving, LLC
Joel Crreear, Managing Member
PO Box 599, Ellensburg, WA 98926
509-929-1044
11. Applicable Law; Venue; Attorneys' Fees. This Agreement shall be governed by and construed
in accordance with the laws of the State of Washington. In the event any suit, arbitration, or other
proceeding is instituted to enforce any term of this Agreement, the parties specifically understand and
agree that venue shall be exclusively in Douglas County, Washington. The substantially prevailing party
CD-3
in any such action shall be entitled to its attorneys' fees and costs of suit, which shall be fixed by the
judge hearing the case, and such fees shall be included in the judgment
12. General Administration and Management. The manager of this Agreement shall be Tom
Wachholder, Project Development Manager, with the Public Works Department or his/her designee
13. Severability. Any provision or part of the Agreement held to be void or unenforceable under any
law or regulation shall be deemed stricken, and all remaining provisions shall continue to be valid and
binding upon the City and the Contractor, who agree that the Agreement shall be reformed to replace such
stricken provision or part thereof with a valid and enforceable provision that comes as close as reasonably
possible to expressing the intention of the stricken provision.
14. Contract Documents. The Contract Documents (see definition of Contract in Standard
Specifications for Road, Bridge, and Municipal Construction 2018), set forth the terms of the contract
between the City and the Contractor, and are entered into by the acceptance of the Contractor's bid and
the signing of this Public Works Agreement. The Contract Documents also consist of all Appendices
attached hereto and all modifications or changes issued pursuant to the Contract Documents.
There are no Contract Documents other than those above listed. The Contract Documents may only be
amended by Change Order as provided in the Contract Provisions.
CITY OF EAST WENA
By:
-171
Mayor
Date: Z4' 15 -- 2b 19
Attest:
-In
Carl t-- l7[fTIO- t-, City Clerk
IT as to fo
r
City Attorney
Authorizing Resolution No.
Central Paving, LLC
s By: ��' 6,e..e�
Title: A�±vhsl`1c bar/
Date:'%