Loading...
HomeMy WebLinkAbout2019-09-17 - Washington State Department of Transportation - General Agreements / General Service Agreements - 2019-08Aft Washington State WAf Department of Transportation Local Agency Federal Aid Project Prospectus Prefix Route ( ) Date 8/22/19 Federal Aid Project Number SRTS 5906 DUNS Number 018981480 LocalAgency 2019-08 r WSDO Y 1 Federal Employer 91-6009051 Project Number ` Use On J Tax ID Number Agency CAAgency Federal Program Title City of East Wenatchee ❑ Yes 0✓ No Z✓ 20.205 [:]Other Project Title Start Latitude N See Attached Start Longitude W See Attached Kenroy Elementary Safe Routes to School End Latitude N See Attached End Longitude W See Attached Project Termini From -To Nearest City Name Project Zip Code (+4) Various Various East Wenatchee 98802-6079 Begin Mile Post End Mile Post Length of Project Award Type N/A N/A 0.45 miles ✓❑ Local ❑ Local Forces ❑ State ❑ Railroad Route ID Begin Mile Point End Mile Point City Number County Number County Name N/A N/A N/A 0350 09 Douglas WSDOT Region Legislative District(s) Congressional District(s) Urban Area Number North Central Region 12 8 13 Total Local Agency Federal Funds Phase Start Phase Estimated Cost Funding Date Nearest Hundred Dollar Nearest Hundred Dollar Nearest Hundred Dollar Month Year P.E. $263,600 $39,500 $224,100 10/2019 R/W $105,000 $15,700 $89,300 08/2020 Const. $1,982,800 $297,500 $1,685,300 1/2021 Total $2,351,400 $352,700 $1,998,700 Description of Existing Facility (Existing Design and Present Condition) Roadway Width Number of Lanes 30' - 38' 2 The existing 5th Street NE corridor from Jonathan Avenue to Kentucky Avenue consists of 2 travel lanes, variable width gravel and paved shoulder sections, limited storm drainage facilities, and limited illumination. Description of Proposed Work Description of Proposed Work (Attach additional sheet(s) if necessary) Construct sidewalk, buffer strip, raised intersection, narrow lane widths, illumination, flashing LED stop signs, crosswalk markings and pedestrian signage along 5th Street NE to Kentucky Ave. In addition, improvements will be extended up Jonathan Ave proximately 580' and up Kansas Ave approximately 340'. Local Agency Contact Person Title Phone Tom Wachholder Project Development Manager 509-884-1829 Mailing Address City State Zip Code 271 9th Street NE East Wenatchee WA 98802 By c� d 41 Approving Authority Project Prospectus Title Mayor fN 4e ft— Date DOT Form iau-iui Page 1 Revised 04/2015 Previous Editions Obsolete Agency Project Title Date City of East Wenatchee Kenroy Elementary Safe Routes to School 8/22/19 Type of Proposed Work Project Type (Check all that Apply) Roadway Width Number of Lanes ❑ New Construction ❑ Path / Trail ❑ 3-R 24' - 28' 2 ❑ Reconstruction FV11 Pedestrian / Facilities ❑ 2-R ❑ Railroad ❑ Parking ❑ Other ❑ Bridge Geometric Design Data Description Through Route Crossroad ❑ Principal Arterial ❑ Principal Arterial Federal Urban ❑ Minor Arterial �✓ Urban ❑✓ Minor Arterial Functional ❑ Rural ❑ Collector ❑Rural El collector Classification ❑ NHS Ma ✓❑ or Collector 1 ❑ NHS ❑ Major Collector ❑ Minor Collector ❑ Minor Collector ✓❑ Local Access ✓❑ Local Access Terrain ❑ Flat ❑✓ Roll ❑ Mountain ❑ Flat ❑✓ Roll ❑ Mountain Posted Speed 30 MPH 30 MPH Design Speed 30 MPH 30 MPH Existing ADT 2400 5500 Design Year ADT 3400 7760 Design Year 2040 2040 Design Hourly Volume (DHV) 324 776 Performance of Work Preliminary Engineering Will Be Performed By Others Agency Consultant/Agency 95 % 5 Construction Will Be Performed By Contract Agency Contractor 100 Environmental Classification ❑ Class I - Environmental Impact Statement (EIS) ❑✓ Class II - Categorically Excluded (CE) ❑ Project Involves NEPA/SEPA Section 404 ❑ Projects Requiring Documentation Interagency Agreement (Documented CE) ❑ Class II I - Environmental Assessment (EA) ❑ Project Involves NEPA/SEPA Section 404 Interagency Agreements Environmental Considerations uui rani i,+u-iui Paget Revised 04/2015 Previous Editions Obsolete Agency Project Title Date City of East Wenatchee Kenroy Elementary Safe Routes to School 8/22/19 Right of Way ❑ No Right of Way Needed ❑✓ Right of Way Needed *All construction required by the ❑✓ No Relocation El Relocation Required contract can be accomplished within the exiting right of way. Utilities Railroad ❑ No utility work required Fv No railroad work required ❑ All utility work will be completed prior to the start ❑ All railroad work will be completed prior to the start of of the construction contract the construction contract W1 All utility work will be completed in coordination [:]All the railroad work will be completed in coordination with the construction contract with the construction contract Description of Utility Relocation or Adjustments and Existing Major Structures Involved in the Project Drainage modifications will be necessary. Utility structures will be adjusted to final pavement grade. FAA Involvement Is any airport located within 3.2 kilometers (2 miles) of the proposed project? ❑ Yes ❑✓ No Remarks This project has been reviewed by the legislative body of the administration agency or agencies, or it's designee, and is not inconsistent with the agency's comprehensive plan for community development. Agency Date �/4 �l q By J Mayor/Ch DOT Form 140-101 Page 3 Revised 04/2015 Previous Editions Obsolete