Loading...
HomeMy WebLinkAbout2019-09-19 - Washington State Department of Transportation - General Agreements / General Service Agreements - 2019-09Adw Washington State TA Department of Transportation Local Agency Federal Aid Project Prospectus Prefix Route ( ) Date 8/22/19 Federal Aid Project Number SRTS 9909 DUNS Number 018981480 Lo 1al Agency 2019-09 r WSDO y 1 Federal Employer 91-6009051 Project Number ` Use Onl J Tax ID Number Agency CAAgency Federal Program Title City of East Wenatchee ❑ Yes 0✓ No ❑✓ 20.205 ❑ Other Project Title Start Latitude N See Attached Start Longitude W See Attached Sterling Intermediate Safe Routes to School End Latitude N See Attached End Longitude W See Attached Project Termini From -To Nearest City Name Project Zip Code (+4) I/S N Grover PI/5th St I/S James Ave/8th St East Wenatchee 98802-4654 Begin Mile Post End Mile Post Length of Project Award Type N/A N/A 0.59 miles ✓❑ Local ❑ Local Forces ❑ State ❑ Railroad Route ID Begin Mile Point End Mile Point City Number County Number County Name N/A N/A N/A 0350 09 Douglas WSDOT Region Legislative District(s) Congressional District(s) Urban Area Number North Central Region 12 8 13 Total Local Agency Phase Start Phase Estimated Cost Funding Federal Funds Date Nearest Hundred Dollar Nearest Hundred Dollar Nearest Hundred Dollar Month Year P.E. $257,100 $38,600 $218,500 10/2019 R/W $90,000 $13,500 $76,500 08/2020 Const. $1,932,700 $289,900 $1,642,800 1/2021 Total $2,279,800 $342,000 $1,937,800 Description of Existing Facility (Existing Design and Present Condition) Roadway Width Number of Lanes 30' - 38' 2 The existing 5th Street NE corridor from N Grover Place to James Avenue consists of 2 travel lanes, variable width gravel and paved shoulder sections, limited storm drainage facilities, and limited illumination. Description of Proposed Work Description of Proposed Work (Attach additional sheet(s) if necessary) Install sidewalks, bike lanes, buffer strips, mini roundabout, raised intersections, rectangular rapid flashing beacons, narrow travel lane widths, crosswalk markings, illumination and pedestrian signage along 5th St NE from N Grover Place to James Ave, then James Ave from 5th St NE to 8th St NE. Local Agency Contact Person Title Phone Tom Wachholder Project Development Manager 509-884-1829 Mailing Address City State Zip Code 271 9th Street NE East Wenatchee WA 98802 By Approving Authority Project Prospectus Title Mayor & Date 0/17 uvi corm 14U-IUI Page 1 Revised 04/2015 Previous Editions Obsolete Agency Project Title Date City of East Wenatchee Sterling Intermediate Safe Routes to School 8/22/19 Type of Proposed Work Project Type (Check all that Apply) Roadway Width Number of Lanes ❑ New Construction ❑ Path / Trail ❑ 3-R 26' - 32' 2 ❑ Reconstruction ❑✓ Pedestrian / Facilities ❑ 2-R ❑ Railroad ❑ Parking ❑✓ Other ❑ Bridge Geometric Design Data Description Through Route Crossroad ❑ Principal Arterial ❑ Principal Arterial Federal ✓❑ Urban ❑ Minor Arterial ✓❑ Urban ✓❑ Minor Arterial Functional [:]Rural ❑ Collector ❑ Rural ❑ Collector Classification ❑ NHS Major Collector ❑ NHS ❑✓ Major Collector ❑ Minor Collector ❑ Minor Collector ❑ Local Access ✓❑ Local Access Terrain ❑ Flat ✓❑ Roll ❑ Mountain ❑✓ Flat ❑ Roll ❑ Mountain Posted Speed 30 MPH 30 MPH Design Speed 30 MPH 30 MPH Existing ADT 2400 250 Design Year ADT 3400 375 Design Year 2040 2040 Design Hourly Volume (DHV) 324 37 Performance of Work Preliminary Engineering Will Be Performed By Others Agency Consultant/Agency 95 % 5 Construction Will Be Performed By Contract Agency Contractor 100 % % Environmental Classification ❑ Class I - Environmental Impact Statement (EIS) ✓❑ Class II - Categorically Excluded (CE) ❑ Project Involves NEPA/SEPA Section 404 ❑ Projects Requiring Documentation Interagency Agreement (Documented CE) ❑ Class III - Environmental Assessment (EA) ❑ Project Involves NEPA/SEPA Section 404 Interagency Agreements Environmental Considerations uu i rorm 14u-1 u1 Page 2 Revised 04/2015 Previous Editions Obsolete Agency Project Title Date City of East Wenatchee Sterling Intermediate Safe Routes to School 8/22/19 Right of Way ❑ No Right of Way Needed ❑✓ Right of Way Needed All construction required by the No Relocation El Relocation Required contract can be accomplished within the exiting right of way. Utilities Railroad ❑ No utility work required ❑✓ No railroad work required ❑ All utility work will be completed prior to the start ❑ All railroad work will be completed prior to the start of of the construction contract the construction contract [v All utility work will be completed in coordination ❑ All the railroad work will be completed in coordination with the construction contract with the construction contract Description of Utility Relocation or Adjustments and Existing Major Structures Involved in the Project Drainage modifications will be necessary. Utility structures will be adjusted to final pavement grade. FAA Involvement Is any airport located within 3.2 kilometers (2 miles) of the proposed project? ❑ Yes Z✓ No Remarks This project has been reviewed by the legislative body of the administration agency or agencies, or it's designee, and is not inconsistent with the agency's comprehensive plan for community development. Agency Date 9�19/Il By Mayo y P� May hairperson DOT Form 140-101 Page 3 Revised 04/2015 Previous Editions Obsolete