Loading...
HomeMy WebLinkAbout2019-03-11 - KPG - General Agreements / General Service Agreements - 2018-08Agreement Supplement No. 1 The City of East Wenatchee (CITY) desires to supplement the agreement entered into with KPG, P.S. dated September 14, 2018, to provide Professional Engineering Services for the Design of the 2019 Residential Overlay Project. As allowed by Section 15, the parties desire to modify said agreement as follows: 5. Compensation — a. Increase Not to Exceed Amount by $32,992.50 based on the attached Services During Construction Scope of Work (Exhibit A) specific to Supplement No. 1. All other provisions in said agreement remain in full force and effect except as expressly modified by this supplement. CITY OF Signatu Jievefi U. Ldcy, Date: ATTEST: By: Gi -6 Cl e4-k- Agreement Supplement No. 1 Page 1 of 1 KPG, P.S. Fedora, P.E., Project Manager C) G3 Exhibit A Contract Supplement No. 1— Part -Time Construction Services Scope of Work City of East Wenatchee 2019 Transportation Benefit District Residential Overlay Project March 8, 2019 INTRODUCTION AND BACKGROUND The City of East Wenatchee has requested a contract supplement to provide construction services for the 2019 Residential Overlay Project to be performed by KPG, P.S. (KPG). This supplemental scope of work will include tasks related to part time on -site construction monitoring, submittal review, materials testing, and project documentation during the 2019 construction season. Per plan project locations for this project include the following: • North Ashland Avenue & 12 Street NE (North Baker Avenue to 13th Street NE) • Fairview Place (loth Street NE to End) • Gilbert Court (N Grover Place to End) Below is a detailed scope of work for Contract Supplement No. 1: TASK 1— PROJECT MANAGEMENT Objective: Provide management of staff and resources, monitor and manage the project budget and project schedule, attend meetings, maintain consistent client communication, provide regular invoicing, and develop regular progress reports. Consultant Responsibilities: 1. Contract billing, accounting, and auditing. 2. Internal resource management. 3. Meetings, coordination, and communication with the City. Assumptions and City Responsibilities: 1. Invoices and progress reports will be submitted monthly in KPG format, including names of personnel, number of hours, and direct costs. 2. This project does not include outside funding. This scope of work does not include funding agency coordination or documentation. 3. Assume a maximum of 3 months of billable activity during the spring/summer 2019. 4. The City will review and process monthly invoices in a timely fashion. Invoices usually are processed within 30 days but may take up to 45 days based on approval schedules. 5. The City will facilitate coordination with other agencies if needed. Specific known coordination needs include: water service improvements. 23 Wenatchee Ave, Suite 223, Wenatchee, WA 98801 P: 509.663.2711 www.ki?q.com Deliverables: 1. Monthly progress reports (electronic). 2. Monthly invoices (electronic). 3. Meeting agendas and notes as needed (electronic). TASK 2 — PART TIME CONSTRUCTION SERVICES Objective: Provide part time construction services including construction monitoring and inspection, materials testing, and project documentation. The goal of construction monitoring and inspection work under this task will be to assist and support and supplement part-time monitoring and inspection provided by City staff. Consultant Responsibilities: 1. Part-time Construction Monitoring and Inspection: Provide part time construction monitoring and inspection to supplement inspection provided by City staff. Total hours under this task will be limited to 60. Specific tasks to be completed under this task include the following: a. Prepare inspector daily reports (IDRs) b. Take project photographs c. Collect material tickets as needed when on site, d. Measure and track quantities when on site during the days of inspection. e. Attend field meetings as needed. f. Attend pre -construction conference. g. Coordinate material testing by outside agency. h. Coordinate with City staff for scheduling of monitoring and inspection activities. i. Development of project punch list. 2. Material Submittal Review: Provide material submittal reviews and responses, manage the submittal process, maintain a record of material approvals, and coordinate material review with City and affected utility agencies. 3. RFI's, Minor Changes, and Change Orders: Manage and document project related questions and changes including the following specific tasks: a. Respond to requests for information (RFls) and answer design related questions as they arise. b. The consultant shall review changed conditions as they arise, make recommendations, prepare field directed changes, and prepare change orders if needed. 4. Pay Estimate Preparation and Review: This task shall include compiling Contractor pay estimates based upon a combination of the following: a. Contractor's monthly Invoice checked against design quantities. ,; r, 12 23 Wenatchee Ave, Suite 223, Wenatchee, WA 98801 P: 509.663.2711 www.kpg.com b. Quantities tracked during on -site inspection by consultant. c. Quantities provided to KPG by City staff during on -site inspection provided by the City. 5. Project Closeout: Compile and review project documentation, provide recommendations to the City, and support the City to finalize and closeout the Construction Contract. 6. Review project documentation and develop record drawings at project closeout. Assumptions and City Responsibilities: 1. The level of effort for part time construction services is based upon the working day count of 30 working days and an average of two hours per working day on site. Total hours for work under Task 2.1 shall not exceed 60. Included in that total are all work listed under Task 2.1, including but not limited to work that may be performed off site such as meeting attendance, inspection coordination, communication and emails, pre - construction conference attendance, production of daily reports, and project photo organization. It is anticipated that as much as half (30) of the hours for this task may be performed off site. 2. The City will provide daily on -site construction inspection for all project needs that exceed the hours allocated to Task 2.1. The City will provide inspection staff as needed to reach the City's desired construction monitoring goals. 3. The City will clearly communicate field decisions that are made while KPG staff is not on site, and provide KPG staff with all information needed prior to KPG's next inspection shift. 4. KPG will take the lead on scheduling and coordination of joint inspection and construction monitoring efforts. The City and KPG will coordinate staffing needs for each week prior to noon on the preceding Friday whenever possible. 5. An allowance of $3,008.50 has been reserved under "Reimbursable Direct Non -Salary Costs" for material testing by Construction Special Inspection (CSI) based on an initial budget provided by CSI. Billing shall be based upon actual work performed. If additional work is required that exceed this allowance, the City shall be responsible for all costs. 6. The City may authorize management reserve funds to provide additional services or increase budgeted hours for Task 2.1 if desired. 7. The City will submit daily inspection reports, project photographs, material tickets, material measurements and any other relevant project data to KPG to be compiled into the project documentation records on a daily basis. ag, 13 23 Wenatchee Ave, Suite 223, Wenatchee, WA 98801 P: 509.663.2711 www.kpg.com OPP 8. The City will review and execute the Construction contract including insurance, bonds, etc. 9. This scope of work does not include processing and tracking certified payroll, ensuring or payroll compliance. If needed, this will work will be performed by the City. Deliverables: 1. Field Directed Changes, as needed 2. Change Orders, as needed 3. Contractor Pay Estimates 4. Punch List to Contractor 5. Material Submittal Responses 6. Request for Information Responses as needed 7. Record of Material Acceptance 8. As -build drawings (11x17 submitted electronically as .pdf) 9. Inspector's Daily Reports and Material Inspection Reports by outside testing company. 10. Electronic photos of construction activities. MANAGEMENT RESERVE The City of East Wenatchee may require additional services of the Consultant. The scope of these services will be determined based on the unanticipated project needs or other considerations at the sole discretion of the City. This work may include additional monitoring and inspection or other construction management tasks that are needed. These services will be authorized by the City of East Wenatchee under management reserve. At the time these services are required, the Consultant shall provide a detailed scope of work and an estimate of costs. The Consultant shall not proceed with the work until the City has authorized the work and issued a notice to proceed. Pagc 14 23 Wenatchee Ave, Suite 223, Wenatchee, WA 98801 P: 509.663.2711 www.kp_c.com k ®®2 8 a qq2 ° 8 2 'a `\k � )(s■ ®_®o \) _ cad _§/w / 0 b CNF m`co -®- ®_(4 - ®-- - - ® CL �� o -- § ¥ Z \ ,,� Le){ƒ § § R \ m o � «� ■ 4 ` 7 e - ° - LU k \ \ a ® . E § o « z $ S § - #CN - o 047 « k ® o e <E o = em m oLu --a a « 2) 0_! - LU k �k w o ) a { i \! § _ \\ ® 9 G }ƒ k-f� \ g � »!§ ) } ■m�� 2 § _ cm Ir �kkk; k�d.\\ \���)\ 2 §�AQq al;' r« �o/&«n° _ ! - SEoa e a )%�25 0�� a, 5` 2F7- ° • «2\kk) $L) �}\trTL ( ) _« J ; . z ƒ§+¥ E x0 o k / . 4) w=u& a / 2 w