Loading...
HomeMy WebLinkAbout2019-06-04 - Ridgeline Custom Builders LLC - General Agreements / General Service Agreements - 2019-06CD-1 CITY OF EAST WENATCHEE PUBLIC WORKS AGREEMENT FOR 2019 Ballard Park Gazebo Rebuild Contract No. 2019-06 Contractor: RIDGELINE CUSTOM BUILDERS LLC This Agreement is entered into by and between the CITY OF EAST WENATCHEE, WASHINGTON, a municipal corporation hereinafter referred to as "City," and RIDGELIKE CUSTOM BUILDERS LLC, a Washington corporation, hereinafter referred to as "Contractor." This Agreement incorporates all Contract Documents as set forth in Section 14 of this Agreement. WHEREAS, the City desires to reconstruct a gazebo structure; and WHEREAS, the City has selected the Contractor to reconstruct the gazebo structure identified herein; NOW, THEREFORE, in consideration of the mutual promises and covenants contained herein, to be kept, performed, and fulfilled by the respective parties hereto, and other valuable consideration, it is mutually agreed as follows: 1. Scope of Work. The Contractor shall perform the Work outlined in Contract Documents. In performing this Work, the Contractor shall at all times comply with all federal, state, and local laws and regulations applicable to the project. The Contractor shall perform Work diligently and completely. Time is of the essence in the performance of the Work. 2. Compensation. The City shall pay Contractor a single payment (less retainage) at the completion of the project according to the Cost Estimate in the Contract Documents dated and approved by the East Wenatchee City Council. City shall pay Contractor at the unit and lump sum prices, and by force account as specified in the Contract Documents as to time, manner, and condition of payment. The payments to Contractor include the costs for all labor, tools, materials and equipment for the Work. 3. Duration of Agreement. This Agreement shall be in full force and effect for a period commencing upon execution by the last Party to sign this Agreement. The Work shall be completed within time specified in the Contract Documents. 4. Prevailing Wages; Retainage. Prevailing Wages and Retainage are addressed in the Contract Documents. 5. Independent Contractor. a. The Contractor and the City agree that the Contractor is an independent contractor with respect to the work provided pursuant to this Agreement. The Contractor will solely be responsible for its acts and for the acts of its agents, employees, subcontractors, or representatives during the performance of this Agreement. Nothing in this Agreement shall be considered to create the relationship of employer and employee between the parties hereto. b. The City shall not be responsible for withholding or otherwise deducting federal income tax or Social Security or contributing to the State Industrial Insurance Program, or otherwise assuming the duties of an employer with respect to Contractor or any employee of the Contractor. 6. Bonding. Upon execution of this contract, as required by RCW 39.08, the Contractor shall furnish a payment and performance bonds in the full amount of the contract price, plus state sales tax, CD-2 which shall guarantee the faithful performance of the contract and the payment of all State of Washington agencies as required by Ch. 60.28 RCW as well as all laborers, mechanics, subcontractors, and material men and all persons who supply them with provisions and supplies for carrying out the work under this contract. These performance and payment bonds shall be furnished by a corporate surety company authorized to do business in the State of Washington, in a company acceptable to the City and on the form attached hereto. The bond must specify that the surety agrees to be bound by the laws of the State of Washington and be subject to jurisdiction of the state of Washington, and to venue in Douglas County, Washington. 7. Insurance. The Contractor shall procure and maintain for the duration of the Agreement, insurance as required in the Contract Documents against claims for injuries to persons or damage to property which may arise from or in connection with the performance of the work hereunder by the Contractor, its agents, representatives, or employees. The requirements of this Section shall survive termination of this Agreement 8. Successors and Assigns. Neither the City nor the Contractor shall assign, transfer, or encumber any rights, duties, or interests accruing from this Agreement without the written consent of the other. 9. Discrimination Prohibited. The Contractor shall not discriminate against any employee or applicant for employment, or any person seeking the services of the Contractor under this Agreement, because of sex, age, race, color, religion, creed, national origin, marital status, sexual orientation, or the presence of any sensory, mental, or physical disability, unless based upon a bona fide occupational qualification. 10. Notices. Any notice required under this Agreement will be in writing, addressed to the appropriate party at the address which appears below (as modified in writing from time to time by such party). All notices shall be effective upon the date of receipt. To the City: City of East Wenatchee Tom Wachholder, Project Development Manager 271 Ninth Street NE East Wenatchee, WA 98802 509-884-1829; fax: 509-886-6113 To the Contractor: Ridgeline Custom Builders LLC Matt Dolan PO Box 3572 Wenatchee, WA 98807 Phone: 509.8 60.1042 11. Applicable Law; Venue; Attorneys' Fees. This Agreement shall be governed by and construed in accordance with the laws of the State of Washington. In the event any suit, arbitration, or other proceeding is instituted to enforce any term of this Agreement, the parties specifically understand and agree that venue shall be exclusively in Douglas County, Washington. The substantially prevailing party in any such action shall be entitled to its attorneys' fees and costs of suit, which shall be fixed by the judge hearing the case, and such fees shall be included in the judgment CD-3 12. General Administration and Management. The manager of this Agreement shall be Tom Wachholder, Project Development Manager, with the Public Works Department or his/her designee 13. Severability. Any provision or part of the Agreement held to be void or unenforceable under any law or regulation shall be deemed stricken, and all remaining provisions shall continue to be valid and binding upon the City and the Contractor, who agree that the Agreement shall be reformed to replace such stricken provision or part thereof with a valid and enforceable provision that comes as close as reasonably possible to expressing the intention of the stricken provision. 14. Contract Documents. The Contract Documents, set forth the terms of the contract between the City and the Contractor, and are entered into by the acceptance of the Contractor's bid and the signing of this Public Works Agreement. The Contract Documents also consist of all Appendices attached hereto and all modifications or changes issued pursuant to the Contract Documents. There are no Contract Documents other than those above listed. The Contract Documents may only be amended by Change Order as provided in the Contract Documets. CITY OF EASE' WENATCHEE By: _ Mayor Date: Attest: _ M.&mew-1 City Clerk At edas to r City Attornev Authorizing Resolution No. RIDGELINE UST,71, DERS LLC By: M. ' U -- Title: - cowl yt! V Date: 5 ZV ! Contract Documents For 2019 Ballard Park Gazebo Rebuild QUALIFIED BIDDERS The successful bidder for this work shall be required to have a state contractor's license and a City of East Wenatchee ("City") business license. The City specifically invites small businesses and minority -owned businesses to submit proposals. No bidder shall discriminate on the basis of race, color, religion, age, sex, marital status, national origin, or the presence of any sensory, mental, or physical handicap. PROJECT LOCATION Ballard Park located at the 1110 block of Valley Mall Parkway SCOPE OF WORK 1. Mobilize 2. Pressure wash, clean, and reseal existing concrete with Euclid Everclear sealer or owner -recommended alternative 3. Labor and materials for a gazebo, approximately 10' x 14'. 4. Appearance and finishes to match previous structure (APPENDIX C) and specifications provided by City of East Wenatchee. Includes pressure treated wood floor framing, 2x6 cedar decking, fir 6x6 posts, ornately cut fascia, cedar shake roofing, benches, railing, pine soffit, white paint. 5. Project management / site supervision 6. Cleanup / debris disposal 7. L&I Prevailing wage intent and affidavit filing fees Specifications Pagel of 3 UADocumentsNy He\Desktop\Gazebo RebuH&Gazebo Rebuild Specifications.doc DEFINITIONS Contracting Agency is the City of East Wenatchee Contractor — The individual, partnership, firm, corporation, or joint venture, Contracting with the Contracting Agency to do prescribed work. City — City of East Wenatchee Notice to Proceed is a notice issued by the City to the Contractor stated the date the Contractor can begin work subject to the terms and conditions of the contract. Working Days will begin on the Notice to Proceed date. Physical Completion Date is the day all of the work is physically completed on the project. Substantial Completion Date is the day the Project Manager determines the City has full unrestricted use and benefit of the facility, both from the operational and safety standpoint, all refinished surfaces are complete per specification and completely dry, and only minor incidental work remains for the Physical Completion of the total contract. START DATE AND CONTRACT TIME 1. The work shall be completed within 30 working days following a Notice to Proceed; 2. Charging of Working Days will cease once Substantial Completion is issued. PUBLIC WORKS PROJECT This is a public work project. All work is "public work" as defined by state law (RCW 39.04.010), and is therefore subject to the requirements of prevailing wage (RCW 30.10) and retainage (RCW 60.28). LIABILITY INSURANCE The City will require the successful bidder to provide the City with a Certificate of Insurance naming the City has an additional insured. The Commercial General Liability Insurance limit shall not be less than $1 million combined single limit occurrence and an aggregate of $1 million. AWARD OF CONTRACT If the City awards a contract, it will award a contract to the lowest, responsible bidder whose proposal complies with all the requirements prescribed. If the City awards a contract, the City will award a contract within sixty days after the proposals are opened. Specifications Page 2 of 3 UADocuments\My File\Desktop\Gazebo Rebuild\Gazebo Rebuild SpeciScations.doc EXECUTION OF CONTRACT The successful bidder shall sign and return the contract, together with the contract bonds, within ten days, not including Sundays, after the City notifies the bidder the contract has been awarded. No proposal shall be considered binding upon the City until the execution of the contract. Failure to execute a contract and file acceptable bonds as provided herein within ten days, not including Sundays, after the bidder has received notice that the contract has been awarded to him, shall be just cause for the annulment of the award and the forfeiture of the proposal security. LIQUIDATED DAMAGES If the Contractor shall neglect, refuse, or fail to complete work within the contract time as indicated in the Specifications (as duly adjusted pursuant to the Contract) for completion, the Contractor shall pay the City $500 for each day that expires after such time until the work is completed and ready for final payment. GUARANTEE The Contractor shall guarantee all parts of the work against defective materials or workmanship furnished by the Contractor for a period of one year from the date of project acceptance. COMMENCEMENT AND COMPLETION Not less than ten days after the execution of the contract, the City will notify the Contractor in writing and within ten days after the date of Notice to Proceed contractor shall commence work. The Contractor shall diligently prosecute the work to completion before the expiration of thirty calendar days from the date of the Notice to Proceed and such work shall be so completed to the satisfaction of the City of East Wenatchee. Work shall not be considered complete until proof of final inspection by the City of East Wenatchee is provided to the City Council of the City of East Wenatchee. APPENDIX A — Cost Estimate APPENDIX B — Prevailing Wage Rates for Douglas County APPENDIX C — Previous Gazebo Structure Photo Specifications Page 3 of 3 UADocuments\My He\Desktop\Gazebo Rebuild\Gazebo Rebuild SpeciScations.doc APPENDIX A PO Box 3572PIDGEIINEMattDolanWenatchee, WA 98807 Ph (509) 860-1042 # RIDGECB957RE IF www.ridgelinecustom.com CUSTOM BUILDERS - Cost Estimate - Ballard Park Gazebo May 16, 2019 Scope: 1. Mobilize 2. Pressure wash, clean, and reseal existing concrete with Euclid Everclear sealer or owner - recommended alternative 3. Labor and materials for a gazebo, approximately 10' x 14'. Appearance, and finishes to match previous structure and specifications provided by City of East Wenatchee. Includes wood floor framing, 2x6 cedar decking, fir 6x6 posts, ornately cut fascia, cedar shake roofing, benches, railing, pine soffit, white paint. 4. Project management / site supervision 5. Cleanup / debris disposal 6. L&I Prevailing wage intent and affidavit filing fees Price: Base bid - $33,180.00 Sales Tax (8.2%) - $ 2,720.76 Total $359900.76 I really appreciate the way that you considered me for this project, and I look forward to working with you soon. Please do not hesitate to contact me with any questions. My cell number is (509) 860-1042. Thanks again. Sincerely, 6) Matt Dolan Owner, Ridgeline Custom Builders 5/23/2019 APPENDIX B State of Washington Department of Labor & Industries Prevailing Wage Section - Telephone 360-902-5335 PO Box 44540, Olympia, WA 98504-4540 Washington State Prevailing Wage The PREVAILING WAGES listed here include both the hourly wage rate and the hourly rate of fringe benefits. On public works projects, worker's wage and benefit rates must add to not less than this total. A brief description of overtime calculation requirements are provided on the Benefit Code Key. Journey Level Prevailing Wage Rates for the Effective Date: 5/23/2019 County_ Trade Job Classification Wage Holiday Overtime Note Douglas Asbestos Abatement Workers Journey Level 37.63 5D 1 H Douglas Boilermakers Journey Level 66.54 5N 1C Douglas Brick Mason Journey Level 49.04 5A 1M Douglas Building Service Employees Janitor 12.00 1 Douglas Building Service Employees Shampooer 12.00 1 Douglas Building Service Employees Waxer 12.00 1 Douglas Building Service Employees Window Cleaner 12.00 1 Douglas Cabinet Makers (In Shop), Journey Level 12.00 1 Douglas Carpenters Acoustical Worker 42.98 5D 4C Douglas Carpenters Bridge, Dock And Wharf 57.85 5D 4C Carpenters Douglas Carpenters Bridge, Dock And Wharf 57.85 5D 4C Carpenters Douglas Carpenters Carpenter 42.98 5D 4C Douglas Carpenters Carpenters on Stationary Tools 43.11 5D 4C Douglas Carpenters Creosoted Material 43.08 5D 4C Douglas Carpenters Floor Finisher 42.98 5D 4C Douglas Carpenters Floor Layer 42.98 5D 4C Douglas Carpenters Scaffold Erecting Et Dismantling 49.80 5A 1 B Douglas Carpenters Scaffold Erector 42.98 5D 4C Douglas Cement Masons Journey Level 43.20 7B 1 N Douglas Divers Et Tenders Bell/Vehicle or Submersible 113.60 5D 4C Operator (Not Under Pressure) Douglas Divers Et Tenders Dive Supervisor/Master 76.33 5D 4C Douglas Divers Et Tenders Diver 113.60 5D 4C 8V Douglas Divers Et Tenders Diver On Standby 71.33 5D 4C Douglas Divers Et Tenders Diver Tender 64.71 5D 4C Douglas Divers Et Tenders Manifold Operator 64.71 5D 4C Douglas Divers Et Tenders Manifold Operator Mixed Gas 69.71 5D 4C Douglas Divers Et Tenders Remote Operated Vehicle 64.71 5D 4C Operator/Technician Douglas Divers Et Tenders Remote Operated Vehicle Tender 60.29 5A 4C abouttlank 1/15 5/23/2019 abouttlank Douglas Dredge Workers Assistant Engineer 56.44 5D 3F Douglas Dredge Workers Assistant Mate (Deckhand) 56.00 5D 3F Douglas Dredge Workers Boatmen 56.44 5D 3F Douglas Dredge Workers Engineer Welder 57.51 5D 3F Douglas Dredge Workers Leverman, Hydraulic 58.67 5D 3F Douglas Dredge Workers Mates 56.44 5D 3F Douglas Dredge Workers Oiler 56.00 5D 3F Douglas Drywall Applicator Journey Level 45.11 5A 1 B Douglas Drywall Tapers Journey Level 40.10 7E 1 P Douglas Electrical Fixture Maintenance Journey Level 12.00 1 Workers Douglas Electricians - Inside Cable Splicer 68.69 7H 1 E Douglas Electricians - Inside Construction Stock Person 34.97 7H 1 D Douglas Electricians - Inside Journey Level 64.31 7H 1 E Douglas Electricians - Motor Shop Craftsman 15.37 1 Douglas Electricians - Motor Shop Journey Level 14.69 1 Douglas Electricians - Powerline Cable Splicer 79.60 5A 4D Construction Douglas Electricians - Powerline Certified Line Welder 72.98 5A 4D Construction Douglas Electricians - Powerline Groundperson 47.94 5A 4D Construction Douglas Electricians - Powerline Heavy Line Equipment Operator 72.98 5A 4D Construction Douglas Electricians - Powerline Journey Level Lineperson 72.98 5A 4D Construction Douglas Electricians - Powerline Line Equipment Operator 62.06 5A 4D Construction Douglas Electricians - Powerline Meter Installer 47.94 5A 4D Construction Douglas Electricians - Powerline Pole Sprayer 72.98 5A 4D Construction Douglas Electricians - Powerline Powderperson 54.55 5A 4D Construction Douglas Electronic Technicians Electronic Technicians Journey 43.70 5B 1 B Level Douglas Elevator Constructors Mechanic 94.22 7D 4A Douglas Elevator Constructors Mechanic In Charge 101.73 7D 4A Douglas Fabricated Precast Concrete Journey Level 12.00 1 Products Douglas Fabricated Precast Concrete Journey Level - In -Factory Work 12.00 1 Products Only Douglas Fence Erectors Fence Erector 37.11 7A 31 Douglas Fence Erectors Fence Laborer 37.11 7A 31 Douglas Flaggers Journey Level 37.11 7A 31 Douglas Glaziers Journey Level 30.59 7L 4L Douglas Heat & Frost Insulators And Journeyman 73.58 5J 4H Asbestos Workers Douglas Heating Equipment Mechanics Journey Level 54.61 6Z 1 B Douglas Hod Carriers Ft Mason Tenders Journey Level 40.67 7A 31 abouttlank 8N 8W 2/15 5/23/2019 abouttlank Douglas Industrial Power Vacuum Cleaner Journey Level 12.00 1 Douglas Inland Boatmen Journey Level 12.00 1 Douglas Inspection/Cleaning/Seating Of Cleaner Operator, Foamer 12.00 1 Sewer Et Water Systems By Operator Remote Control Douglas Inspection/Cleaning/Sealing Of Grout Truck Operator 12.00 1 Sewer Et Water Systems By Remote Control Douglas Inspection/Cleaning/Sealing Of Head Operator 12.78 1 Sewer Et Water Systems By Remote Control Douglas Inspection/Cleaning/Sealing Of Technician 12.00 1 Sewer Et Water Systems By Remote Control Douglas Inspection/Cleaning/Sealing Of Tv Truck Operator 12.00 1 Sewer Et Water Systems By Remote Control Douglas Insulation Applicators Journey Level 45.11 5A 1 B Douglas Ironworkers Journeyman 61.21 7N 10 Douglas Laborers Air, Gas Or Electric Vibrating 39.51 7A 31 Screed Douglas Laborers Airtrac Drill Operator 40.67 7A 31 Douglas Laborers Ballast Regular Machine 39.51 7A 31 Douglas Laborers Batch Weighman 37.11 7A 31 Douglas Laborers Brick Pavers 39.51 7A 31 Douglas Laborers Brush Cutter 39.51 7A 31 Douglas Laborers Brush Hog Feeder 39.51 7A 31 Douglas Laborers Burner 39.51 7A 31 Douglas Laborers Caisson Worker 40.67 7A 31 Douglas Laborers Carpenter Tender 39.51 7A 31 Douglas Laborers Cement Dumper -paving 40.18 7A 31 Douglas Laborers Cement Finisher Tender 39.51 7A 31 Douglas Laborers Change House Or Dry Shack 39.51 7A 31 Douglas Laborers Chipping Gun (under 30 Lbs.) 39.51 7A 31 Douglas Laborers Chipping Gun(30 Lbs. And Over) 40.18 7A 31 Douglas Laborers Choker Setter 39.51 7A 31 Douglas Laborers Chuck Tender 39.51 7A 31 Douglas Laborers Clary Power Spreader 40.18 7A 31 Douglas Laborers Clean-up Laborer 39.51 7A 31 Douglas Laborers Concrete Dumper/chute Operator 40.18 7A 31 Douglas Laborers Concrete Form Stripper 39.51 7A 31 Douglas Laborers Concrete Placement Crew 40.18 7A 31 Douglas Laborers Concrete Saw Operator/core 40.18 7A 31 Driller Douglas Laborers Crusher Feeder 37 11 7A 31 Douglas Laborers Curing Laborer 39.51 7A 31 Douglas Laborers Demolition: Wrecking Et Moving 39.51 7A 31 incl. Charred Material) Douglas Laborers Ditch Digger 39.51 7A 31 Douglas Laborers Diver 40.67 7A 31 abouttlank 8N 3/15 5/23/2019 abouttlank Douglas Laborers Drill Operator 40.18 7A 31 hydraulic,diamond) Douglas Laborers Dry Stack Walls 39.51 7A 31 Douglas Laborers Dump Person 39.51 7A 31 Douglas Laborers Epoxy Technician 39.51 7A 31 Douglas Laborers Erosion Control Worker 39.51 7A 31 Douglas Laborers Faller Et Bucker Chain Saw 40.18 7A 31 Douglas Laborers Fine Graders 39.51 7A 31 Douglas Laborers Firewatch 37.11 7A 31 Douglas Laborers Form Setter 39.51 7A 31 Douglas Laborers Gabian Basket Builders 39.51 7A 31 Douglas Laborers General Laborer 39.51 7A 31 Douglas Laborers Grade Checker Et Transit Person 40.67 7A 31 Douglas Laborers Grinders 39.51 7A 31 Douglas Laborers Grout Machine Tender 39.51 7A 31 Douglas Laborers Groutmen (pressure)including 40.18 7A 31 Post Tension Beams Douglas Laborers Guage and Lock Tender 40.77 7A 31 Douglas Laborers Guardrail Erector 39.51 7A 31 Douglas Laborers Hazardous Waste Worker (level A) 40.67 7A 31 Douglas Laborers Hazardous Waste Worker (level B) 40.18 7A 31 Douglas Laborers Hazardous Waste Worker (level C) 39.51 7A 31 Douglas Laborers High Scaler 40.67 7A 31 Douglas Laborers Jackhammer 40.18 7A 31 Douglas Laborers Laserbeam Operator 40.18 7A 31 Douglas Laborers Maintenance Person 39.51 7A 31 Douglas Laborers Manhole Builder-mudman 40.18 7A 31 Douglas Laborers Material Yard Person 39.51 7A 31 Douglas Laborers Motorman -dinky Locomotive 40.18 7A 31 Douglas Laborers Nozzleman (concrete Pump, 40.18 7A 31 Green Cutter When Using Combination Of High Pressure Air Et Water On Concrete Et Rock, Sandblast, Gunite, Shotcrete, Water Bla Douglas Laborers Pavement Breaker 40.18 7A 31 Douglas Laborers Pilot Car 37.11 7A 31 Douglas Laborers Pipe Layer(lead) 40.67 7A 31 Douglas Laborers Pipe Layer/tailor 40.18 7A 31 Douglas Laborers Pipe Pot Tender 40.18 7A 31 Douglas Laborers Pipe Reliner 40.18 7A 31 Douglas Laborers Pipe Wrapper 40.18 7A 31 Douglas Laborers Pot Tender 39.51 7A 31 Douglas Laborers Powderman 40.67 7A 31 Douglas Laborers Powderman's Helper 39.51 7A 31 Douglas Laborers Power Jacks 40.18 7A 31 Douglas Laborers Railroad Spike Puller - Power 40.18 7A 31 Douglas Laborers Raker - Asphalt 40.67 7A 31 abouttlank N 4/15 5/23/2019 abouttlank Douglas Laborers Re-timberman 40.67 7A 31 Douglas Laborers Remote Equipment Operator 40.18 7A 31 Douglas Laborers Rigger/signal Person 40.18 7A 31 Douglas Laborers Rip Rap Person 39.51 7A 31 Douglas Laborers Rivet Buster 40.18 7A 31 Douglas Laborers Rodder 40.18 7A 31 Douglas Laborers Scaffold Erector 39.51 7A 31 Douglas Laborers Scale Person 39.51 7A 31 Douglas Laborers Sloper (over 20") 40.18 7A 31 Douglas Laborers Sloper Sprayer 39.51 7A 31 Douglas Laborers Spreader (concrete) 40.18 7A 31 Douglas Laborers Stake Hopper 39.51 7A 31 Douglas Laborers Stock Piler 39.51 7A 31 Douglas Laborers Tamper Et Similar Electric, Air Et 40.18 7A 31 Gas Operated Tools Douglas Laborers Tamper (multiple Et Self- 40.18 7A 31 propelled) Douglas Laborers Timber Person - Sewer (lagger, 40.18 7A 31 Shorer Et Cribber) Douglas Laborers Toolroom Person (at Jobsite) 39.51 7A 31 Douglas Laborers Topper 39.51 7A 31 Douglas Laborers Track Laborer 39.51 7A 31 Douglas Laborers Track Liner (power) 40.18 7A 31 Douglas Laborers Traffic Control Laborer 39.33 7A 31 Douglas Laborers Traffic Control Supervisor 39.33 7A 31 Douglas Laborers Truck Spotter 39.51 7A 31 Douglas Laborers Tugger Operator 40.18 7A 31 Douglas Laborers Tunnel Work -Miner 40.77 7A 31 Douglas Laborers Vibrator 40.18 7A 31 Douglas Laborers Vinyl Seamer 39.51 7A 31 Douglas Laborers Watchman 33.85 7A 31 Douglas Laborers Welder 40.18 7A 31 Douglas Laborers Well Point Laborer 40.18 7A 31 Douglas Laborers Window Washer/cleaner 33.85 7A 31 Douglas Laborers - Underground Sewer Et General Laborer Et Topman 39.51 7A 31 Water Douglas Laborers - Underground Sewer Et Pipe Layer 40.18 7A 31 Water Douglas Landscape Construction Landscape Laborer 33.85 7A 31 Douglas Landscape Construction Landscape Operator 62.77 7A 3K Douglas Landscape Maintenance Groundskeeper 12.00 1 Douglas Lathers Journey Level 58.48 5D 1 H Douglas Marble Setters Journey Level 49.04 5A 1M Douglas Metal Fabrication (In Shop) Fitter 12.76 1 Douglas Metal Fabrication (In Shop) Laborer 12.00 1 Douglas Metal Fabrication In Shop) Machine Operator 12.66 1 Douglas Metal Fabrication In Shop) Painter 12.00 1 Douglas Metal Fabrication In Shop) Welder 12.76 1 abouttlank 0 8X 5/15 5/23/2019 abouttlank Douglas Millwright Journey Level 64.25 5A 1B 8N Douglas Modular Buildings Journey Level 14.11 1 Douglas Painters Journey Level 34.65 6Z 1 W Douglas Pile Driver Journey Level 58.10 5D 4C Douglas Plasterers Journey Level 42.88 7K 1 N Douglas Playground Et Park Equipment Journey Level 12.00 1 Installers Douglas Plumbers Et Pipefitters Journey Level 80.93 6Z 1Q Douglas Power Equipment Operators Asphalt Plant Operators 63.83 7A 3K 8X Douglas Power Equipment Operators Assistant Engineer 60.04 7A 3K 8X Douglas Power Equipment Operators Barrier Machine (zipper) 63.27 7A 3K 8X Douglas Power Equipment Operators Batch Plant Operator: concrete 63.27 7A 3K 8X Douglas Power Equipment Operators Bobcat 60.04 7A 3K 8X Douglas Power Equipment Operators Brokk - Remote Demolition 60.04 7A 3K 8X Equipment Douglas Power Equipment Operators Brooms 60.04 7A 3K 8X Douglas Power Equipment Operators Bump Cutter 63.27 7A 3K 8X Douglas Power Equipment Operators Cableways 63.83 7A 3K 8X Douglas Power Equipment Operators Chipper 63.27 7A 3K 8X Douglas Power Equipment Operators Compressor 60.04 7A 3K 8X Douglas Power Equipment Operators Concrete Finish Machine - Laser 60.04 7A 3K 8X Screed Douglas Power Equipment Operators Concrete Pump - Mounted Or 62.77 7A 3K 8X Trailer High Pressure Line Pump, Pump High Pressure Douglas Power Equipment Operators Concrete Pump: Truck Mount 63.83 7A 3K 8X With Boom Attachment Over 42 M Douglas Power Equipment Operators Concrete Pump: Truck Mount 63.27 7A 3K 8X With Boom Attachment Up To 42 m Douglas Power Equipment Operators Conveyors 62.77 7A 3K 8X Douglas Power Equipment Operators Cranes friction: 200 tons and over 65.77 7A 3K 8X Douglas Power Equipment Operators Cranes: 100 tons through 199 64.47 7A 3K 8X tons, or 150' of boom (including jib with attachments) Douglas Power Equipment Operators Cranes: 20 Tons Through 44 Tons 63.27 7A 3K 8X With Attachments Douglas Power Equipment Operators Cranes: 200 tons- 299 tons, or 65.13 7A 3K 8X 250' of boom including jib with attachments Douglas Power Equipment Operators Cranes: 300 tons and over or 300' 65.77 7A 3K 8X of boom including jib with attachments Douglas Power Equipment Operators Cranes: 45 Tons Through 99 Tons, 63.83 7A 3K 8X Under 150' Of Boom (including Jib With Attachments) Douglas Power Equipment Operators Cranes: A -frame - 10 Tons And 60.04 7A 3K 8X Under Douglas Power Equipment Operators Cranes: Friction cranes through 65.13 7A 3K 8X 199 tons Douglas Power Equipment Operators Cranes: through 19 tons with 62.77 7A 3K 8X abouttlank 6/15 5/23/2019 a bo ut: bla nk attachments, A -frame over 10 tons Douglas Power Equipment Operators Crusher 63.27 7A 3K Douglas Power Equipment Operators Deck Engineer/Deck Winches 63.27 7A 3K power) Douglas Power Equipment Operators Derricks, On Building Work 63.83 7A 3K Douglas Power Equipment Operators Dozers D-9 Et Under 62.77 7A 3K Douglas Power Equipment Operators Drill Oilers: Auger Type, Truck Or 62.77 7A 3K Crane Mount Douglas Power Equipment Operators Drilling Machine 64.47 7A 3K Douglas Power Equipment Operators Elevator And Man -lift: Permanent 60.04 7A 3K And Shaft Type Douglas Power Equipment Operators Finishing Machine, Bidwell And 63.27 7A 3K Gamaco Et Similar Equipment Douglas Power Equipment Operators Forklift: 3000 Lbs And Over With 62.77 7A 3K Attachments Douglas Power Equipment Operators Forklifts: Under 3000 Lbs. With 60.04 7A 3K Attachments Douglas Power Equipment Operators Grade Engineer: Using Blue 63.27 7A 3K Prints, Cut Sheets, Etc Douglas Power Equipment Operators Gradechecker/Stakeman 60.04 7A 3K Douglas Power Equipment Operators Guardrail Punch 63.27 7A 3K Douglas Power Equipment Operators Hard Tail End Dump Articulating 63.83 7A 3K Off- Road Equipment 45 Yards. Et Over Douglas Power Equipment Operators Hard Tail End Dump Articulating 63.27 7A 3K Off -road Equipment Under 45 Yards Douglas Power Equipment Operators Horizontal/Directional Drill 62.77 7A 3K Locator Douglas Power Equipment Operators Horizontal/Directional Drill 63.27 7A 3K Operator Douglas Power Equipment Operators Hydralifts/Boom Trucks Over 10 62.77 7A 3K Tons Douglas Power Equipment Operators Hydralifts/Boom Trucks, 10 Tons 60.04 7A 3K And Under Douglas Power Equipment Operators Loader, Overhead 8 Yards. Et Over 64.47 7A 3K Douglas Power Equipment Operators Loader, Overhead, 6 Yards. But 63.83 7A 3K Not Including 8 Yards Douglas Power Equipment Operators Loaders, Overhead Under 6 Yards 63.27 7A 3K Douglas Power Equipment Operators Loaders, Plant Feed 63.27 7A 3K Douglas Power Equipment Operators Loaders: Elevating Type Belt 62.77 7A 3K Douglas Power Equipment Operators Locomotives, All 63.27 7A 3K Douglas Power Equipment Operators Material Transfer Device 63.27 7A 3K Douglas Power Equipment Operators Mechanics, All (leadmen - $0.50 64.47 7A 3K Per Hour Over Mechanic) Douglas Power Equipment Operators Motor Patrol Graders 63.83 7A 3K Douglas Power Equipment Operators Mucking Machine, Mole, Tunnel 63.83 7A 3K Drill, Boring, Road Header And/or Shield Douglas Power Equipment Operators Oil Distributors, Blower 60.04 7A 3K abouttlank 8X 8X 8X 8X 8X 8X 8X 8X 8X 8X 8X 8X 8X 8X 8X W 8X 8X 8X 8X 8X 8X 8X 8X 8X 8X 8X 8X 8X 8X 7/15 5/23/2019 abouttlank Distribution Et Mulch Seeding Operator Douglas Power Equipment Operators Outside Hoists (Elevators And 62.77 7A 3K Manlifts), Air Tuggers, Strato Douglas Power Equipment Operators Overhead, Bridge Type Crane: 20 63.27 7A 3K Tons Through 44 Tons Douglas Power Equipment Operators Overhead, Bridge Type: 100 Tons 64.47 7A 3K And Over Douglas Power Equipment Operators Overhead, Bridge Type: 45 Tons 63.83 7A 3K Through 99 Tons Douglas Power Equipment Operators Pavement Breaker 60.04 7A 3K Douglas Power Equipment Operators Pile Driver (other Than Crane 63.27 7A 3K Mount) Douglas Power Equipment Operators Plant Oiler - Asphalt, Crusher 62.77 7A 3K Douglas Power Equipment Operators Posthole Digger, Mechanical 60.04 7A 3K Douglas Power Equipment Operators Power Plant 60.04 7A 3K Douglas Power Equipment Operators Pumps - Water 60.04 7A 3K Douglas Power Equipment Operators Quad 9, Hd 41, D10 And Over 63.83 7A 3K Douglas Power Equipment Operators Quick Tower - No Cab, Under 100 60.04 7A 3K Feet In Height Based To Boom Douglas Power Equipment Operators Remote Control Operator On 63.83 7A 3K Rubber Tired Earth Moving Equipment Douglas Power Equipment Operators Rigger and Bellman 60.04 7A 3K Douglas Power Equipment Operators Rigger/Signal Person, Bellman 62.77 7A 3K Certified) Douglas Power Equipment Operators Rollagon 63.83 7A 3K Douglas Power Equipment Operators Roller, Other Than Plant Mix 60.04 7A 3K Douglas Power Equipment Operators Roller, Plant Mix Or Multi -lift 62.77 7A 3K Materials Douglas Power Equipment Operators Roto-mill, Roto-grinder 63.27 7A 3K Douglas Power Equipment Operators Saws - Concrete 62.77 7A 3K Douglas Power Equipment Operators Scraper, Self Propelled Under 45 63.27 7A 3K Yards Douglas Power Equipment Operators Scrapers - Concrete Et Carry All 62.77 7A 3K Douglas Power Equipment Operators Scrapers, Self-propelled: 45 Yards 63.83 7A 3K And Over Douglas Power Equipment Operators Service Engineers - Equipment 62.77 7A 3K Douglas Power Equipment Operators Shotcrete/Gunite Equipment 60.04 7A 3K Douglas Power Equipment Operators Shovel , Excavator, Backhoe, 62.77 7A 3K Tractors Under 15 Metric Tons Douglas Power Equipment Operators Shovel, Excavator, Backhoe: Over 63.83 7A 3K 30 Metric Tons To 50 Metric Tons Douglas Power Equipment Operators Shovel, Excavator, Backhoes, 63.27 7A 3K Tractors: 15 To 30 Metric Tons Douglas Power Equipment Operators Shovel, Excavator, Backhoes: 64.47 7A 3K Over 50 Metric Tons To 90 Metric Tons Douglas Power Equipment Operators Shovel, Excavator, Backhoes: 65.13 7A 3K Over 90 Metric Tons Douglas Power Equipment Operators Slipform Pavers 63.83 7A 3K abouttlank 8X 8X 8X 8X 8X 8X 8X 8X 8X 8X 8X 8X 8X 8X 8X 8X 8X 8X 8X 8X 8X 8X 8X 8X 8X 8X 8X 8/15 5/23/2019 Douglas Power Equipment Operators Douglas Power Equipment Operators Douglas Power Equipment Operators Douglas Power Equipment Operators Douglas Power Equipment Operators Douglas Power Equipment Operators Douglas Power Equipment Operators Douglas Power Equipment Operators Douglas Power Equipment Operators Douglas Power Equipment Operators Douglas Power Equipment Operators Douglas Power Equipment Operators Douglas Power Equipment Operators Douglas Power Equipment Operators Douglas Power Equipment Operators - Underground Sewer Et Water Douglas Power Equipment Operators - Underground Sewer Et Water Douglas Power Equipment Operators - Underground Sewer Et Water Douglas Power Equipment Operators - Underground Sewer Et Water Douglas Power Equipment Operators - Underground Sewer Et Water Douglas Power Equipment Operators - Underground Sewer Et Water Douglas Power Equipment Operators - Underground Sewer Et Water Douglas Power Equipment Operators - Underground Sewer Et Water Douglas Power Equipment Operators - Underground Sewer Et Water Douglas Power Equipment Operators - Underground Sewer Et Water Douglas Power Equipment Operators - Underground Sewer Et Water Douglas Power Equipment Operators - Underground Sewer Et Water Douglas Power Equipment Operators - Underground Sewer Et Water Douglas Power Equipment Operators - Underground Sewer Et Water Douglas Power Equipment Operators - Underground Sewer Et Water abouttlank Spreader, Topsider Et Screedman 63.83 7A Subgrader Trimmer 63.27 7A Tower Bucket Elevators 62.77 7A Tower Crane Up To 175' In Height 64.47 7A Base To Boom Tower Crane: over 175' through 65.13 7A 250' in height, base to boom Tower Cranes: over 250' in height 65.77 7A from base to boom Transporters, All Track Or Truck 63.83 7A Type Trenching Machines 62.77 7A Truck Crane Oiler/driver - 100 63.27 7A Tons And Over Truck Crane Oiler/Driver Under 62.77 7A 100 Tons Truck Mount Portable Conveyor 63.27 7A Welder 63.83 7A Wheel Tractors, Farman Type 60.04 7A Yo Yo Pay Dozer 63.27 7A Asphalt Plant Operators 63.83 7A Assistant Engineer 60.04 7A Barrier Machine (zipper) 63.27 7A Batch Plant Operator, Concrete 63.27 7A Bobcat 60.04 7A Brokk - Remote Demolition 60.04 7A Equipment Brooms 60.04 7A Bump Cutter 63.27 7A Cableways 63.83 7A Chipper 63.27 7A Compressor 60.04 7A Concrete Finish Machine - Laser 60.04 7A Screed Concrete Pump - Mounted Or Trailer High Pressure Line Pump, Pump High Pressure Concrete Pump: Truck Mount With Boom Attachment Over 42 M Concrete Pump: Truck Mount With Boom Attachment Up To 42 m 62.77 7A 3K 3K 3K 3K 3K 3K 3K 3K 3K 3K 3K 3K 3K 3K 3K 3K 3K 3K 3K 3K 8X 8X 8X 8X 8X 8X 8X 8X 8X f 8X 8X 8X 8X 8X 8X 8X 8X 8X 8X 3K 8X 3K 8X 3K 8X 3K 8X 3K 8X 3K 8X 3K 8X 63.83 7A 3K 8X 63.27 7A 3K 8X abouttlank 9/15 5/23/2019 abouttlank Douglas Power Equipment Operators- Conveyors 62.77 7A 3K 8X Underground Sewer Et Water Douglas Power Equipment Operators- Cranes friction: 200 tons and over 65.77 7A 3K 8X Underground Sewer Et Water Douglas Power Equipment Operators- Cranes: 100 tons through 199 64.47 7A 3K 8X Underground Sewer Et Water tons, or 150' of boom (including jib with attachments) Douglas Power Equipment Operators- Cranes: 20 Tons Through 44 Tons 63.27 7A 3K 8X Underground Sewer Et Water With Attachments Douglas Power Equipment Operators- Cranes: 200 tons- 299 tons, or 65.13 7A 3K 8X Underground Sewer Et Water 250' of boom including jib with attachments Douglas Power Equipment Operators- Cranes: 300 tons and over or 300' 65.77 7A 3K 8X Underground Sewer Et Water of boom including jib with attachments Douglas Power Equipment Operators- Cranes: 45 Tons Through 99 Tons, 63.83 7A 3K 8X Underground Sewer Et Water Under 150' Of Boom (including Jib With Attachments) Douglas Power Equipment Operators- Cranes: A -frame - 10 Tons And 60.04 7A 3K 8X Underground Sewer Et Water Under Douglas Power Equipment Operators- Cranes: Friction cranes through 65.13 7A 3K 8X Underground Sewer Et Water 199 tons Douglas Power Equipment Operators- Cranes: through 19 tons with 62.77 7A 3K 8X Underground Sewer Et Water attachments, A -frame over 10 tons Douglas Power Equipment Operators- Crusher 63.27 7A 3K 8X Underground Sewer Et Water Douglas Power Equipment Operators- Deck Engineer/Deck Winches 63.27 7A 3K 8X Underground Sewer Et Water power) Douglas Power Equipment Operators- Derricks, On Building Work 63.83 7A 3K 8X Underground Sewer Et Water Douglas Power Equipment Operators- Dozers D-9 Et Under 62.77 7A 3K 8X Underground Sewer Et Water Douglas Power Equipment Operators- Drill Oilers: Auger Type, Truck Or 62.77 7A 3K 8X Underground Sewer Et Water Crane Mount Douglas Power Equipment Operators- Drilling Machine 64.47 7A 3K 8X Underground Sewer Et Water Douglas Power Equipment Operators- Elevator And Man -lift: Permanent 60.04 7A 3K 8X Underground Sewer Et Water And Shaft Type Douglas Power Equipment Operators- Finishing Machine, Bidwell And 63.27 7A 3K 8X Underground Sewer Et Water Gamaco Et Similar Equipment Douglas Power Equipment Operators- Forklift: 3000 Lbs And Over With 62.77 7A 3K 8X Underground Sewer Et Water Attachments Douglas Power Equipment Operators- Forklifts: Under 3000 Lbs. With 60.04 7A 3K 8X Underground Sewer Et Water Attachments Douglas Power Equipment Operators- Grade Engineer: Using Blue 63.27 7A 3K 8X Underground Sewer Et Water Prints, Cut Sheets, Etc Douglas Power Equipment Operators- Gradechecker/Stakeman 60.04 7A 3K 8X Underground Sewer Et Water Douglas Power Equipment Operators- Guardrail Punch 63.27 7A 3K 8X Underground Sewer Et Water Douglas Power Equipment Operators- Hard Tail End Dump Articulating 63.83 7A 3K 8X Underground Sewer Et Water Off- Road Equipment 45 Yards. Et Over abouttlank 10/15 5/23/2019 abouttlank Douglas Power Equipment Operators- Hard Tail End Dump Articulating 63.27 7A 3K 8X Underground Sewer Et Water Off -road Equipment Under 45 Yards Douglas Power Equipment Operators- Horizontal/Directional Drill 62.77 7A 3K 8X Underground Sewer Et Water Locator Douglas Power Equipment Operators- Horizontal/Directional Drill 63.27 7A 3K 8X Underground Sewer Et Water Operator Douglas Power Equipment Operators- Hydralifts/Boom Trucks Over 10 62.77 7A 3K 8X Underground Sewer Et Water Tons Douglas Power Equipment Operators- Hydralifts/Boom Trucks, 10 Tons 60.04 7A 3K 8X Underground Sewer Et Water And Under Douglas Power Equipment Operators- Loader, Overhead 8 Yards. Et Over 64.47 7A 3K 8X Underground Sewer Et Water Douglas Power Equipment Operators- Loader, Overhead, 6 Yards. But 63.83 7A 3K 8X Underground Sewer Et Water Not Including 8 Yards Douglas Power Equipment Operators- Loaders, Overhead Under 6 Yards 63.27 7A 3K 8X Underground Sewer Et Water Douglas Power Equipment Operators- Loaders, Plant Feed 63.27 7A 3K 8X Underground Sewer Et Water Douglas Power Equipment Operators- Loaders: Elevating Type Belt 62.77 7A 3K 8X Underground Sewer Et Water Douglas Power Equipment Operators- Locomotives, All 63.27 7A 3K 8X Underground Sewer Et Water Douglas Power Equipment Operators- Material Transfer Device 63.27 7A 3K 8X Underground Sewer Et Water Douglas Power Equipment Operators- Mechanics, All (leadmen - $0.50 64.47 7A 3K 8X Underground Sewer Et Water Per Hour Over Mechanic) Douglas Power Equipment Operators- Motor Patrol Graders 63.83 7A 3K 8X Underground Sewer Et Water Douglas Power Equipment Operators- Mucking Machine, Mole, Tunnel 63.83 7A 3K 8X Underground Sewer Et Water Drill, Boring, Road Header And/or Shield Douglas Power Equipment Operators- Oil Distributors, Blower 60.04 7A 3K 8X Underground Sewer Et Water Distribution Et Mulch Seeding Operator Douglas Power Equipment Operators- Outside Hoists (Elevators And 62.77 7A _ 3K 8X Underground Sewer Et Water Manlifts), Air Tuggers, Strato Douglas Power Equipment Operators- Overhead, Bridge Type Crane: 20 63.27 7A 3K 8X Underground Sewer Et Water Tons Through 44 Tons Douglas Power Equipment Operators- Overhead, Bridge Type: 100 Tons 64.47 7A 3K 8X Underground Sewer Et Water And Over Douglas Power Equipment Operators- Overhead, Bridge Type: 45 Tons 63.83 7A 3K 8X Underground Sewer Et Water Through 99 Tons Douglas Power Equipment Operators- Pavement Breaker 60.04 7A 3K 8X Underground Sewer Et Water Douglas Power Equipment Operators- Pile Driver (other Than Crane 63.27 7A 3K 8X Underground Sewer Et Water Mount) Douglas Power Equipment Operators- Plant Oiler - Asphalt, Crusher 62.71 7A 3K 8X Underground Sewer Et Water Douglas Power Equipment Operators- Posthole Digger, Mechanical 60.04 7A 3K 8X Underground Sewer Et Water Douglas Power Equipment Operators- Power Plant 60.04 7A 3K 8X Underground Sewer Et Water abouttlank 11/15 5/23/2019 Douglas Power Equipment Operators - Underground Sewer Et Water Douglas Power Equipment Operators - Underground Sewer Et Water Douglas Power Equipment Operators - Underground Sewer Et Water Douglas Power Equipment Operators - Underground Sewer Et Water Douglas Power Equipment Operators - Underground Sewer Et Water Douglas Power Equipment Operators - Underground Sewer Et Water Douglas Power Equipment Operators - Underground Sewer Et Water Douglas Power Equipment Operators - Underground Sewer Et Water Douglas Power Equipment Operators - Underground Sewer Et Water Douglas Power Equipment Operators - Underground Sewer Et Water Douglas Power Equipment Operators - Underground Sewer Et Water Douglas Power Equipment Operators - Underground Sewer Et Water Douglas Power Equipment Operators - Underground Sewer Et Water Douglas Power Equipment Operators - Underground Sewer Et Water Douglas Power Equipment Operators - Underground Sewer Et Water Douglas Power Equipment Operators - Underground Sewer Et Water Douglas Power Equipment Operators - Underground Sewer Et Water Douglas Power Equipment Operators - Underground Sewer Et Water Douglas Power Equipment Operators - Underground Sewer Et Water Douglas Power Equipment Operators - Underground Sewer Et Water Douglas Power Equipment Operators - Underground Sewer Et Water Douglas Power Equipment Operators - Underground Sewer Et Water Douglas Power Equipment Operators - Underground Sewer Et Water Douglas Power Equipment Operators - Underground Sewer Et Water Douglas Power Equipment Operators - Underground Sewer Et Water Douglas Power Equipment Operators- abouttlank abouttlank Pumps - Water 60.04 7A Quad 9, Hd 41, D10 And Over 63.83 7A Quick Tower - No Cab, Under 100 60.04 7A Feet in Height Based To Boom Remote Control Operator On 63.83 7A Rubber Tired Earth Moving Equipment Rigger and Bellman 60.04 7A Rigger/Signal Person, Bellman 62.77 7A Certified) Rollagon 63.83 7A Roller, Other Than Plant Mix 60.04 7A Roller, Plant Mix Or Multi -lift 62.77 7A Materials Roto-mill, Roto-grinder 63.27 7A Saws - Concrete 62.77 7A Scraper, Self Propelled Under 45 63.27 7A Yards Scrapers - Concrete Et Carry All 62.77 7A Scrapers, Self-propelled: 45 Yards 63.83 7A And Over Service Engineers - Equipment 62.77 7A Shotcrete/Gunite Equipment 60.04 7A Shovel, Excavator, Backhoe, 62.77 7A Tractors Under 15 Metric Tons Shovel, Excavator, Backhoe: Over 63.83 7A 30 Metric Tons To 50 Metric Tons Shovel, Excavator, Backhoes, 63.27 7A Tractors: 15 To 30 Metric Tons Shovel, Excavator, Backhoes: 64.47 7A Over 50 Metric Tons To 90 Metric Tons Shovel, Excavator, Backhoes: 65.13 7A Over 90 Metric Tons Slipform Pavers 63.83 7A Spreader, Topsider Et Screedman $63.83 7A Subgrader Trimmer $63.27 7A Tower Bucket Elevators $62.77 7A Tower Crane Up To 175' In Height $64.47 7A 3K 3K 3K 3K 3K 3K 3K 3K 3K 3K 3K 3K 3K 3K 3K 3K 3K 3K 3K 3K 3K 3K 3K 3K 3K 3K 8X 8X 8X 8X 8X 8X 8X 8X 8X 8X 8X 8X 8X 8X 8X 8X 8X 8X 8X 8X 8X 8X 8X 8X 8X 8X 12/15 5/23/2019 abouttlank Underground Sewer Et Water Base To Boom Douglas Power Equipment Operators- Tower Crane: over 175' through 65.13 7A 3K 8X Underground Sewer Et Water 250' in height, base to boom Douglas Power Equipment Operators- Tower Cranes: over 250' in height 65.77 7A 3K 8X Underground Sewer Et Water from base to boom Douglas Power Equipment Operators- Transporters, All Track Or Truck 63.83 7A 3K 8X Underground Sewer Et Water Type Douglas Power Equipment Operators- Trenching Machines 62.77 7A 3K 8X Underground Sewer Et Water Douglas Power Equipment Operators- Truck Crane Oiler/driver - 100 63.27 7A 3K 8X Underground Sewer Et Water Tons And Over Douglas Power Equipment Operators- Truck Crane Oiler/Driver Under 62.77 7A 3K 8X Underground Sewer Et Water 100 Tons Douglas Power Equipment Operators- Truck Mount Portable Conveyor 63.27 7A 3K 8X Underground Sewer Et Water Douglas Power Equipment Operators- Welder 63.83 7A 3K 8X Underground Sewer Et Water Douglas Power Equipment Operators- Wheel Tractors, Farman Type 60.04 7A 3K 8X Underground Sewer Et Water Douglas Power Equipment Operators- Yo Yo Pay Dozer 63.27 7A 3K 8X Underground Sewer Et Water Douglas Power Line Clearance Tree Journey Level In Charge 49.96 5A 4A Trimmers Douglas Power Line Clearance Tree Spray Person 47.37 5A 4A Trimmers Douglas Power Line Clearance Tree Tree Equipment Operator 49.96 5A 4A Trimmers Douglas Power Line Clearance Tree Tree Trimmer 44.57 5A 4A Trimmers Douglas Power Line Clearance Tree Tree Trimmer Groundperson 33.60 5A 4A Trimmers Douglas Refrigeration Et Air Conditioning Journey Level 80.93 6Z 1Q Mechanics Douglas Residential Brick Mason Journey Level 49.04 5A 1M Douglas Residential Carpenters Journey Level 42.98 5D 4C Douglas Residential Cement Masons Journey Level 43.20 7B 1 N Douglas Residential Drywall Applicators Journey Level 13.64 1 Douglas Residential Drywall Tapers Journey Level 40.10 7E 1 P Douglas Residential Electricians Journey Level 29.00 51 1 E Douglas Residential Glaziers Journey Level 30.59 7L 4L Douglas Residential Insulation Applicators Journey Level 45.11 5A 113 8N Douglas Residential Laborers Journey Level 36.68 7A 1 H Douglas Residential Marble Setters Journey Level 49.04 5A 1M Douglas Residential Painters Journey Level 34.65 6Z 1 W Douglas Residential Plumbers Et Pipefitters Journey Level 58.78 6Z 1Q Douglas Residential Refrigeration Et Air ou, ey LcJci 58.18 6Z Q Conditioning Mechanics Douglas Residential Sheet Metal Workers Journey Level (Field or Shop) 54.61 51 1 B Douglas Residential Soft Floor Layers Journey Level 15.79 1 Douglas Residential Sprinkler Fitters (Fire Journey Level 31.19 7J 1R Protection). abouttlank 13/15 5/23/2019 abouttlank Douglas Residential Stone Masons Journey Level 49.04 5A 1M Douglas Residential Terrazzo Workers Journey Level 42.21 5A 1M Douglas Residential Terrazzo/Tile Finishers Journey Level 34.33 5A 1M Douglas Residential Tile Setters Journey Level 42.21 5A 1M Douglas Roofers Journey Level 40.21 51 1 R Douglas Roofers Using Irritable Bituminous 42.21 51 1 R Materials Douglas Sheet Metal Workers Journey Level (Field or Shop) 54.61 6Z 113 Douglas Sign Makers Et Installers Journey Level 69.10 7F 1E Electricat), Douglas Sign Makers it Installers (Non- Journey Level 16.14 1- Electrical). Douglas Soft Floor Layers Journey Level 15.79 1 Douglas Solar Controls For Windows Journey Level 12.00 1 Douglas Sprinkler Fitters (Fire Protection) Journey Level 56.82 7J 1R Douglas Stage Rigging Mechanics (Non Journey Level 13.23 1- Structural), Douglas Stone Masons Journey Level 49.04 5A 1M Douglas Street And Parking Lot Sweeper Journey Level 14.00 1 Workers Douglas Surveyors Assistant Construction Site 62.71 7A 3K Surveyor Douglas Surveyors Assistant Construction Site 62.71 7A 3K Surveyor Douglas Surveyors Chainman 58.93 7A 3C Douglas Surveyors Construction Site Surveyor 63.76 7A 3K Douglas Telecommunication Technicians Telecom Technician Journey Level 43.70 5B 1 B Douglas Telephone Line Construction - Cable Splicer 41.22 5A 2B Outside Douglas Telephone Line Construction - Hole Digger/Ground Person 23.12 5A 2B Outside Douglas Telephone Line Construction - Installer (Repairer) 39.53 5A 2B Outside Douglas Telephone Line Construction - Special Aparatus Installer 1 41.22 5A 2B Outside Douglas Telephone Line Construction - Special Apparatus Installer 11 40.41 5A 2B Outside Douglas Telephone Line Construction - Telephone Equipment Operator 41.22 5A 2B Outside Heavy) Douglas Telephone Line Construction - Telephone Equipment Operator 38.36 5A 2B Outside Light) Douglas Telephone Line Construction - Telephone Lineperson 38.36 5A 2B Outside Douglas Telephone Line Construction - Television Groundperson 21.92 5A 2B Outside Douglas Telephone Line Construction - Television Lineperson/installer 29. i 3 5A 2B Outside Douglas Telephone Line Construction - Television System Technician 34.68 5A 2B Outside Douglas Telephone Line Construction - Television Technician 31.18 5A 2B Outside abouttlank 8X 8X 8P 8X 14/15 5/23/2019 abouttlank Douglas Telephone Line Construction - Tree Trimmer 38.36 5A 2B Outside Douglas Terrazzo Workers Journey Level 42.21 5A 1M Douglas Tile Setters Journey Level 42.21 5A 1M Douglas Tile, Marble Et Terrazzo Finishers Journey Level 34.33 5A 1M Douglas Traffic Control Stripers Journey Level 46.23 7A 1 K Douglas Truck Drivers Asphalt Mix Over 20 Yards 44.69 5D 1V 8M Douglas Truck Drivers Asphalt Mix To 20 Yards 44.52 5D 1V 8M Douglas Truck Drivers Dump Truck 44.52 5D 1V 8M Douglas Truck Drivers Dump Truck Et Trailer 44.69 5D 1V 8M Douglas Truck Drivers Other Trucks 44.41 5D 1V 8M Douglas Truck Drivers - Ready Mix Transit Mixers 3 yards to include 6 44.08 5D 1V 8M yards Douglas Truck Drivers - Ready Mix Transit Mixers over 10 yards to 44.69 5D 1V 8M include 20 yards Douglas Truck Drivers - Ready Mix Transit Mixers over 20 yards 45.22 5D 1 V 8M Douglas Truck Drivers - Ready Mix Transit Mixers over 6 yards to 44.52 5D 1 V 8M include 10 yards Douglas Well Drillers Et Irrigation Pump Irrigation Pump Installer 12.00 1 Installers Douglas Well Drillers Et Irrigation Pump Oiler 12.00 1 Installers Douglas Well Drillers Et Irrigation Pump Well Driller 18.00 1 Installers abouttlank 15/15 ras F L • Q 9 . ALC RO® v CERTIFICATE OF LIABILITY INSURANCE DATE (MM/DD/YYYY) THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER InSUrePro 11756 US HWY 2 Leavenworth WA 98826 GUNIAGINAME: Lizzie Ortiz PHONE 5095485488A/C, No, EFAXxt : (A/C, No): ADDRESS: Service2@InsurePro.info INSURER(S) AFFORDING COVERAGE NAIC # INSURERA: NAUTILUS INS CO 17370 INSURED Ridgeline Custom Builders, LLC PO Box 3572 Wenatchee WA 98807 INSURER B : INSURER C : INSURER D : INSURER E : INSURER F: COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACTOR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSRLTR TYPE OF INSURANCE INSD WVD POLICY NUMBER MMIDD/YYYY) INMIDDNYYY) LIMITS A X COMMERCIAL GENERAL LIABILITY CLAIMS -MADE OCCUR X NN973803 10/29/2018 10/29/2019 EACH OCCURRENCE 1,000,000 PREMISES (Ea occurrence) 100,000 MED EXP (Any one person) 5,000 PERSONAL & ADV INJURY 1,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: X POLICY PRO- LOCJECT OTHER: GENERAL AGGREGATE 2.000,000 PRODUCTS -COMP/0P AGG 2,000.000 AUTOMOBILE LIABILITY ANY AUTO OWNED SCHEDULED AUTOS ONLY AUTOS HIRED NON -OWNED AUTOS ONLY AUTOS ONLY COMBINED SINGLE LIMIT— Ea accident) BODILY INJURY (Per person) BODILY INJURY (Per accident) Per accident) UMBRELLA LIAB EXCESS LIAB OCCUR CLAIMS -MADE EACH OCCURRENCE AGGREGATE DED I I RETENTION $ S WORKERS COMPENSATION AND EMPLOYERS' LIABILITY YIN ANY PROPRIETOR/PARTNER/EXECUTIVE FFICERIMEMBER EXCLUDED? Mandatory in NH) If yes, describe under DESCRIPTION OF OPERATIONS below NIAA STATUTE ER E.L. EACH ACCIDENT s E.L. DISEASE - EA EMPLOYEE S E.L. DISEASE - POLICY LIMIT S DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required) THE CERTIFICATE HOLDER LISTED ON THE BOTTOM LEFT, IS LISTED AS AN ADDITIONAL INSURED UNDER THE BLANKET ADDITIONAL INSURED ENDORSEMENT INCLUDED IN THIS POLICY. City of East Wenatchee 271 9th St. NE East Wenatchee, WA 98802 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. REPRESENTATIVE @ 1988-2015 ACORD CORPORATION. All rights reserved. ACORD 25 (2016103) The ACORD name and logo are registered marks of ACORD