Loading...
HomeMy WebLinkAbout2019-09-17 - RH2 Engineering INC - General Agreements / General Service Agreements - 2019-02Original 1 Page \o. _ 1, of _Pal;cs Task Authorization No. 2 City of East Wenatchee 19th Street NE Stormwater Improvements September 2019 RH2 Project No. 2019-018 Scope of Services The City of East Wenatchee (City) has requested RH2 Engineering, Inc., (RH2) to complete a stormwater design on 19th Street NE. The project limits begin approximately 800 feet west of Eastmont Avenue and extend approximately 500 feet along 19th Street NE to the west. Proposed improvements consist of curb, gutter, and a closed stormwater system along the west side of the road. 1.1 Prepare plans and specifications to complete approximately 500 linear feet of curb, gutter, and stormwater improvements along one side of 19th Street NE. RH2 will sub -consult with a local surveyor to provide a limited topographic survey. 1.2 Prepare a stormwater narrative identifying the conveyance capacity of the proposed improvements. A basin -wide stormwater analysis will not be completed. 1.3 Provide services during bidding to respond to contractor questions, provide up to one (1) addendum, if necessary, and provide a recommendation of award letter. 1.4 Provide on -call construction services to support the City during construction. Review submittals for the concrete, stormwater pipe, stormwater structures, rock, and asphalt. Provide construction observation services at milestone points during construction such as subsurface preparation, checking pipe and structures for plan consistency, checking forms or string line for the concrete curbing, and observing placement of rock and asphalt. It is assumed RH2 will not provide full-time observation but instead support the City's staff. Assumptions: This project will be bid as a small works project utilizing the City's small works roster. It is assumed this project is State Environmental Policy Act (SEPA) categorically exempt per Washington Administrative Code (WAC) 197-11-800(2)(vii). It is assumed this project is under the threshold requirements for a Washington State Department of Ecology Construction Stormwater General Permit. Provided by City: • Right-of-way construction permit as needed. RH2 Deliverables: • Plans and specifications for improvements in electronic PDF format. • Stormwater narrative in electronic PDF format. • Up to one (1) addendum in electronic PDF format. • Recommendation of award letter in electronic PDF format. • Submittal reviews in electronic PDF format. • Part-time construction observations. 1 9/11/2019 9:05:43 AM J:\data\EW\219-01&\TA 2 19th Street\00 Contract\TaskAuth No. 2 5QW 9th St Starmwatm.d= Original .1 _PAgc'\o. 2 3--Yagc. City of East Wenatchee Task Authorization No. 2 191h Street NE Stormwater Improvements Scope of Work Project Schedule Design work will be complete by October 15, 2019. It is anticipated the City will go out for bid in October, with construction scheduled to be complete by November 15, 2019. Subconsultants RH2 will utilize a local surveyor to complete the topographic survey. It is estimated that the surveyor will survey from the road centerline to 5 feet beyond the western edge of pavement for the length of the project. Fee for Services The fee for services shall be on a time and expense basis in accordance with the Professional Services Agreement for 2019 General Services dated January 22, 2019, that has been fully executed between the City and RH2 Engineering, Inc. The fee for services shall not exceed $23,668.48 as shown on attached Exhibit A, Fee Estimate without prior written authorization of the City. RH2 Engineering, Inc. 1 // � Z k �2) � Sign ture Randy L. Asplund —Director Print Name/Title Date City of East Wenatchee r� 'gnature 1"Or 1D' /� Print Name/Title 7—/ -7 ;z Date 9/11/19 9:05 AM J:\data\EW\219.018\TA 219th Street\00 Contract\TaskAuth No. 2_SOW 9th St Stormwater.docx EXHIBIT A Fee Estimate City of East Wenatchee Task Authorization No. 2 19th Street NE Stormwater Improvements Sep-19 OrIgmal T I_._,Pagc No, 3 _nf 3 i,agr. Description Total Total Labor Total Subconsultant Total Expense Total Cost Hours .................................................................................................... ....__ .. ww.. Classification Task 1 Stormwater Design, Bidding, and Construction 1 106 1 $ 16,199 1 $ 5,750 1 $ 1,7191 $ 23,666 PROJECT TOTAL 106 $ 16,199 $ 5,750 $ 1,719.48 $ 23,668.48 .G V,2111.fit. -µ ` 7p,. $ ,'.j,,,, l... , . i , ..A,. , N C_' CE_ S S. . . . �eO17 ". ,7 rdi