Loading...
HomeMy WebLinkAboutResolutions - 2004-05 - Adopting a six-year transportation improvement program and directing the same to be filed with the state secretary of transportation, TIP, (2004-2010 inclusive) - 7/13/2004RESOLUTION NO.04-05 A RESOLUTION OF THE CITY OF EAST WENATCHEE,WASHINGTON ADOPTING A SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM AND DIRECTING THE SAME TO BE FILED WITH THE STATE SECRETARY OF TRANSPORTATION AND THE TRANSPORTATION IMPROVEMENT BOARD. WHEREAS,pursuant to the requirements of Chapters 35.77 and 46.26 RCW,the City Council of the City of East Wenatchee has previously adopted a Comprehensive Street Program,including an arterial street construction program,and thereafter periodically modified said Comprehensive Street Program by resolutions;and WHEREAS,the City Council has reviewed the work accomplished under the said program, determined current and future city street and arterial needs,and based upon these findings has prioritized a Six-Year Transportation Improvement Program for the ensuing six (6)calendar years;and WHEREAS,a public hearing has been held on the Six-Year Transportation Improvement Program;and WHEREAS,the City Council finds that there will be no significant adverse environmental impacts as a result of adoption or implementation of the Six-Year Transportation Improvement Program, NOW,THEREFORE,THE CITY COUNCIL OF THE CITY OF EAST WENATCHEE,WASHINGTON, HEREBY RESOLVE,as follows: Section 1.Program Adopted.The Six-Year Transportation Improvement Program for the City of East Wenatchee,as revised and extended for the ensuing six (6)calendar years (2004-2010 inclusive),a copy of which is attached hereto as Exhibit A and incorporated herein by this reference as if fully set forth,which program sets forth the project location,type of improvement and the estimated cost thereof,is hereby adopted and approved. Section 2.Filing of Program.Pursuant to Chapter 35.77 RCW,the City Clerk is hereby authorized and directed to file a copy of this resolution,together with the exhibit attached,with the Secretary of Transportation and the Transportation Improvement Board for the State of Washington. :+J1 PASSED by the City Council this 12)day of -----7":::........r--7"F- ATTEST/AUTHENTICATED: [;){)J(ft)~~(lfVL cL Dana Barnard,City Clerk FILED WITH THE CITY CLERK:06/~~/04 PASSED BY THE CITY COUNCIL:lIt3!Dl{ RESOLUTION NO.04-05 Washington State Department of Transportation Six Year Transportation Improvement Program From 2005 to 2010Agency:East Wenatchee Co.No.:09 Co.Name: City No.:0350 MPO/RTPO: Douglas Co. NON/NC Hearing Date:6-22-2004 Amend Date: Adoption Date:7-13-2004 Resolution No.:04-05 Project Identification Project Costs in Thousands of Dollars Federally Funded.....s::.til Expenditure Schedule Projects OnlyA.Federal Aid No.B.Bridge No.e:::....Q)Fund Source Information~lil Cl "C Q)(Local Agency)(ij ~ID til e:::0 (/) c:::til C.Project Title Q)-::;,Q)u C'il Federal Funding.Q en 'C ..c ~~......J ~RIW u~.Q E 19 ~~a.. §o ~::J D.StreeURoad Name or Number a~CI)t5 Phase Federal Federal State 4th Required o..z .§0 5 State Local Total Envir.DateLI..E.Beginning MP or road -Ending MP or road ~Q)Start Fund Cost by Fund Thru'0'(mm/ddlywy)Code Funds Funds Funds 1st 2nd 3rd Type (MMIYY)F.Describe Work to be Done "-Phase Code 6tha.. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 16 1 01 S 0.80 C PE 9-1-2005 1 420 420 197 223 CE Eastmont Avenue Reconstruction 03 p RW 6-1-2006 1 193 1931 193 06 S CN 4-1-2008 1 3587 35871 3587 from:Grant Road to:Ninth Street NE T Widening,curb,gutter,sidewalk,drainage G Totals 4200 4200 197 416 3587 16 2 03 S 0.47 C PE 1-1-2005 STP 54 TPP!1261 71 1871 71 1 CE Eastmont Avenue Widening 04 p RW 1-1-2006 STP 10 1 7[21 191 I 21 06 s CN 4-1-2007 STP 492 1 11491 661 17071 1 I 66 from:15th Strteet to:N.City Limits T 4-2007 Widening,curb,gutter,sidewalk,illumination,drainage W G Totals 556 1282 75 1913 7 2 66 17 3 03 S 0.35 C PE 2/1/2001 REV 266 1 1 421 3081 1 1 CE Baker Avenue Reconstruction -CBO 04 S RW 1-1-2004 REV 296 1 1 461 3421 23[1 06 G CN 4-1-2005 REV 1500 I 1 2341 17341 2241 101 from:Ninth Street NE to:Fifth Street NE p 4-2005 R/S acquisition,widening,curb,gutter sidewalk,drainage T W Totals 2062 322 2384 247 10 16 4 01 S 0.47 P PE 2-1-2001 REV 138 1 1 221 1601 1 1 CE Third Street NE Realignment-CBO 03 W RW 1-1-2004 REV 883 1 I 1381 10211 701 1 04 T CN 4-1-2005 REV 792 1 I 1241 9161 1141 101 from:Baker Avenue NE to:Eastmont Avenue NE 06 G 4/2005 R!W acquistion,new alignment/construction S C Totals 1813 284 2097 184 10 17 5 01 S 0.21 C PE 2-1-2001 REV 112 I 1 171 1291 I 1 CE Baker Avenue Extension -CBO 03 P RW 1-1-2004 REV 48 1 1 81 561 1 I 04 S CN 4-1-2005 REV 300 I 1 471 3471 3371 101 from:Fourth Street NE to:Third Street NE 06 T 4/2005 RIW Acquisition,new construction,Canyon A drainage G Totals 460 72 532 337 10 16 6 12 S 0.50 PE I 9-1-2004 I , I PSMPI 101 151 251 101 1 I CE 15th Street Pedestrian Safety CN 4-1-2005 1 75[1251 2001 1251 1 from:N.Baker to:Eastmont Avenue RIW acquisition,new construction Totals 85 140 225 135 Report Date:July 7,2004 Page 1 Supersedes previous editions Washington State Department of Transportation Six Year Transportation Improvement Program From 2005 to 2010Agency:East Wenatchee Co.No.:09 Co.Name: City No.:0350 MPO/RTPO: Douglas Co. NON/NC Hearing Date: Amend Date: Adoption Date: Resolution No.: Project Identification Project Costs in Thousands of Dollars Federally Funded.....c l1J Fund Source Information Expenditure Schedule Projects OnlyA.Federal Aid No.B.Bridge No.s::::....(I)~Cil Cl "0 Q)(Local Agency)m ~G3 l1J s::::0 (/) s::::l1J C.Project Title (1)-==(I)u Ctl Federal Funding RIW.2 l/)'C .0 ~~........J ~uJ!!.Q E !!l ~a.. §U I-:::J D.Street/Road Name or Number a~en I9 t5 Phase Federal Federal State 4th Required o..z E.Beginning MP or road •Ending MP or road .§0 :t:l Start State Local Total Envir.DateL.L.I-:J Q)Fund Cost by Fund 1st 2nd 3rd Thru'0'Funds Funds Funds Type (MMIYY) F.Describe Work to be Done ~(mm/dd/yyyy)Code Phase Code 6tha.. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 I 07 7 03 P 0.50 P PE 3-1-2006 TPP 781 11 1 89 I 11 CE Baker Avenue Reconstruction 05 W RW 12-1-2006 1 I I 1 06 T CN 2-1-2008 7061 1121 8181 1 112 from:15th Street NE to:City Limits 07 G Curbs,gutter,sidewalk,drainage,illumination S C Totals 784 123 907 11 112 19 8 01 P 0.07 S CN I 2-1-2005 I I I 1 1 1301 1301 1301 1 I CE IGroverAvenueWidening06C P from:8th Street NE to:10th Street NE G New Construction T W Totals 130 130 130 14 9 06 P 00 P PE I 9-1-2007 I I I 1 I 201 201 1 1 20 1 CE Ninth Street &Valley Mall Parkway Intersection 12 CN 5-1-2008 I I 2201 2201 1 1 220 from:to: Traffic Signal Interconnect Totals 240 240 20 220 16 10 01 P 0.14 C PE 2-1-2008 I 2051 851 2901 1 1 CE 19th Street NE Realignment 03 G RW 1-1-2009 I 621 281 901 1 1 06 P CN 3-1-2010 I 8171 3531 1170 I 1 1 from:East of Country Club DR to:Eastmont Avenue S RIW acquistition,new construction T W Totals 1084 466 1550 17 11 03 P 0.71 P PE I 9-1-2008 I I I 1 I 1901 1901 I 1 1 CE 15th Street NE Reconstruction 05 W CN 6-1-2010 1 1 17101 17101 I 1 06 G from:SR 28 to:Eastmont Avenue T Widening,curb,gutter,sidewalk,drainage S C Totals 1900 1900 17 12 01 P 0.10 C PE 1-1-2008 1 761 121 881 1 I CE Baker Avenue Extension 06 G RW 2-1-2009 I 7881 1391 9271 1 1 P CN 3-1-2010 1 901[1591 10601 1 1 from:Third Avenue NE to:Grant Road S RIW acuisition T W Totals 1765 310 2075 Report Date:July 7,2004 Page 2 Supersedes previous editions Washington State Department of Transportation Six Year Transportation Improvement Program From 2005 to 2010Agency:East Wenatchee Co.No.:09 Co.Name: City No.:0350 MPO/RTPO: Douglas Co. NON/NC Hearing Date: Amend Date: Adoption Date: Resolution No.: Project Identification Project Costs in Thousands of Dollars Federally Funded.....c 11l Fund Source Information Expenditure Schedule Projects OnlyA.Federal Aid No.B.Bridge No.e '5l Q)~(i)'t'Q)(Local Agency)co z-Ci3 11l e 0 en e rn C.Project Title Q)-;:,Q)(J ro Federal Funding RIW.Q rn .~.0 ~~......J ..c: t5~.Q E J!!~c..Requiredcu~:::J D.Street/Road Name or Number a~en :E 13 Phase Federal Federal State 4th ::::l c.z E.Beginning MP or road -Ending MP or road .§0 State Local Total Envir.DateLL.I-:::J Q)Start Fund Cost by Fund 1st 2nd 3rd Thru F.Describe Work to be Done 'e'(mm/dd/yyyy)Code Phase Code Funds Funds Funds 6th Type (MMIYY) c.. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 I 13 03 P 00 C PE I I CE Street Safety Improvements 05 G RW I I I 06 P eN 4-1-2005 941 941 94 1 from:to:12 S Various Improvements -All Streets T W Totals 94 94 94 Grand Totals for East Wenatchee 4891 5000 8356 18247 1331 459 86 3919 Report Date:July 7,2004 Page 3 Supersedes previous editions