HomeMy WebLinkAbout2019-06-04 - SCJ ALLIANCE - General Agreements / General Service Agreements - 2018-04 (3)i� SCJ ALLIANCE corasucrrt�� seavicEs CHANGE ORDER Contract Number Contract Title Federal Aid Number 2018-04 Gateway Park Project N/A Change Order Number Change Description Date 4 Additional Removal Items 5/8/19 Region Project Engineer Phone Number Dan Ireland 509-886-3265 Prime Contractor / Design -Builder KRCI LLC ❑ Ordered by Engineer under the terms of Section 1-04.4 of the Standard Specifications or the RFP ❑� Change proposed by Contractor / Design -Builder Change Description Originated as RFI #5: Time Capsule Excavation, RFI #6: Existing Junction Box Grade, RFI #7: Pothole Tree Location, and RFP #5: Existing Sign Base Removal. Intent of this change order was to combine separate unforeseen removal items into one change order. Contract Plan Sheets: No Change Construction Requirements/Special Provisions: No Change Change in Contract Costs: The cost for this Change Order is the cost of KCRI work for unforseen removal items including concrete removal and haul, additional excavation, potholing in tree locations, removing sign base, lowering existing J-box, and trimming concrete around existing light base. Contractor provided Force Account tracking information for work. Concrete removal/haul = $4,497.56 Time capsule additional excavation = $238.49 Tree potholing = $418.82 Sign base removal = $345.27 Lower existing j-box = $239.96 Light base trimming = $102.10 Total Cost = $5,842.21 Working Days: There is no change to the critical path with this change. Original Contract Amount Current Contract Amount Est. Net Change This C.O. Est. Revised Contract Amount $ 516,008.00 $ 516,478.40 $ 5,842.21 $ 522,113.42 Prime Contractor / Design -Builder Signature or Method of Concurrence: Project Engineer's Signature for Execution: Distribution: Copy of Change Order Page & Memorandum Page w/Backup - Project Engineer Copy of ONLY Change Order Page - Prime Contrac r Design -Builder Copy of Change Order Page &Memorandum Pa w/ Backup - Region C struction Office Original of Change Order Page & Memorandum a /Checkli,Yaryd roval Documentat Contracting Authority Signature for Execution: DOT Form 421-005A EF Revised 12/09 Date Date ate Dghstrurtion Office 141 / Change Order Page Change Order - Minor Change Contract Number Contract Title Change Order Number 2018-04 Gateway Park Project 74 Brief Description of Problem / Reason for Entitlement: Concrete removal/haul: Unforeseen concrete was found in various locations on site and had to be removed and hauled off site. Time capsule additional excavation: During excavation for the time capsule, a 18" diameter concrete pipe was found 2-2.5' below grade. Additional excavation was required to move the capsule over approximately 2'. Tree potholing: Due to concrete found on site, tree locations along 9th Street were potholed to identify potential planting issues. Concrete was found in 1 of 3 locations and its removal was tracked under FA information for "Concrete removal/haul". Sign base removal: Former Texaco sign base was found to be above finish grade and had to be cut down. Lower existing J-box: Existing junction box was found to be 0.2' above finish grade and was lowered to eliminate tripping hazard in sidewalk. Light base trimming: The existing light base was surrounded in concrete and additional work had to be done to create clean edges for concrete sidewalk to be poured around. Justification of Cost: KCRI work was tracked via force accounts, in the exception of the sign base removal, which was an agreed upon lump sum price. Concrete removal/haul = $4,497.56 (FA tracking) Time capsule additional excavation = $238.49 (FA tracking) Tree potholing = $418.82 (FA tracking) Sign base removal = $345.27 (LS price) Lower existing j-box = $239.96 (FA tracking) Light base trimming = $102.10 (FA tracking) Total = $5,842.21 Calculated By Date Checked By Date Caitlin Mehall 5/8/19 Inspector Date Work Started Work Completed Item No. Item Group Date Unit Quantity RAM/QPL Ledger no. Post Ckd Est. No. Distribution: Copy of Change Order Page & Memorandum Page w/Backup - Project Engineer Copy of ONLY Change Order Page - Prime Contractor / Design -Builder Copy of Change Order Page & Memorandum Page w/o Backup - Region Construction Office Original of Change Order Page & Memorandum Page w/Checklist and Approval Documentation - State Construction Office DOT Form 421-005A EF Memorandum Page Revised 12/09