HomeMy WebLinkAbout2019-06-04 - SCJ ALLIANCE - General Agreements / General Service Agreements - 2018-04 (2)CHANGE ORDER Contract Number Contract Title Federal Aid Number 2018-04 Gateway Park Project N/A Change Order Number Change Description Date 3 Tank Oil Removal 5/28/19 Region Project Engineer Phone Number Dan Ireland 509-886-3265 Prime Contractor / Design -Builder KRCI LLC 0 Ordered by Engineer under the terms of Section 1-04.4 of the Standard Specifications or the RFP ❑ Change proposed by Contractor / Design -Builder Change Description Originated as RFI #1. Intent of this change order was to remove oil that was found in one of the two abandoned oil tanks on site. Contract Plan Sheets: No Change Construction Requirements/Special Provisions: No Change Change in Contract Costs: The cost for this Change Order is the cost of KCRI work that exceeded the scope of BI #3: Removal of Structures and Obstructions, and for A Central subcontracted work for cutting into and cleaning out the oil from the tank. Contractor provided Force Account tracking information for work and an invoice from A Central for subcontracted work. KCRI work = $149.74 A Central work = $ 3,037.87 12% markup on subcontracted work = $ 364.54 Total cost = $ 3,552.15 Working Days: There is no change to the critical path with this change. Original Contract Amount Current Contract Amount Est. Net Change This C.O. Est. Revised Contract Amount $ 516,008.00 $ 522,462.21 $ 3,552.15 $ 526,014.36 Prime Contractor / Design -Builder Signature or Method of Concurrence: Project Engineer's Signature for Exec Contracting Authority for Execution: Date ate 05/30/2019 ate (p 141 / 9 Change Order Page