Loading...
HomeMy WebLinkAbout2019-06-04 - SCJ ALLIANCE - General Agreements / General Service Agreements - 2018-04Agookk WashkKjton Stat v// t 7Yumportation Change Order - Minor Change Contract Number Contract Title Federal Aid Number 2018-04 East Wenatchee Gateway Park N/A Change Order Number Change Description Date 5 Additional Stair Wall 5/13/19 Region Project Engineer Phone Number N/A Dan Ireland Prime Contractor / Design -Builder KRCI ❑ Ordered by Engineer under the terms of Section 1-04.4 of the Standard Specifications or the RFP 0 Change proposed by Contractor / Design -Builder Change Description The lower set of stairs on the project did not have a side wall on both sides of the stairs. The Contractor constructed a side wall on the stairs to simply their forming construction of the stairs. The Contractor proposed to leave the additional side wall in place instead of removing it. The Contractor proposed a price for the additional side wall to remain in place and the City accepted. Plans: The side wall will be the same as shown on SP-02 detail "Handrail with Concrete Staircase". Specifications: There are no changes to the Contract specifications. Schedule: This sidewall did not effect the contractors critical path. No working days will be issued. Cost: A lump sum amount was proposed by KRCI (see attached). The cost was agreed upon by the Engineer. The cost will be paid as a new bid item titled "Additional Stair Wall" in lump sum. Original Contract Amount Current Contract Amount Est. Net Change This C.O. Est. Revised Contract Amount $ 516,008.00 $ 522,113.42 $ 348.79 $ 522,462.1 Prime Contractor / Design -Builder Signature or Method of Concurrence: Project Engineer's Signature Contracting Authority Signature for Execution: Date _ 5�i14- C Date 05/14/2019 Date DOT Form 421-005A EF ✓ Change Order Page Revised 12/09