HomeMy WebLinkAbout2018-08-14 - RH2 Engineering Inc - General Agreements / General Service Agreements - 2018-03Original 2 Page No. 1 of 6 Pages Transportation Improvement Board Consultant Supplemental Agreement Agency City of East Wenatchee Project Number 3-E-161(003)-1 Project Name FY 2019 Overlay Project Consulting Firm RH2 Engineering, Inc., 300 Simon Street SE, East Wenatchee, WA 98802 Supplement Phase Supplement for Construction Phase The Local Agency of City of East Wenatchee desires to supplement the agreement entered into with RH2 Engineering, Inc., and executed on February 27, 2018. All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: Section II, SCOPE OF WORK, is hereby amended to include See Attached Exhibit B-1 Scope of Work. Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the Completion Date SUPPLEMENTAL COMPLETION DATE December 31, 2018 Section V, PAYMENT, shall be amended as follows as set forth in Exhibit A MAXIMUM AMOUNT PAYABLE $115,822.07 EXHIBIT A Original Agreement Supplement Total Direct Salary Cost $15,766.34 $15,921.28 $31,687.63 Overhead (Including Payroll Additives) $26,172.13 $26,429.33 $52,601.46 Direct Non -Salary Costs $15,654.00 $6,372.70 $22,026.70 Fixed Fee $4,729.90 $4,776.39 $9,506.29 Total $62,322.37 $53,499.70 $115,822.07 If you concur with this supplement and agree to the changes as stated above, please sign and date in the appropriate spaces below. /_/17 Z—) Agency i ture Date onsulta��n"" igna re Date ttou CONSULTANT SUPPLEMENTAL AGREEEMENT.DOC Original 2 Page No. 2 of 6-Pages EXHIBIT B-1 Scope of Work City of East Wenatchee FY 2019 Overlay Project Supplement No. 1 July 2018 Background This Scope of Work is a supplement to the City of East Wenatchee (City) FY 2019 Overlay project, and details the tasks related to services during construction, including construction contract administration and observation services to be provided by RH2 Engineering, Inc. (131-12). Task 1— Services During Construction Objective: Provide construction contract administration and observation services for the FY 2019 Overlay project. This Scope of Work is based on a thirty (30) working days construction project. Construction contract administration services include time before and after construction is complete. Approach: 1.1 Attend Pre -Construction Conference — Prepare and provide an agenda for the pre -construction conference. Attend the pre -construction conference with RH2's project manager and observer. Provide additional copies of the plans and specifications in accordance with the project documents. 1.2 Coordinate Materials Testing — Coordinate and subcontract with a materials testing lab to facilitate testing of the concrete, asphalt, and earthwork items in accordance with the Washington State Department of Transportation (WSDOT) standard specifications and construction manual. Materials testing will be an on -call service coordinated by RH2. 1.3 Review Submittals — Review submittals for up to twenty (20) materials (Qualified Product Lists (QPLs), Request(s) for Approval of Materials (RAMs), manufacturer certificate of compliance, mix designs, and shop drawings) in accordance with the project plans and specifications. Maintain the RAMS on a weekly basis during construction. 1.4 Provide Construction Observation Services — Provide one (1) part-time project observer for an average of four (4) hours per day throughout construction. Observation duties will include the following: a. Monitoring and documenting the construction contractor's daily operations through daily reports and photographs of the construction. b. Collecting item quantity tickets (IQTs) and measurements of items to be used in preparing the pay estimates. c. Addressing technical issues and questions while onsite. d. Collecting and maintaining records for utilities, earthwork, surfacing, concrete, asphalt, and traffic control items. Maintaining the project ledger for payment of contract items. e. Coordinating with utility purveyors while onsite. 1.5 Respond to Requests for Information (RFIs) and Questions, and Attend Meetings — Provide a weekly site visit by the RH2 project manager, or as requested, to attend project meetings and/or address 1 7/31/20182:10 PM 1:\data\EW\218-038\A-PM\Contract\Sup No.1\Amnd No. 1_SOW_TIB Overlay SDC.docx Original 2 Page No. 3 of 6-Pages City of East Wenatchee Exhibit B-1— Scope of Work FY 2019 Overlay Project Supplement No. 1 technical issues, and to respond to construction contractor questions that cannot be addressed in the field by RH2's observer. 1.6 Prepare Progress Payments — Prepare two (2) pay estimates based on quantities provided by RH2's observer. 1.7 Review Change Orders — Review and prepare up to one (1) change order for City approval. 1.8 Prepare As -Built Drawings — Prepare as -built drawings based on RH2 observations and construction contractor records. 1.9 Provide Project Closeout — Organize and maintain project records for closeout. Prepare letters as required for substantial completion, physical completion, and project completion. 1.10 Provide Project Management Services — Review invoices and budget throughout the construction phase of the project. Communicate observed status of construction and budget with the City on a monthly basis. Coordinate with staff and contractor, and administer request for sublets, and statements of intent. Prepare a weekly statement of working days. Set up RH2's construction files; track, assemble, file, and maintain construction documentation. Assist with Transportation Improvement Board (TIB) funding documentation. Coordinate with outside utilities and agencies affected by the project. Assumptions: • The construction project will last thirty (30) working days. • RH2 will perform Task 1 services up to the level included in the attached Fee Estimate. Additional effort, if needed, will be mutually determined by the City and RH2. • RH2 is not responsible for site safety, nor for determining means and methods or directing the contractor or others in their work. • The City will be the lead inspector for construction of the project. RH2 Deliverables: • Pre -construction conference agenda (ten (10) 8 Y2-inch by 11-inch paper copies). • Plans and specifications in accordance with the project documents. • Submittal reviews (electronic PDF format). • Part-time construction observation. • Attendance at weekly site meetings. • Weekly working days' statements (electronic PDF format). • Two (2) pay estimates (electronic PDF format). • One (1) change order (electronic PDF format). • Project records (electronic PDF format and one (1) printed 11-inch by 17-inch construction record plan set). 2 7/31/2018 2:10 PM 3:\data\EW\218-038\A-PM\Contract\Sup No. 1\Amnd No. 1_SOW_TIB OverlaySDC.docx City of East Wenatchee FY 2019 Overlay Project Project Schedule Original 2 Page No. 4 of 6-Pages Exhibit B-1— Scope of Work Supplement No. 1 Construction of the project is scheduled to begin in the summer of 2018 and continue for thirty (30) working days. Closeout of the project is currently anticipated in December 2018. 3 7/31/2018 2:10 PM 1:\data\EW\218-038\A-PM\Contract\Sup No. 1\Amnd No. 1_SOW_TIB OverlaySDC.docx original _ 2 Page No. r of _Pages Exhibit D-2 Agreed Specific Rates of Pay Consultant: RH2 ENGINEERING, INC Staff Classification Negotiated DSC Overhead Multiplier Fee Multiplier Agreed $ Specific Rates of Pay 137.00 166.00% 30.00% Professional $ 46.28 $ 76.83 $ 13.89 Professionalll $ 50.34 $ 83.56 $ 15.10 $ 149.00 Professional III $ 53.72 $ 89.17 $ 16.11 $ 159.00 Professional IV $ 58.11 $ 96.46 $ 17.43 $ 172.00 Professional V $ 62.16 $ 103.19 $ 18.65 $ 184.00 Professional VI $ 67.57 $ 112.16 $ 20.27 $ 200.00 Professional VII $ 71.62 $ 118.89 $ 21.49 $ 212.00 Professional VIII $ 75.00 $ 124.50 $ 22.50 $ 222.00 Professional IX $ 75.00 $ 124.50 $ 22.50 $ 222.00 Technician I $ 32.77 $ 54.40 $ 9.83 $ 97.00 Technician II $ 35.81 $ 59.45 $ 10.74 $ 106.00 Technician III $ 43.92 $ 72.91 $ 13.18 $ 130.00 Technician IV $ 46.62 $ 77.39 $ 13.99 $ 138.00 Administrative 1 $ 23.31 $ 38.70 $ 6.99 $ 69.00 Administrative II $ 26.69 $ 44.30 $ 8.01 $ 79.00 Administrative III $ 31.42 $ 52.16 $ 9.43 $ 93.00 Administrative IV $ 37.50 $ 62.25 $ 11.25 $ 111.00 Administrative V I $ 44.26 $ 73.47 1 $ 13.28 $ 131.00 In -House Copies B/W - 8.5x11 $ 0.09 In -House Copies B/W - 8.5x14 $ 0.14 In -House Copies B/W - 11x17 $ 0.20 In -House Copies Color - 8.5x11 $ 0.90 In -House Copies Color - 8.5x14 $ 1.20 In -House Copies Color - 11x17 $ 2.00 CAD Plots Large $ 25.00 CAD Plots Full $ 10.00 CAD Plots Half $ 2.50 CAD System Per Hour $ 27.50 GIS System Per Hour $ 27.50 Mileage Current IRS Rate Subconsultants Cost plus 15% Outside direct costs for permit fees, reports, maps, data, reprographics, couriers, postage, and non - mileage related travel expenses that are necessary for the execution of the project and are not specifically identified elsewhere in the contract will be billed at cost. 2/19/2018 2:26 PM J:\data\EW\W40\2018 TIB Overlay\Contract\ EXHIBIT D-2 Continued City of East Wenatchee FY 2019 Overlay Project Supplement No. 1 Fee Estimate Original _ 2 Page No. 6 of 6-Pages Description Total Hours Total Labor Total Subconsultant Total Expense Total Cost ..................................................................................................................... Classification Task 1 Services During Construction 314 $ 47,127 1 $ 6,325 1 $ 48 1 $ 53,500 PROJECTTOTAL 1 314 1 $ 47,127.00 1 $ 6,325.00 1 $ 47.70 1 $ 53,499.70 l:\daG\E W \218-038�1-P MK on V,ct\S up No. I�Amnd No. 1_PE ET I 0-day 5 DC Ism 7131/2018 1:16 PM